BYD Energy Pod Series Operating instructions

Secret
BYD Energy Pod
Household Energy Storage System
User‟s Installation and Use Manual
—————————————————————————————————————————————
Energy Pod 3kW/7.2kWh AC, Energy Pod 4kW/9.6kWh AC, Energy Pod 5kW/12kWh AC, Energy Pod 5kW/14.4kWh AC
V1.0
_____________________________________________________
Note: Please read and understand all the contents of this Manual carefully before installation and
use of the product, and please keep this Manual properly for look-up at any time.

Secret
Table of Contents
I. About this Manual ............................................................................................................ 1
1 Description ........................................................................................................................1
2 Introduction ......................................................................................................................1
3 Nameplate.........................................................................................................................1
II. Safety ................................................................................................................................ 2
1 Symbols .............................................................................................................................2
2 Environmental Requirements............................................................................................3
3 Safety Requirements for Installation.................................................................................3
4 Safety Requirements for Use.............................................................................................4
III. Compliance ......................................................................................................................... 4
IV. Product Descriptions ......................................................................................................... 4
1 Product Introduction.........................................................................................................5
2 System Parameter .............................................................................................................5
3 Product Composition ........................................................................................................6
4 Product Functional Logic...................................................................................................9
5 System Functions ..............................................................................................................9
6 Monitoring ......................................................................................................................11
V. Installation ...................................................................................................................... 12
1 Installation Instructions...................................................................................................12
2 Location...........................................................................................................................13
3 Installation Preparations .................................................................................................15
4 Formal Installation ..........................................................................................................18
5 Check and Confirmation..................................................................................................29
6 Description of on/off and Status.....................................................................................29
7 Installation Submission ...................................................................................................30
8 Induction and Training of the System Owner/Operator..................................................31
VI. Frequently Asked Questions and Maintenance ............................................................ 32
1 Frequently Asked Questions and Solutions.....................................................................32
2 Fault Code .......................................................................................................................32
3 Cleaning...........................................................................................................................34
4 Routine Maintenance......................................................................................................34
VII. Quality Assurance.......................................................................................................... 35
VIII. Contact Us ...................................................................................................................... 36

Secret
1
I. About this Manual
Thank you very much for choosing the BYD Energy Pod household energy storage
system developed and produced by BYD. We sincerely believe that our products can
satisfy your needs, and also look forward to your feedback on the performance of the
product during use, so that we can further improve the quality of the product.
1 Description
The BYD Energy Pod User‟s Installation and Use Manual is applicable to the
installation and use of four types of products: Energy Pod 3kW/7.2kWh AC,
Energy Pod 4kW/9.6kWh AC, Energy Pod 5kW/12kWh AC, Energy Pod
5kW/14.4kWh AC.
Please read and understand all the contents of this Manual carefully before
installation and operation of the product. Any loss caused by ignoring the
contents of this Manual may void the warranty of the product.
This product is used only according to the documents provided and local
standards, laws and regulations. Any other use may cause the personal injury
and property damage.
The drawings provided in this Manual are for explanation of the relevant concepts
of the product, including product information, installation guide, instructions for
use, safety information, frequently asked questions and maintenance, etc.
The products can‟t be changed or modified without the prior explicit written
approval of BYD. Any unauthorized changes will void the BYD Energy Pod
warranty letter, and BYD will not be responsible for any losses caused thereby.
This Manual and other product-related documents are an integral part of the
product and need to be properly kept for the on-site installation personnel and
relevant technical personnel to look up further.
2 Introduction
This Manual contains the product information, installation guide, instructions for use,
safety information, frequently asked questions and maintenance, etc. of the BYD
Energy Pod.
3 Nameplate
The product nameplate may be found on the PCS as follows:

Secret
2
II. Safety
Before formally installing and operating this product, please read this part carefully
and strictly implement its contents.
During installation and use of this product, in order to prevent the personal injury and
property loss and ensure the long-term usage of this product, the installation
personnel and user shall abide by the articles and regulations of the relevant local
laws and comply with all safety provisions and usage specifications of this Manual.
BYD will not be responsible for any damage to the product or personal injury caused
due to any operation and usage that violates the above-mentioned relevant contents,
and will no longer provide any quality assurance service.
1 Symbols
Note: This product contains the following symbols, please pay attention to
identifying.
If the symbols are missing or illegible, please contact your dealer.
Hot surface
Make keep ventilation
Ground connection. EC 60417-5019(2011-01)

