BOERPLAY Trio Swing XL User manual

PSTE000.025
Trio Swing XL

Benaming
Title
Opmerking
Comment
Datum
Date
Tekening
Drawing
TOE PST 000 025 C
Trio Schommel XL
Adventure Play
13-7-2015
BOER
SPEELTOESTELLEN
Afmetingen
Dimensions
1,99m
>0,35m
>0,40m
>0,35m
0,00 m
2,52 m
2,65 m
3,00 m
7,92 m

Benaming
Title
Opmerking
Comment
Datum
Date
Tekening
Drawing
TOE PST 000 025 C
Trio Schommel XL
Adventure Play
13-7-2015
BOER
SPEELTOESTELLEN
Obstakelvrije zone
Obstacle free zone
Obstakelvrij WAS
Obstacle free WAS
Opvangzone
Impact area
Obstakelvrij EN-1176
Obstacle free EN-1176
7,80m
8,41m
8,92 m
6,70 m
8,41m
7,41m
3,29m
R1,50m
10,93 m

Benaming
Title
Opmerking
Comment
Datum
Date
Tekening
Drawing
TOE PST 000 025 C
Trio Schommel XL
Adventure Play
13-7-2015
BOER
SPEELTOESTELLEN
Bodemplan
Groundplan
0,90 m
>0,40 m
0,45 m 2,61 m 2,65 m 2,61 m 0,61 m
0,58 m 2,61 m 2,65 m 2,61 m 0,48 m
2,85m
0,64 m
0,61m
2,76m
rondmarkering
Ground le el marker

Benaming
Title
Opmerking
Comment
Datum
Date
Tekening
Drawing
TOE PST 000 025 C
Trio Schommel XL
Adventure Play
13-7-2015
BOER
SPEELTOESTELLEN
Modules
Modules
OpmerkingBenamingRev.Bew.VolgnrProgr.Type
#
Nr
Adventure PlayDuo XL SC M Frame trio
B
013001PSTMOD
11
SchommelzitjePST - Vogelnest 1,0 m
001003PSTMOD
1
2
Ketting 2,0 m
Schommelzitje
002003PSTMOD23
33
21
Typeplaatje
Identification plate
B

Benaming
Title
Opmerking
Comment
Datum
Date
Tekening
Drawing
TOE PST 000 025 C
Trio Schommel XL
Adventure Play
13-7-2015
BOER
SPEELTOESTELLEN
Montage
Mounting
Geleverde delen:
A - bovenbalk met vogelnest
B - driehoekframe 1
C - driehoekframe 2 (2x)
D - driehoekframe 3
E - bovenbalk met schommel (2x)
Bevestiging sets:
1 - M12 draadeind met moeren
Montagevolgorde:
1 - graaf de gaten volgens het bodemplan en plaats hierin de frames B en C
2 - plaats E op de frames en bevestig met 1
3 - plaats het tweede frame C en frame D
4 - plaats en bevestig hierop bovenbalk E met 1
5 - plaats balk A en bevestig met 1
6 - controleer of het toestel voldoet aan de afmetingen zoals op blad 'afmetingen'
7 - dicht de gaten en verdicht het zand
Controles:
1 - correcte opbouw en alle bevestigingsmiddelen
2 - de vrije hoogte onder het vogelnest en de schommels (>4 cm)
3 - controleer de afmetingen van de valbodem t.o.v. het toestel
Supplied parts:
A - upper beam with birdnest
B - triangle frame 1
C - triangle frame 2 (2x)
D - triangle frame 3
E - upper beam with swing (2x)
Mounting kits:
1 - M12 threaded rod with nuts
Assembly sequence:
1 - dig the holes according to the ground plan and place the frames B and C
2 - place E on the frames and fix with 1
3 - place frame D and the second frame C
4 - place and mount beam E with 1 on top
5 - place beam A on top and fixate with 1
6 - check that the equipment conforms to the dimensions shown on sheet 'dimensions'
7 - close the holes and compact the sand
Checks:
1 - correct assembly and all the fasteners
2 - the free height underneath the birdnest and swing (>4 cm)
3 - check the dimensions of the safety area compared to the play equipment
rondmarkering
Ground le el marker
rondmarkering
Ground le el marker
rondmarkering
Ground le el marker
rondmarkering
Ground le el marker
A
B
E
E
C
C
D

