Electrical Connection
1. Spa bath pumps must be fitted in accord with AS3000 electrical wiring rules
2. AS3000 requires all 240 V pumps installed in Spa Bath to be supplied from a
circuit protected by a residual current device (RCD) with a maximum rated
residual current 30 mA.
3. The TriFlo spa bath pump is fitted with a standard lead and three pin plug for
240-220V 50Hz power supply.
4. The spa bath pump power connection must be accessible so that it can be
independently switched off in case of an emergency but must not be
accessible by the bath user.
5. If damage occurs to the power cord it must be replaced by Edgetec or an
authorised service agent or suitably qualified person.
Air Tube Connection AH & XH Models (refer page 7)
1. Supplied with your spa pump is a 4 metre roll of 3mm clear air tube, fit one
end of the air tube to the air button (supplied with the spa bath) on the spa
bath.
2. Uncoil the air tube so that you can connect it to the air switch located on the
pump (refer page 7) at the rear of the pump motor on the capacitor cover.
3. Cut off excess tube and ensure that the tube is not kinked, do not wrap or
loop excess tube around frame work of the bath or pipe work as this may
cause the air button not to operate correctly.
Touch Pad Cable Connection ST & ET Models (refer page 7)
1. Supplied on your spa bath is the Sensa Touch Pad, connected to the touch
pad will be a 4 metre RJ45 cable.
2. Uncoil the RJ45 cable and you will see that one end is already connected to
the touch pad on the spa bath.
3. Connect the other end to the pump as per page 6, ensuring that the RJ45
cable connection clip is fully inserted. Push the RJ45 connector until you hear
it “click” into the lock position. Do not wrap or loop excess cable around
frame work of the bath or pipe work!
4. Push the protective rubber cap that is on the cable over the circular housing
(refer page 6) to protect the touch pad cable connection. Failure to do this
will void your warranty.
5. When power is activated there will be a “Green”indicator light activated on
the touch pad to show that the connection is fitted correctly from the pump
to the touch pad.
Start Up –TEST ALL PIPEWORK AND PUMP OPERATION –PRIOR to TILING!
1. Fill the spa bath to approximately 50mm above the spa jets, check the pump
and pipe connection for any leaks.
2. Ensure that the pump power outlet is switched to the “on” position.
3. Auto-Heat & Xtra-Heat pumps. (AH & XH Model) Press the air button on the
spa bath, the pump will start and purge the air from the system and your spa
will start to operate. To stop the spa, simply press the air button again.
4. Sensa/Eezi-Touch pump. (ST & ET Model) Press the pump symbol on the touch
pad, the pump will start and purge the air from the system and your spa will
start to operate. To stop the spa, simply press the pump symbol on the touch
pad again.
5. Spa-Key. (SK Model) Press the pump symbol on the hand set, the pump will
start and purge the air from the system and your spa will start to operate. To
stop the spa, simply press the pump symbol on the hand set again.
6. If the pump fails to prime you may have an air lock, please refer to activating
air bleed. If after activating the air bleed - the pump will still not prime –
check the height of the pump and adjust to the correct level.