
Energi Savr NodeTM 0-10V / SoftSwitch®Installation GuideLutron®|8
Energi Savr NodeTM 0-10 V / SoftSwitch®|Installation Guide
Step 6: QS link wiring
WARNING! Danger of Shock. May result in serious
injury or death.DONOTWIREWHENLIVE!Switchoff
power to all power feeds via circuit breaker before wiring
or servicing the Energi Savr Node unit.
Buttons and LEDs in the unit are used for programming and
troubleshooting. If line voltage shield is removed, the unit
must be accessed by a certied electrician, following local
codes.
QS link communication uses NEC®Class 2/PELV wiring. Follow
all local and national electrical codes when installing NEC Class
2/PELV wiring with line voltage wiring.
The total distance of the QS link wiring must not exceed 2000 ft
(610 m).
QS Link Wiring
Distance Wire Gauge
Available from
Lutron in one cable:
Less than
500 ft (125 m)
Power (terminals 1 and 2):
1 pair 18 AWG (1.0 mm2)
GRX-CBL-346S
Data (terminals 3 and 4):
1 pair 22 AWG (0.5 mm2),
twisted and shielded*
500 ft (125 m) to
2000 ft (610 m)
Power (terminals 1 and 2):
1 pair 12 AWG (4.0 mm2)
GRX-CBL-46L
Data (terminals 3 and 4):
1 pair 22 AWG (0.5 mm2),
twisted and shielded*
* Alternate Data-only cable: Use approved data link cable
(22 AWG (0.5 mm2) twisted/shielded) from Belden, model
#9461.
Check for compatibility in your area.
A QS system can have up to 100 zones and 100 devices. The
Energi Savr Node unit counts as 1 device and up to 4 zones.
See diagram on the right for QS link wiring.
1.Connect terminals 1, 3 and 4 to all Energi Savr Node units.
2.Each Energi Savr Node unit has its own built-in power supply.
3.The terminal 2 connection (24 V ) supplies power to QS de-
vices sharing that connection.
– Ensure that QS devices powered from terminal 2 of the Energi
Savr Node unit do not consume a combined total of more
than 14 Power Draw Units (PDUs).
– Refer to the documentation for each QS device to determine
that device’s PDU consumption.
NOTE: To connect extra QS devices, use a separate power
supply (24 V ), and only connect COM, MUX, and MUX to the
devices connected to the Energi Savr Node unit.
4.Wiring may be daisy chained or t-tapped.
Power draw calculations are not needed for wireless sensors or
sensors connected directly to the Energi Savr Node units.
(4) MUX
(3) MUX
(2) 24 V
(1) COM
QS Link Wiring:
•22AWGto12AWG
(0.5 mm2to 4.0 mm2)
•Striplength:3/8in(8.5mm)
•Torque:5in-lbs(0.5N•m)
12 AWG (4.0 mm2)
18 AWG
(1.0 mm2)
QS Link Wiring
NEC Class 2/PELV Terminal Connections
Each low-voltage NEC Class 2/PELV terminal can accept only
two 18 AWG (1.0 mm2) wires. Two 12 AWG (4.0 mm2) conduc-
tors will not t. Connect as shown below using appropriate wire
connectors.
Line Voltage Shield