BOILING WATER UNIT INSTALLER INSTRUCTIONS CELSIUS 100 CRN CI & EI Series
POSITIONING THE UNIT
The unit should be mounted on a strong wall above a sink or draining board at a tap height most comfortable for people to use
Or approximately 40 cm above standard sink height, t tap supplied with teon tape and ghten in upright posion.
CONCEALED PLUMBING INSTALLATION
There is provision for water and electrical concealed installaon.
EXTERNAL PLUMBING
We recommend the plumber to use a tundish for the overow pipe and isolang valve for the water inlet.
FILTRATION
We strongly recommend the ng of a triple acon inline lter to all boiling water units which are being installed in hard
water areas, especially W.A., S.A., N.T., and parts of Q.L.D. and N.S.W. as some of these areas have a high concentrate
of minerals and iron oxide in the water which are very harmful to the holding tanks etc.
Failure to t adequate lters will void the warranty of the product.
ELECTRICAL CONNECTION
IMPORTANT: PLEASE CHECK THAT THE POWER POINT IS WIRED CORRECTLY WITH THE ACTIVE ON THE TOP LEFT HAND TERMINAL,
THE NEUTRAL ON THE TOP RIGHT HAND & EARTH ON THE BOTTOM TERMINAL. THE UNIT WILL NOT OPERATE CORRECTLY IF IT IS
INCORRECTLY WIRED.
This unit is supplied with a ex and plug, for xed wiring please use a registered electrician.
INITIAL OPERATING INSTRUCTIONS
Once the unit has been installed correctly, the following procedure, should take place.
1. Turn water on.
2. Turn power on.
3. Wait unl water reaches the minimum water level probe, usually a dribble will come out of the tap in the open posion.
4. Close the tap and while the unit is lling observe to see that there are no leaks of water; if so invesgate the reason why
and repair.
5. Once the maximum water level is reached the unit will stop lling, the element will heat the water unl it reaches 96°C,
and then the electronic controller will monitor the water at 96°C indenitely.
6. Test the operaon of the unit by leng some of the water out of the tap, which almost immediately turns the water valve
on leng water into the tank and raising the water level to the top probe.
7. Once the unit is working correctly, t the cover with the four xing screws and leave the instrucons with the owner.
ALTERNATIVE SHORTCUT FOR THE INSTALLER!
To reduce the set up me of the installaon a short cut be used to trick the microprocessor into thinking that the unit is full of
water even when it is virtually empty.
Firstly, turn on the water and power, wait unl the water dribbles out of the open tap, then close the tap and with a screwdriver
short the top probe out to the edge of the tank, the top probe being the probe with the black wire xed to it, immediately the water
valve will stop lling and the element will come on and heat the water, then the heat and ll cycle will start and nish when the
top probe is reached.
CROWN INDUSTRIES