Installation of Denfit StreetWorkout on
concrete
On concrete (installation on tarmac is not possible)
Remarks:
1 - Make sure that the concrete floor is strong enough to install the StreetWorkout unit. It has to be
reinforced concrete.
The Street Workout units are provided with a round foot plate Ø 185 or Ø 100 mm, and they have
got 4 anchoring holes. Always use the drawing of the products to determine the centre to centre
distances.
1 —Put the unit on a flat concrete floor and mark the holes.
2 —Drill the marked holes. See note.
3 —Clean the holes with air
4 —Apply the chemical anchoring in the holes. See note.
5 —Put the rods with internal thread M16 in the holes. See note.
6 —Put the footplate with the holes above the rods and fasten the bolts halfway
7 –After the bars are installed (see next page) and the posts are level, fasten the bolts into the concrete
Note: the drill diameter and the threaded rods can vary by manufacturer.