Secret
3
2 Environmental Requirements
Do not install and use this product in an environment with temperatures below
-10℃ or above 50℃
Do not install and use this product near any heat source or combustible
materials
Do not install and use this product in the areas where the persons frequently
move
Do not expose this product to the corrosive gas or liquid
Do not expose this product to the direct sunlight for a long time
Do not expose this product to the direct rainfall/snow
Please install and use the product far away from the children and animals
The product shall be installed with a maximum altitude of 2000m
The sufficient space shall be reserved for the installation of product, to ensure
the adequate ventilation.
3 Safety Requirements for Installation
The safety protective equipment used in the process of installation shall meet
the regulations on use of protective equipment
Any unclear safety symbols and warning messages on the product shall be
replaced immediately
The transportation, installation and commissioning of the product must be
carried out under the specified conditions
The installation and commissioning personnel of the product shall obtain the
local electrician qualification
The installation and commissioning personnel of the product shall receive the
corresponding training and obtain the qualification for installation and

Secret
4
commissioning of the product
The installation and commissioning personnel of the product shall have the
ability to evaluate the potential risks
Before commencement of installation, the installation personnel shall identify all
safety risks at the site and implement the necessary safety risk controls
Please read and understand the safety information in this Manual carefully
before commencing the installation.
4 Safety Requirements for Use
Do not touch the battery module with the wet hands, in order to avoid the
electric shock
Do not squeeze, impact or puncture the battery, in order to avoid the
unnecessary damage and loss
Store and use the battery according to the instructions in this Manual, and
comply with the relevant local laws and regulations and relevant safety
standards
Before installation, replacement, repair and maintenance, remove all metal
objects (e.g., keys) that may cause a short circuit
Ensure that the fuse on the base is not installed prior to all installation,
replacement and maintenance processes
This product shall be repaired, replaced and maintained by the authorized
personnel with electrician qualification
It„s forbidden to reverse the polarity of the battery
The electrolyte of the battery will harm the skin and eyes; do not damage or
disassemble the battery
Disconnect the battery with the grid/load before installation and maintenance,
and then disconnect the battery supply
In the process of transporting, handling and storing the product, do not stack the
unpacked products, in order to avoid the irreversible damage.
The packaged battery modules shall not be stacked in excess of the specified
quantity.
III. Compliance
The BYD Energy Pod product range has been designed and manufactured to comply with
the requirements of the relevant Australian and New Zealand Standards
The product design has been independently certified and carries the RCM
marking and is listed on the Australian Government ERAC website
The BYD Energy Pod is also designed in compliance with the Australian Best
Practice Guide: Battery Storage Equipment – Electrical Safety Requirements.
IV. Product Descriptions

Secret
5
1 Product Introduction
The BYD Energy Pod is a new generation of the household energy storage system
which can meet the diversified needs of the users around the world. The high-
performance lithium iron phosphate battery is adopted, and the functional integration
and modular structural design are carried out, so as to achieve the convenient
capacity expansion and quick product installation, and realize the functions, such as
load matching, remote control, emergency power supply and so on.
The single-phase AC system topology is shown as follows:
2 System Parameter
This series of product has four different types: Energy Pod 3kW/7.2kWh AC, Energy
Pod 4kW/9.6kWh AC, Energy Pod 5kW/12kWh AC, Energy Pod 5kW/14.4kWh AC.
The users can select the specific quantity of batteries to meet the different needs.
Product Technical Parameter Table:
Type
Energy Pod
3kW/7.2kWh AC
Energy Pod
4kW/9.6kWh AC
Energy Pod
5kW/12kWh AC
Energy Pod
5kW/14.4kWh AC
Battery
3
4
5
6
PCS
1
1
1
1
BMS
1
1
1
1
Base
1
1
1
1
On-grid
Nominal Power
(230,50Hz)
3kVA
4kVA
5kVA
5kVA
Nominal Current
13A
17.4A
21.7A
21.7A
Nominal Voltage
230V
Nominal Frequency
50Hz
Power factor
0.85lagging~0.85 leading
Phase
Single phase
Off-grid【1】
Nominal Power
/
3kW
4kW
4kW

