4
INSTALLATION INSTRUCTIONS
UNPACKING:
CAUTION:
Carefully unpack and remove the furnace from its shipping carton. Save the carton and other packing
material for future use in transporting the furnace.
Shipping damage should be reported to the carrier as soon as detected.
The furnace shipping carton contains the following:
•One furnace complete with power cord
•Owner's & Operator's Manual plus Calibration Pellets
•Ceramic Floor tray (shipped in the muffle)
•Two exhaust port plugs (for heat treating applications only)
LIFTING AND CARRYING:
NOTE: The 1750 models require two people.
1 Get a firm footing. Keep your feet shoulder width apart for a stable base.
2. Bend your knees. Don't bend at the waist.
3. Grip the base of the furnace and lift with your legs.
4. Keep the load close to your body and carry the unit to the destination. Keep your back upright during lifting.
INSTALLATION:
1. Remove all packing material from in and around the furnace. The furnace should be located at least 15cm (6")
away from walls, shelves and heat sensitive materials. Open the furnace door and remove the packing material
from inside the furnace. NOTE: The furnace front panel will show some discoloration around the muffle due
to the calibration and burnin cycles performed at the factory.
2. The furnace should not be located directly under shelves and other airflow restrictions.
3. On high voltage (200-250 volt) units, connect the line cord packaged in the rear of the furnace to the socket in
rear of furnace.
4a (Combustion, Burnout or Reaction Processes) Position the furnace under a vent hood or connect the exhaust
port to a ventilation system to prevent exposure to the exhaust fumes. The furnace exhaust port 25 mm (1")
OD by 25 mm (1") long [50 mm (2") OD by 20 mm (0.8") long on 1750 Model] can be ducted into the exhaust
hood for more effective ventilation. Stainless Steel flexible metal tubing can be used for this ducting.
4b (Heat Treating or Non-Reaction Processes) Position the furnace under a vent hood. Plug the exhaust port with
the ball plugs provided in the furnace accessory kit. This will reduce heat loss and electricity requirements.
5 . Connect the furnace to a power circuit or receptacle with an overcurrent protection (circuit breaker or fuse) rating
of 20 Amps on the low voltage model and 10 Amps on the high voltage model. The furnace should be the only
load on this circuit. The 1750 North American model requires a 20A supply (breaker/recepticle). The 1750 Euro
model requires a dedicated 32A supply (breaker/recepticle).
6. Turn on the furnace lighted green power switch (right-hand side of the control panel).
7. When the door is fully closed, the power switch light should be illuminated. As the door opens the power switch
light should turn off. Do not attempt to operate the furnace if this light does not turn off when the door is open.
8. At this time, your new furnace should be set-up to operate. Please review the Operations section of the manual
before proceeding to operate the furnace.