Quick Start Guide /COR IBR1100 Dual-Modem Dock
7. Fully seat USB connectors and align router/dock holes.
8. For new installations: Secure router to dock using four M5x8 screws (G), then secure dock to
mounting surface using four mounting screws (H) (not supplied). Skip to step 10. For high-vibration
environments, Cradlepoint recommends using thread locker.
9. For existing installations: Secure router to dock and mounting surface using four M5x40 screws (also
included). For high-vibration environments, Cradlepoint recommends using thread locker or nylon lock nut.
10. Attach included or accessory antennas.
NOTE: Do not place IBR1100/IBR1150 antennas and MC400 antennas immediately adjacent. Cradlepoint
recommends remotely attaching one or both sets of antennas.
©2005-2016 Cradlepoint. All Rights Reserved. |+1.855.813.3385 |cradlepoint.com 3
Part Number: 170650-001
Deploy and Manage the
Intelligent Network with
Cradlepoint Enterprise Cloud
Manager (ECM)
Cradlepoint’s network management
and application platform, Enterprise
Cloud Manager, integrates cloud
management with your Cradlepoint
devices to improve productivity,
increase reliability, reduce costs, and
enhance the intelligence of your
network and business operations.
To learn more and begin a free
30-day trial:
services@cradlepoint.com
cradlepoint.com/ecm
G
G
G
G
H
H
H
Figure 3