Secret
6
【1】 The emergency power supply is available in case of grid fault, and can only
be used to power the specific loads. The system cannot be started without
connecting to the power grid.
【2】 In case of ambient temperature below 20℃ or above 40℃, the output
power of the system will decrease.
3 Product Composition
The product is designed in a modular structure and consists of the PCS, BMS, Battery
and Base.
Nominal Current
/
13A
17.4A
17.4A
Nominal Voltage
/
230Vac
Nominal Frequency
/
50Hz(Default)/60Hz, Single phase
Battery
Capacity
7.2kWh
9.6kWh
12kWh
14.4kWh
Battery
Voltage/Range
96Vdc/(84~108)
128Vdc/(112~144)
160Vdc/(140~180)
192Vdc/(168~216)
DOD
>90%
Other
Ingress Protection
rating
IP55
Dimension L* D* H
755*295*1155mm
755*295*1325mm
755*295*1490mm
755*295*1655mm
Noise
40dB(A)
Weight
124kg
152kg
180kg
208kg
Inverter Topology
Non-Isolated
Work Temp.
-10℃~50℃【2】
Communication Port
LAN/RS485
Interaction
Button
Arc Flash Calculation
Arcing Time (Tarc)
(sec)
0.001 (1ms)
Battery Fault Current
(Ibf) (A) – Bolted
Current
1660
Example
(using the equations
from AS/NZS 5139):
For a 9.6kWh unit, working at 20cm distance on part of the battery system
Arc Flash incident energy (cal/cm2)
= 0.01 x 160 x (1660/2) x (0.001/202) x 3
= 0.01 cal/cm2

Secret
7
3.1 PCS
PCS Parameter Table:
Parameter
Value
DC voltage range
84~216Vdc
Maximum DC current
40Adc
Rated AC voltage
230Vdc
Maximum AC current
25Aac
Rated frequency
50Hz
Maximum power
5kW
Maximum efficiency
96%
Operating temperature
-10~50℃
Dimension
755*270*355mm
Weight
31kg
GRID interface
Connection to the grid, maximum current of
23.8A
LOAD interface
Connection to the load, maximum current of
19.1A
CT-Grid
Connection to the CT at the side of the
external power grid (the CT is the delivery
accessory)
CT-PV interface
Connection to the CT at the side of the
external PV inverter (the CT is the delivery
accessory)
DRM interface
Grid control interface, DRM0~DRM8
DRM Function Explanation:
DRM0
The Energy Pod is in the state of “Key-
stop”
DRM1
The import power from the grid is 0.
DRM2
The import power from the grid is no
more than 50% of the rated power.
DRM3
The import power from the grid is no
more than 75% of the rated power.
DRM4
The import power from the grid is no
more than 100% of the rated power.
But subject to the constrains from other
active DRMs
DRM5
The export power from the grid is 0.
DRM6
The export power from the grid is no
more than 50% of the rated power.
DRM7
The export power from the grid is no
more than 75% of the rated power.
DRM8
The export power from the grid is no
more than 100% of the rated power, but
subject to the constrains from other
active DRMs.

Secret
8
3.2 BMS
BMS Parameter Table:
Parameter
Value
DC voltage range
60~200Vdc
Maximum current
40Adc
Operating temperature
-10~50℃
Dimension
755*270*210mm
Weight
14kg
LAN interface
Connection to the external ROUTER
RS485-1 interface
Connection to the client controller
RS485-2 interface
Connection to the electric meter
BA Switch
63A/550Vdc
3.3 Battery
Battery Parameters:
Parameter
Value
Battery type
LiFePO4
Battery capacity
2.4kWh
Rated voltage
32Vdc
Voltage range
28~36Vdc
Maximum charging current
40A
Maximum discharging current
40A
Operating temperature
-10~50℃
Dimension
755*270*195mm
Weight
31kg

Secret
9
3.4 BASE
BASE Parameters
Parameter
Value
Rated current
63A
Rated voltage
700V
Dimension
730*240*165mm
Weight
6kg
4 Product Functional Logic
The logical relationship between functions of the product is shown in the following
figure:
When the power grid does not meet the conditions for grid connection, the
function of emergency power supply only supports the matched load.
5 System Functions
5.1 Matching load
In this mode, in order to maximize the photovoltaic utilization rate, and reduce the
cost of the users for buying the electricity from the grid.

