
Units shall be placed where there is available access to an electrical outlet.
Refer to the Dynavision D assembly instructions for assembly and operation details
2. Assemble the D according to the instructions
provided. Place the D close to the rack, laying
down as shown.
1. Unpack the D stand from skid, wheel to desired
mounting location. Desired area shall have a level
floor and close to an AC source. Set leveling casters
to level and stabilize rack (wheels off the floor).
3. Open both rear panels with the keys supplied.
Connect the rack to an AC source. Raise the
rack to its maximum height.
4. Lift the D upright and place the D onto the
stand as shown. Holding on to the D , connect
the the D to an AC source. Raise the unit to
expose the first mounting panel – next page.
To accomplish this step safely, you must employ people to do the job.
An AC source is required in order to perform these instructions (units plugged in).
Refer to the Dynavision D assembly instructions for assembly and operation details