LOGBOOK
(Onderstaand logboek kan gebruikt worden om te voldoen aan de eisen, gesteld in artikel 14 van het Warenwetbesluit Attractie- en Speeltoestellen)
Type indication Adventure Play
Product code PSTE000.025
Name of equipment Trio Schommel XL
Maximum height of fall 1,5 m
Year of construction 2017
Certificate 031376
inspection authority TUV Nederland QA BV
De Waal 21c, Best - 5684 PH Best
Name manufacturer BOERplay
Hyacintstraat 2 - 4255 HX Nieuwendijk
Phone: +31 (0)183 40 23 66
Fax: +31 (0)183 40 35 64
name installer
Description of equipment Trio Swing XL
Location of equipment
Data about the owner of the play equipment
Name:
Address:
Postcode and town:
Contact person:
Telephone number:
Data about the administrator of the play equipment
Name:
Address:
Postcode and town:
Contact person:
Telephone number:
PSTE000.025
Trio Swing XL

LOGBOOK
Inspection and maintenance intervals
Nr.
Inspection Maintenance
months
between
inspections
1
Verify equipment's stability, junctions and missing parts.
Inspect bolts, screws and nuts for absence, jams, corrosion
and wear.
Add missing parts, secure joints, apply missing fixing
agent and replace corroded parts.
1
2
Chec suspension for wear. Replace worn parts and/or remove non-functioning
parts.
1
3
Inspect rotating parts such as hinges, rolling-element
bearings, etc. for wear and acceptability.
Replace worn parts and/or remove non-functioning
parts.
1
4
Chec wood for splinters, unacceptable damage and signs of
rot. Especially at ground level.
Repair damage. Replace affected wood. Smoothen
splintered wood and sharp edges.
1
5
Inspect foundation for stability, tearing and coverage. Restore foundation and covering material.
3
6
Examine rubber and synthetic parts for wear, damage and
brea . Replace original parts.
3
7
Inspect metal for corrosion and damage in the coating. Restore any damaged coating (after removing rust and
applying primer).
6
Chec ropes, cables, chains and nets for wear and damage.
Steel cables and nets which are tensioned must be chec ed
for tension.
Replace parts where necessary. Steel cables and nets
must be tensioned.
3
9
Inspect equipment for unsafe changes and additions. Remove unsafe additions and correct unsafe changes.
1
10
Inspect safety surfaces. Restore and repair where necessary.
1
Remarks
1. If used intensively, all points require extra attention.
2. Extreme weather conditions and locations may require a higher inspection frequency. Discuss this with
the supplier.
3. Vandalism-sensitive locations require stricter inspections, possibly daily.
4. Check the terrain regularly for items that do not belong there, are unsafe or may be used wrongly.
Examples are poisonous plants, glass shards, etc. Frequency depends on strain.
5. Remember that bad maintenance leads to unsafe conditions and notably faster impoverishment of the
playground area.
6. Replacement parts can be ordered at the manufacturer with the part numbers on the module drawing.
Drawings can be found in de user guide.
7. The impact area shall be provided with impact attenuating surface according to the specified falling
height.
. This list is conform the CEN-standard "playground equipment and surfacing NEN-EN 1176-7".


