manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. cyclehoop
  6. •
  7. Rack & Stand
  8. •
  9. cyclehoop Bikehanger User manual

cyclehoop Bikehanger User manual

Popular Rack & Stand manuals by other brands

Dynex DX-MP3MT Quick setup guide

Dynex

Dynex DX-MP3MT Quick setup guide

Konig & Meyer 24185 manual

Konig & Meyer

Konig & Meyer 24185 manual

ECG LD 326501 instruction manual

ECG

ECG LD 326501 instruction manual

Philips SB7S19S/00 quick start guide

Philips

Philips SB7S19S/00 quick start guide

Woodline KIT-250 lb instructions

Woodline

Woodline KIT-250 lb instructions

ricoo S1222 installation instructions

ricoo

ricoo S1222 installation instructions

Kanto P301 user manual

Kanto

Kanto P301 user manual

VidaBox VB MNT FFS2 installation guide

VidaBox

VidaBox VB MNT FFS2 installation guide

PROEL PLWIN60C user manual

PROEL

PROEL PLWIN60C user manual

AllMounts PLB-43S instruction manual

AllMounts

AllMounts PLB-43S instruction manual

VMP VH-001 instruction sheet

VMP

VMP VH-001 instruction sheet

Nederman SYSTEM 920/400 instruction manual

Nederman

Nederman SYSTEM 920/400 instruction manual

Glasdon ORBIS POST MOUNTING KIT installation guide

Glasdon

Glasdon ORBIS POST MOUNTING KIT installation guide

Songmics LGR105 manual

Songmics

Songmics LGR105 manual

Grape GM401 user manual

Grape

Grape GM401 user manual

FourStarGroup 11225296 manual

FourStarGroup

FourStarGroup 11225296 manual

CHIEF FLR100 installation instructions

CHIEF

CHIEF FLR100 installation instructions

FEC XDCAM EX PMW-EX30 manual

FEC

FEC XDCAM EX PMW-EX30 manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

Bikehanger Assembly Instructions
Step
Action
Parts
Qty
1
Insert Feet A and Feet B into Frame A.
Side frame A
1
Insert bolts and loosely tighten.
Side frame B
1
Mushroom head coach bolt faces internally on opening side of shelter.
Feet A
2
Mushroom head coach bolt faces externally on rear side of shelter.
Feet B
2
Repeat with Frame B.
M10 x 65mm mushroom
head coach bolt
4
M10 shear nut
4
2
Bolt Top Beam to Frame A and Frame B
Top Beam
1
Hand Tighten
M10 x 30mm mushroom
head coach bolt
4
M10 serrated flange nut
4
3
Bolt Bottom Beam to Frame A and Frame B
Bottom Beam
1
Bolt above plate
M10 x 20mm hex bolt
2
Hand Tighten
M10 serrated flange nut
2
4
Bolt Middle Beam to Frame A and Frame B
Middle Beam
1
Bolt below plate
M10 x 20mm hex bolt
2
Hand Tighten
M10 serrated flange nut
2
5
Loosely bolt Roof Panel 4 to side frame to hold it in place.
Roof Panel 3
1
Hook Roof Panel 3 over Top Beam lip.
Roof Panel 4
1
Overlay Roof Panel 3 over Roof Panel 4 and bolt through frame.
M8 x 20mm mushroom
head coach bolt
24
Fix remaining bolts to panels and frame.
M8 serrated flange nut
24
M8 rubber washer
24
6
Position Bike Rack Beam A and Bike Rack Beam B inside hanger.
Bike Rack Beam A
1
Bike Rack Beam B
1
7
Bolt Low Wheel Holders to Bike Rack Beam A and Bike Rack Beam B
Low Wheel Holder
3
Hand Tighten
M10 x 20mm mushroom
head coach bolt
9
M10 serrated flange nut
9
8
Bolt High Wheel Holders to Bike Rack Beam A and Bike Rack Beam B
High Wheel Holder
3
Hand Tighten
M10 x 20mm mushroom
head coach bolt
6
M10 serrated flange nut
6
9
Bolt Locking Bars to Bike Rack Beam A and Bike Rack Beam B
Locking Bar
3
Tighten Shear Nuts until ends snap off
M10 x 20mm mushroom
head coach bolt
12
Lift up rack to tighten
M10 shear nut
12
10
Bolt Joining Plate to Bike Rack Beam B
Joining Plate
1
Hand Tighten
M10 x 20mm hex bolt
2
M10 serrated flange nut
2
11
Bolt Bike Rack Beam A and Bike Rack Beam B to Frame A and Frame B
M10 x 20mm hex bolt
8
Hand Tighten
M10 serrated flange nut
8
12
Bolt Joining Plate to Bottom Beam
M10 x 20mm hex bolt
2
Hand Tighten
M10 serrated flange nut
2
Tighten all bolts with impact wrench
13
Bolt Gas Springs to Frame A and Frame B
Gas Spring
2
Note: Connect piston rod end (not cylinder end)
M10 Nylock nut
2
14
Bolt Door Hinges to Door Frame
Door Frame
1
Nut on inside
Door Hinge
2
M12 nylock nut
4
M12 x 30mm hex bolt
4
15
Bolt Door Hinges to Top Beam
M12 x 60mm A2 st/st hex
head bolt (45mm NOT
thread)
2
Apply grease to bolt
M12 nylock nut
2
16
Bolt Gas Springs to Door Hinges through middle hole
M10 Nylock nut
2
17
Loosely bolt Roof Panel 1 to Door Frame to hold it in place
Roof Panel 1
1
Overlay Roof Panel 2 over Roof Panel 1
Roof Panel 2
1
Bolt Lock front cover to Locking box through frame
M8 x 20mm mushroom
head coach bolt
32
Fix remaining bolts to panels and frame
M8 serrated flange nut
32
M8 rubber washer
32
18
Assemble Lock with Lock L plates
Camlock
1
Attach Locking Mechanism and Lock Front Cover through Door Frame
Lock L Plates
2
Apply Grease to Locking Mechanism
19
Attach Locking Bars to L-Brackets and through Door Frame
Locking Bar
2
Note: Rotate locking bar to correct position. Adjust length so end clears
side frame by 5mm when open
M12 nut
4
20
Attach Lock Handle to Lock
Use loctite
21
Bolt External Handle to Door Frame
External Handle
1
M10 serrated flange nut
2
22
Fix Nutserts to Door Frame
M6 x 15mm Nutsert
10
23
Attach Lock Cover Plate to Door Frame
Lock Cover Plate
1
M6 x 12mm button head
socket screw
10