
MG-3 Infrared Installation
24/24/2017 Bradley • 215-1322 Rev. Y; ECN 17-08-010
WARNING
Make sure that all water supply lines have been flushed and then completely turned off before beginning
installation. Debris in supply lines can cause valves to malfunction.
Turn OFF electrical power to the electrical outlets, then unplug all electrical units prior to installation. Electrical
power MUST remain off until installation is complete. After installation is complete, turn on the water supply
first, then turn on the electrical power.
Hardware supplied by installer must be appropriate for wall construction. Wall anchors must have a
minimum pull-out rating of 1,000 lbs. Follow appropriate dimensions for standard or juvenile height based on
configuration and required rim height. Overtightening fasteners can damage the Terreon® material. Use caution
when tightening bowl and sprayhead fasteners.
IMPORTANT
Read this entire installation manual to ensure proper installation. For optional soap dispenser, refer to
installation instructions for Express Lavatory System MG-Series document 215-1585. When finished with the
installation, file this manual with the owner or maintenance department. Compliance and conformity to local
codes and ordinances is the responsibility of the installer. Product warranties may be found under "Products"
on our Web site at www.bradleycorp.com.
Separate parts from packaging and make sure all parts are accounted for before discarding any packaging
material. If any parts are missing, do not begin installation until you obtain the missing parts.
Supplies Required
• (8) 3/8" wall anchors, bolts and 1" min. O.D. washers to mount main frame and bowl to wall (minimum pull-out rating
of 1,000 lbs.)
• 1/2" nominal copper tubing for hot and cold supplies and 1-1/2" NPT drain piping
• 120V/220V 50/60 Hz power source using Bradley supplied 120VAC/12V DC plug-in adapter