barrier DOCK-SAFE Operating and maintenance manual

DOCK-SAFE
MANUAL BOOM GATE
Installation Procedure
IP34_Installation Procedure - Boom Gate © Copyright 2018 www.barriergroup.com.au
x1
x1
x1
NOT TO SCALE
CONTENTS
AB
STANDARD
4500mm
C
IP34_Installation Procedure - Boom Gate © Copyright 2018 www.barriergroup.com.au
STEP 1
4x M20 fixing to suit
IP34_Installation Procedure - Boom Gate © Copyright 2018 www.barriergroup.com.au
STEP 2 STEP 3
2x M12 x 40 zinc hex bolt
2x M12 zinc nylock nut
4x M12 bright washer
IP34_Installation Procedure - Boom Gate © Copyright 2018 www.barriergroup.com.au
STEP 4
CLOCKWISE
TO INCREASE
SPRING TENSION
ANTI-CLOCKWISE
TO LOOSEN
SPRING TENSION
GATE SPEED MUST BE
ADJUSTED PRIOR
TO FIRST USE
Counter weights
inserted here
if required
Note: Adjust spring tension so that
gate rises to approx. 30 degrees, as shown,
when released from the down position.
Note: On shorter gates,
additional counter weights
may be required to overcome
the strength of the spring.
If required, please contact our
customer service department
for assistance.


IP34_Installation Procedure - Boom Gate © Copyright 2018 www.barriergroup.com.au
STEP 6
2 x 10ga x16mm wafer head
STEP 5
2 x 10ga x16mm wafer head
4 x M12 fixing to suit
CAUTION message
must be applied on
rail prior to operation
Recommended
500mm
Recommended
1000mm
IP34_Installation Procedure - Boom Gate © Copyright 2018 www.barriergroup.com.au
STEP 6
2 x 10ga x16mm wafer head
STEP 5
2 x 10ga x16mm wafer head
4 x M12 fixing to suit
CAUTION message
must be applied on
rail prior to operation
Recommended
500mm
Recommended
1000mm
IP34_Installation Procedure - Boom Gate © Copyright 2018 www.barriergroup.com.au
www.barriergroup.com.au
IP34_Installation Procedure - Boom Gate © Copyright 2018
Important information.
Read carefully.
Keep this information for further reference.
WARNING
The gate will not provide optimum performance unless it is installed correctly. For satisfactory gate
operation please follow the instructions carefully.
NOTE: No guarantee will be given or responsibility accepted by the manufacturers if the gate is not
installed as instructed. Barrier Group do not warrant the work of 3rd party contractors.
BEFORE YOU START
1. The installer must ensure the desired mounting point for the gate is level, plumb and rigid.
2. Use fixings appropriate to the material into which they are being fixed (not included).
3. Check all parts are included. Contact Barrier Group immediately if you are missing a piece.
AFTER INSTALLATION CARE
Barrier Group recommends that you check the operation of your gate at least every six months
(more regularly in extreme environments or frequent use). It is natural for spring assistance unit
to lose some tension over time. Adjustment may be required. The adjustment should be carried
out as per the attached instructions. Spring should be adjusted to achieve a gentle stop, to avoid
potential damage.

Other barrier Fencing & Gate manuals

barrier MSG5000 Operating and maintenance manual

barrier

barrier MSG5000 Operating and maintenance manual

barrier MEZZANINE GATE Operating and maintenance manual

barrier

barrier MEZZANINE GATE Operating and maintenance manual

barrier TBG3800 Operating and maintenance manual

barrier

barrier TBG3800 Operating and maintenance manual

barrier DOCK-SAFE Operating and maintenance manual

barrier

barrier DOCK-SAFE Operating and maintenance manual

Popular Fencing & Gate manuals by other brands

Diversified Fall Protection Swing Gate installation manual

Diversified Fall Protection

Diversified Fall Protection Swing Gate installation manual

Zippity ALL AMERICAN Assembly instructions

Zippity

Zippity ALL AMERICAN Assembly instructions

Casanoov KIT-000018 manual

Casanoov

Casanoov KIT-000018 manual

Animex AMX T48 quick start guide

Animex

Animex AMX T48 quick start guide

Vente Unique UV08-5 manual

Vente Unique

Vente Unique UV08-5 manual

Casanoov 100P160 instruction manual

Casanoov

Casanoov 100P160 instruction manual

Venlo BUILDTUFF COMPOSITE SPIGOT installation guide

Venlo

Venlo BUILDTUFF COMPOSITE SPIGOT installation guide

Wayne-Dalton DS-50 installation instructions

Wayne-Dalton

Wayne-Dalton DS-50 installation instructions

Royal Outdoor Products Cascade installation instructions

Royal Outdoor Products

Royal Outdoor Products Cascade installation instructions

CAI SG-60-PCY installation instructions

CAI

CAI SG-60-PCY installation instructions

Fac 800 Series Assembly instructions

Fac

Fac 800 Series Assembly instructions

Jerith Aluminum Ornamental Fence installation instructions

Jerith

Jerith Aluminum Ornamental Fence installation instructions

Betafence Nylofor square post installation manual

Betafence

Betafence Nylofor square post installation manual

Laguna Tools Drift Master installation manual

Laguna Tools

Laguna Tools Drift Master installation manual

Ares Citadel Panel installation instructions

Ares

Ares Citadel Panel installation instructions

Zippity Baskenridge Assembly instructions

Zippity

Zippity Baskenridge Assembly instructions

Fortress Technologies Osbourn IBL-H operating instructions

Fortress Technologies

Fortress Technologies Osbourn IBL-H operating instructions

IKEA PATRULL KLÄMMA manual

IKEA

IKEA PATRULL KLÄMMA manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.