
3
To ensure the correct bar height, dry sand or loose filling (fall protection like bark mulch, woodchip,
gravel or Playtop) must be applied up to the surface level (= footplate of the post).
The height between the Minimum dry sand level and the footplate is 300 mm (maximum possible fall
protection).
Attach the post with the footplate on the installation frame.
The posts, bars and tubes on the posts are labelled:
The numbers on the bars and tubes match with each other. Make sure you connect the same
numbers.
When the bar is installed between the posts screw in the security bolt halfway by hand. Then do the
adjustments and make sure that the posts are completely level and straight.