Benaming
Title
Opmerking
Comment
Datum
Date
Tekening
Drawing
MOD PST 001 013 B
Duo XL SCHM Frame trio
Adventure Play
13-7-2015
BOER
SPEELTOESTELLEN
Samenstelling module
Assembly module
Opmerking
BenamingRev.Bew.
Volgnr
Progr.Type#
Nr
Len te =2400
Paal 14-16
024160PSTOHO2
1
Len te =3600
Paal 14-16
036160PSTOHO12
AdventureplayVoetplaat Groot 160
VZP
060PSTOME83
SchommelsA-Frame 2
004100PSTSHO2
4
Schommels
A-Frame 1
B
001100PSTSHO2
5
41 5 2 5 4
1
3

Benaming
Title
Opmerking
Comment
Datum
Date
Tekening
Drawing
MOD PST 001 DRW
Schommel Ophangsysteem
Adventure Play Schommels
13-1-2016
BOER
SPEELTOESTELLEN
Samenstelling module
Assembly module
0,46 m0,58 m 0,72 m
> 0,70 m
> 0,60 m
> 0,60 m
0,36 m 0,73 m 1,86 m 0,58 m
> 0,60 m > 0,60 m
> 0,60 m
1,86 m 0,46 m 0,64 m 0,58 m 0,72 m 0,58 m 0,30 m
> 0,60 m
> 0,70 m> 0,60 m
0,76 m( )
0,72 m( )
0,56 m( )
1,06 m( )
0,87 m( )
0,79 m( )
0,55 m( )
1,10 m( )

Benaming
Title
Opmerking
Comment
Datum
Date
Tekening
Drawing
MOD PST 003 001 A
PST - Vogelnest 1,0 m
Schommelzitje
2-3-2017
BOER
SPEELTOESTELLEN
Samenstelling module
Assembly module
Opmerking
BenamingRev.Bew.
Volgnr
Progr.Type#
Nr
M12 - RVS A2-70
Borgdo moer
025012011BSR41
M12 x 140 - RVS A2-70
Slotbout
140012026BSR42
M12 - RVS A2-70
Sluitring
003012030BSR
4
3
5 mm, RVS A2-70
D-Sluiting
000005031BSR
44
RVS A2-70Scharnier dubbel NORMAAL
092012081BSR2
5
balk 2,5 mVogelnest Ø1,0 m
100001NST
DRD1
6
0,18 m langRVS ketting 5mm
018002005
KET
2
7
6
1
3
2
Hoek ketting > 60° (ketting niet strak)
Opening altijd < 157x89 mm

Benaming
Title
Opmerking
Comment
Datum
Date
Tekening
Drawing
MOD PST 003 002
Schommelzitje
Ketting 2,0 m
16-12-2016
BOER
SPEELTOESTELLEN
Samenstelling module
Assembly module
Opmerking
BenamingRev.Bew.
Volgnr
Progr.Type#Nr.
M12 - RVS A2-70
Borgdopmoer
025012011BSR
1
M12 x 1 0 - RVS A2-70
Slotbout
1 0012026BSR2
M12 - RVS A2-70
Sluitring
003012030BSR3
RVS A2-70
Schommelscharnier
091012081BSR2
Zitje incl. ketting
090200
ZIT
SMD
15
M8 x 25 - RVS A2-70
Zeskantbout
025008021BSR
5.1
M8 - RVS A2-70Sluitring
002008030BSR
5.2
Zwart
Schommelzitje CNK
090001
ZIT
CNK
1
5.3
Met vork 2,5 mSchommelketting 5mm
250005
KETRNT
2
5.
1
3
4
2
5.4
5.3
5.2
5.1
This manual suits for next models
1
Table of contents
Other BOERPLAY Swing Set manuals
Popular Swing Set manuals by other brands

Belleze
Belleze 014-HG-14340 owner's manual

Soulet
Soulet 004632 Assembly instructions

Taizhou Taiyan Swing
Taizhou Taiyan Swing 805-447 Instruction

KidKraft
KidKraft LAUREL F29715 Installation and operating instructions

Backyard Discovery
Backyard Discovery VISTA 54273 owner's manual

HAGS
HAGS Lilly Expansion module w Katja installation guide

Backyard Discovery
Backyard Discovery MONTICELLO 35015 owner's manual

sweeek.
sweeek. GALERNE PS170MBGRE Assembly instructions

Graco
Graco 1423 owner's manual

Cedar Summit
Cedar Summit F25630 Installation and operating instructions

Component Playgrounds
Component Playgrounds CP-AF36-8 manual

Ledon
Ledon 1188 Assembly instructions