INSTALLING THE IONIZING AND OXIDIZING PODS
MAKING THE JOINER WHEN INSTALLING PODS END-TO-END
Check these drawings to determine which Pods
you have :
! Do you have 40mm (1⁄") or 50mm (2") pipe ? For
your reference, the diameter of 40mm (1⁄")pipe is
48mm and the diameter of 50mm (2") pipe is
60mm.
There are several main considerations to take into
account before starting the installation :
Small Pod
Installation of the Spa Star Pods is very flexible, and «
can be tailored to suit the limited space and pipe
lengths often associated with Spas.
! If you do have 50mm (2") pipe, did you purchase
the Spa Star with small Pods to suit 40mm (1⁄") «
pipe, or with large pods to suit 50mm (2") pipe ?
Large Pod
! If you are installing Small Pods onto 50mm (2")
pipe, then you must use 50x40 (2"x1⁄")
adaptors. These are not supplied with the Bionizer
kit, but can be ordered by request. They can also
be found at most hardware and plumbing outlets.
To install Small Pods end-to-end onto 50mm (2")
pipe (with adaptors), requires 530mm (21") of
straight pipe.
To install Small Pods end-to-end onto 40mm (1⁄")
pipe, requires 360mm (14") of straight pipe.
Illustration of end-to-end joiner :
If the two Pods can be fitted end-to-end, then
make up a joiner as per the instructions below.
Making this in advance will make installation
quicker and easier.
! Will both Pods be fitted end-to-end on one
straight section of pipe, or will they be installed
onto two separate sections of pipe ?
To install Large Pods end-to-end onto 50mm (2")
pipe requires 480mm (19") of straight pipe.
Check these drawings to determine which Pods
you have :
! Do you have 40mm (1⁄") or 50mm (2") pipe ? For
your reference, the diameter of 40mm (1⁄")pipe is
48mm and the diameter of 50mm (2") pipe is
60mm.
There are several main considerations to take into
account before starting the installation :
Small Pod
Installation of the Spa Star Pods is very flexible, and «
can be tailored to suit the limited space and pipe
lengths often associated with Spas.
! If you do have 50mm (2") pipe, did you purchase
the Spa Star with small Pods to suit 40mm (1⁄") «
pipe, or with large pods to suit 50mm (2") pipe ?
Large Pod
! If you are installing Small Pods onto 50mm (2")
pipe, then you must use 50x40 (2"x1⁄")
adaptors. These are not supplied with the Bionizer
kit, but can be ordered by request. They can also
be found at most hardware and plumbing outlets.
To install Small Pods end-to-end onto 50mm (2")
pipe (with adaptors), requires 530mm (21") of
straight pipe.
To install Small Pods end-to-end onto 40mm (1⁄")
pipe, requires 360mm (14") of straight pipe.
Illustration of end-to-end joiner :
If the two Pods can be fitted end-to-end, then
make up a joiner as per the instructions below.
Making this in advance will make installation
quicker and easier.
! Will both Pods be fitted end-to-end on one
straight section of pipe, or will they be installed
onto two separate sections of pipe ?
To install Large Pods end-to-end onto 50mm (2")
pipe requires 480mm (19") of straight pipe.
156mm (6")
Check these drawings to determine which Pods
you have :
! Do you have 40mm (1⁄") or 50mm (2") pipe ? For
your reference, the diameter of 40mm (1⁄")pipe is
48mm and the diameter of 50mm (2") pipe is
60mm.
There are several main considerations to take into
account before starting the installation :
Small Pod
Installation of the Spa Star Pods is very flexible, and «
can be tailored to suit the limited space and pipe
lengths often associated with Spas.
! If you do have 50mm (2") pipe, did you purchase
the Spa Star with small Pods to suit 40mm (1⁄") «
pipe, or with large pods to suit 50mm (2") pipe ?
Large Pod
! If you are installing Small Pods onto 50mm (2")
pipe, then you must use 50x40 (2"x1⁄")
adaptors. These are not supplied with the Bionizer
kit, but can be ordered by request. They can also
be found at most hardware and plumbing outlets.
To install Small Pods end-to-end onto 50mm (2")
pipe (with adaptors), requires 530mm (21") of
straight pipe.
To install Small Pods end-to-end onto 40mm (1⁄")
pipe, requires 360mm (14") of straight pipe.
Illustration of end-to-end joiner :
If the two Pods can be fitted end-to-end, then
make up a joiner as per the instructions below.
Making this in advance will make installation
quicker and easier.
! Will both Pods be fitted end-to-end on one
straight section of pipe, or will they be installed
onto two separate sections of pipe ?
To install Large Pods end-to-end onto 50mm (2")
pipe requires 480mm (19") of straight pipe.
100mm (4")
INSTALLATION
(b) Fit two barrel union nuts over the pipe, so that
the threads are both facing OUTSIDE.
For large Pods, the joiner pipe should be 60mm long.
(a) Glue one flange to the pipe.
Using a short length piece of pipe and two of the
barrel unions supplied with the Spa Star kit, make «
up a joiner for connecting the two Pods end-to-end.
For small Pods, the joiner pipe should be 50mm long.
(c) Glue the second flange to the pipe.
ALWAYS USE PVC PRIMER ON BOTH SURFACES BEFORE GLUEING ANY PVC PARTS.