Secret
10
Match
load
Working
State
Discharge
Discharge
Charge
Discharge
Discharge
Power
supply
source
BYD
Energy Pod
Grid &
PV
PV
BYD
Energy Pod
& PV
BYD Energy
Pod
PV
/
Load
Load & BYD Energy Pod
Load
/
The priority of power supply to load is as:
① Photovoltaic power supply > ② BYD Energy Pod power supply > ③ Grid power
supply
5.2 Remote control
The product is provided with the RS485 interface and capable of responding to the
control command issued by the external controller. Please refer to the technical
agreement for details of external protocol, charge and discharge control, standby and
shutdown control, etc.
Note: The remote control function shall be used when the power grid is
connected.
5.3 Emergency power supply
In case of the grid-connected operation of the system, when the power grid blackout
occurs, the Energy Pod can supply emergency power for the specific loads
(lighting, mobile phone charging), the grid-connected switch to emergency power
supply is carried out automatically, with a switch time of less than 1S; when the power
grid returns to normal, the system is automatically switching to the state of grid-
connected operation. The emergency power supply load shall be connected to the
Load interface.

Secret
11
Note: The system does not support the startup when the power grid is not
connected.
6 Monitoring
After the Energy Pod is put into use, the user can view the status of the product
through the provided website.
6.1 Open browser and type in the url: https://energycontainerdata.azurewebsites.net
6.2 Choose Language and enter the user‟s account and password in the login
interface, and click Login
6.3 Choose and click product ID you want to view
6.4 Product status information page

Secret
12
V. Installation
1 Installation Instructions
Please read and understand this part carefully before installation of
product.
1.1 Personnel qualification
The installer of the product shall have the local electrician qualification, have received
the safety and technical training, obtain the qualification authorized for the installation
of the product, possess the experience in installation and use of electrical equipment,
and the following capabilities, including but not limited to:
Setting, activation, shutdown, grounding, short circuit and repair of electrical

Secret
13
equipment
Standard maintenance and use of protective devices for electrical equipment
Provision of emergency rescue for the injured
Compliance with local laws, regulations, standards and instructions.
1.2 Notes
The attention shall be paid to the followings:
Check whether the product is damaged prior to installation. The product has
been carefully checked and packed prior to shipment, but may still be damaged
possibly during transportation
Wear the personal protective equipment during installation of product, in order to
avoid the electric shock
In the process of handling the product, the product shall be protected from the
heavy objects, in order to avoid the damage due to impact by the heavy object.
Please ensure that all switches of the system are turned off prior to installation, in
order to avoid the electric shock
Please follow the installation procedures strictly during installation of the product,
in order to avoid the safety accidents caused by incorrect installation
The installation of the product shall be completed as soon as possible, so as to
avoid the irreversible damage caused due to long-term storage of product.
2 Location
An appropriate location should be considered before installing BYD Energy Pod.
2.1 Location restrictions in Australia
Local or National restrictions may prohibit installation in some locations. In Australia,
AS5139 provides guidance as to where a Battery Energy Storage System (BESS)
cannot be installed.
Some of the restricted locations under AS5139 include;
Under Stairs
Within 600mm of any exit
Within 600mm of the vertical side of any window or ventilation
Within 600mm of other equipment not associated with the BESS (e.g a hot water
system or air conditioner) and within 900mm of such equipment above the top of
the BESS
In any Habitable room (including bedrooms, kitchens, studies, lounge/living
rooms, theatre rooms etc.).
It is the responsibility of the Installer to ensure that the installation location complies
with any and all restrictions mandated by local or national regulations.
For the sake of convenience, Figure 4.1 from AS/NZS 5139:2019 is reproduced
below.

Secret
14
2.2 Outdoor Installation Locations
BYD Energy Pod is designed for indoor or outdoor installation. Not all outdoor
locations are suitable, however.
BYD Energy Pod should not be installed:
In areas exposed to direct sunlight between the hours of 10am and 7pm (any
direct sunlight on North or West-facing walls in Australia should be immediately
discounted from consideration)
In areas of potential flood or water causeways
In areas exposed to erosion
On uneven or unstable ground. Installation should be on a concrete slab or
similar even, durable surface
In areas of traffic that may result in physical damage to the BYD Energy Pod unit
or where the installation of BYD Energy Pod unit would restrict entry or egress.
In areas where temperatures will exceed 50°C (noting that performance will be
reduced in temperatures above 40°C) or fall below 0°C
Outdoor installations must also comply with all local and national requirements.
2.3 Flammable materials and fire-proofing
Consideration should be given to the material behind and around the BYD Energy
Pod and the flammability of that material. Australian Standard AS5139 dictates
considerable requirements regarding the use of fire-proof materials behind and
around any Battery Energy Storage System (regardless of the battery chemistry)
which must be adhered to in Australia. Other countries may have similar requirements
and it is the Installer‟s responsibility to be aware of and comply with relevant local and
national regulations.
For the sake of convenience, Figure 4.2 from AS/NZS 5139:2019 is reproduced
below. This diagram shows the dimensions which a non-combustible material must
extend past the edges of a BESS in cases where such material is required as a
barrier to habitable rooms.

