
Table of Contents
SECTION 1 General Information
1.A Introduction....................................................... 5
1.B Warranty ........................................................... 5
1.C ModelIdentication........................................... 5
1.D Safety Notes ..................................................... 6
1.E Model Overview................................................ 8
1.F Dimensions....................................................... 8
1.G The Installation Kit ............................................ 9
SECTION 2 Locating the unit
2.A Locating the unit ............................................. 10
2.B Correct Vent Distance from Outside Wall or Roof
Termination ..................................................... 10
SECTION 3 Venting and Combustion Air
3.A General Venting.............................................. 11
3.B Combustion Air ............................................... 12
3.B.1 Combustion Air From Room ........................... 12
3.B.2 Ducted Combustion Air................................... 13
3.C Venting............................................................ 14
3.C.1 Common Venting ............................................ 14
3.C.2 Venting Requirements Unique to Canada ...... 14
3.D Locating the Vent and Combust Air Terminals 15
3.D.1 Side Wall Vent Terminal.................................. 15
3.D.2 Side Wall Combustion Air Terminal................. 17
3.D.3 Vertical Vent Terminal ..................................... 18
3.D.4 Vertical Combustion Air Terminal.................... 18
3.D.5 Installations in the
Commonwealth of Massachusetts.................. 18
3.E Common Vent Test ......................................... 18
3.F Outdoor Installation ........................................ 19
3.G Condensate Drain Trap .................................. 19
SECTION 4 Gas Supply and Piping
4.A Gas Supply and Piping ................................... 20
SECTION 5 Pump Requirements
5.A Boiler Flow and Head Requirements.............. 22
SECTION 6 Water Connections
6.A Boiler systems ................................................ 23
6.A.1 Boiler System Piping:
Hot Supply Connections ................................. 23
6.A.2 Boiler Cold Water Make-Up ............................ 23
6.A.3 Boiler Freeze Protection ................................. 24
6.A.4 Condensate Drain Trap .................................. 24
6.A.5 Boiler Suggested Piping Schematics.............. 24
6.B WATER Heater systems ................................. 29
6.B.1 Water Heater Quality ...................................... 29
6.B.2 Water Heater Piping Requirements ................ 29
6.B.3 Heater Cold Water Make-Up .......................... 30
6.B.4 Heater Freeze Protection ............................... 30
6.B.5 Heater Suggested Pumps .............................. 30
6.B.6 Condensate Drain Trap .................................. 30
6.B.7 Water Heater Suggested Piping Schematics . 31
SECTION 7 Electrical Connections
7.A Main Power..................................................... 33
7.B Pump Connections ......................................... 33
7.C Optional Variable Speed Pump Control.......... 35
7.D 24 VAC Transf w/ Integral Circuit Breaker ...... 35
7.E Signal Connections......................................... 35
7.F OptionalLowWaterCutO(LWCO).............. 35
7.G Other Optional Field Connections .................. 35
7.H Building Automation System Connections...... 36
7.I Lead Lag Connections & Wiring Diagram ...... 37
7.J Wiring Diagram............................................... 38
7.K Ladder Diagrams ............................................ 40
7.L About the Touch Screen Display .................... 42
SECTION 8 Using the touch screen
8.A Using the Touch Screen ................................. 44
8.B The Gauges.................................................... 46
8.C While Operating - Checking Lead Lag
Operating Information..................................... 46
8.D Checking the Lead Lag Leader ...................... 46
8.E Checking Individual Parameters..................... 47
8.F Checking Individual Details ............................ 48
8.G ConguringParametersonControllers .......... 48
8.H VericationProcessforSafetyParameters .... 49
B
RADFORD
W
HITE