Secret
15
2.4 Smoke Alarms
It is a requirement in Australia that this document contains text to advise that a smoke
alarm should be installed within the same room as any BESS which is installed
indoors. The term “should” means that this is a recommendation and not a
requirement under the Standard.
2.5 AS3000 – Mechanical Protection
AS/NZS 3000 requires that adequate mechanical protection be installed to prevent
damage to the BYD Energy Pod in any areas where the equipment may be struck and
damaged (for instance in a garage). Any Bollards used to provide mechanical
protection should located such that they do not interfere with access to the Energy
Pod unit for service, inspection or maintenance.
3 Installation Preparations
3.1 List of tools
During installation of Energy Pod, the following tools may be used
Leveling instrument
Slotted screwdriver
Wire clamp
Flexible rule
Six-angles screwdriver
Torque wrench
Wrench
Hammer
Churn drill
Phillips screwdriver
3.2 Personal Protective equipment
The product is the household energy storage system; the improper operation
may cause the personal injury and property damage.
The personal protective equipment must be worn during installation, use and
maintenance of the product.
It‟s recommended to wear the following personal protective equipment:

Secret
16
Insulated gloves: ensure the life safety of installers
Safety shoes: ensure the safety in case of accidental falling of modules during
installation
3.3 Unpacking and accessories
The product is composed of multiple modules, the PCS and Battery are packed
separately, the BASE and BMS are packaged in one package, and each component
is distinguished according to the external labels of the package. Please carefully
check whether the components and accessories are complete after unpacking.
3.3.1 PCS
■Label:
P.R.
PCS
G.W.
___kg
O.D
800345430mm
■Unpacking:
■Accessories:
Accessories
Graphical
expression
Qty.
Function
M616 assembling bolt
2
Fixation of PCS
CT
2
Measurement of
current magnitude
RJ45 network cable
adapter
2
Connection with CT
and PCS
RJ45 waterproof
connector
3
Connection with
PCS CT interface
and DRM interface
Grid connector
1
Connection of Grid
with PCS

Secret
17
Accessories
Graphical
expression
Qty.
Function
Load connector
1
Connection of Load
with PCS
Exploded view of waterproof connector:
3.3.2 BMS&BASE
■Label:
P.R.
BASE& BMS
G.W.
___kg
O.D
800345390mm
■Unpacking:
■Accessories:
Accessories
Graphical expression
Qty.
Function
Wall hanging accessory
1
1
Fixation of BMS
Wall hanging accessory
2
1
Fixation of BMS
M1280 expansion bolt
6
Fixation of BASE
and wall hanging
accessory 2
M610 cross recessed
outer hexagon screw
3
Fixation of wall
hanging accessory 1
RJ45 waterproof
connector
3
External
communication
connection
Fuse(63A/700Vac)
1
Protection system
BYD Energy Pod
Household Energy
Storage System
User‟s Installation and
Use Manual
/
1
Introduction
In order to ensure the stability of the product, the wall hanging accessories are

Secret
18
designed to be fixed on the wall, and comprised of the wall hanging accessory
1 installed at the rear of BMS and the wall hanging accessory 2 installed on the
wall.
3.3.3 Battery
■Label:
P.R.
BATTERY
G.W.
___kg
O.D
800345250mm
■Unpacking:
■Accessories:
Accessories
Graphical expression
Qty.
Function
M616 assembling bolt
2
Fixation of Battery
3.4 Installation environment
For details of requirements for installation environment, see the Article 2 in Part II
Safety in this Manual.
4 Formal Installation
4.1 Hole drilling
As for determination of installation position of the product, the installation position
must be horizontal; the holes shall be drilled on the wall and ground as shown in the
figure below, wherein, the specified size a shall be selected according to the local
requirements. The drill bit 16mm shall be used with a drilling depth of 80mm