ELCOS SRL - Parma - EN - CEM-370 /1 7
YOUR ELECTRICAL TECHNICIAN CAN ASK US ANYTHING ABOUT THIS CONTROL
UNIT BY TELEPHONING ONE OF OUR TECHNICIANS
Only for starting and surveillance of the diesel motor pump and stops it if there are anomalies in the parts
controlled by probes.
It has been designed to be installed also on the machine.
Warning:
adhere closely to the following advice
- Always follow the Wiring Diagram on page 5 when making connections.
- All technical interventions must be performed with the engine stationary and terminal 50 of the starter
motor disconnected.
- Check that the line loading and the consumption of the connected equipment are compatible
with the described technical characteristics described on page 2.
- Install in such a way that there is always adequate heat disposal.
- Always install under other equipment which produces or spreads heat.
- Never disconnect the battery terminals with the engine running.
- Never use a battery charger for the emergency start-up; the control unit could be damaged.
- In order to safeguard people and equipment, before connecting an external battery charger, disconnect
the electrical system terminals from the battery poles.
THIS CONTROL UNIT IS NOT SUITABLE FOR OPERATING IN THE FOLLOWING CONDITIONS:
- Where the environmental temperature is outside the limits indicated in the Technical Data.
- Where the air pressure and temperature variations are so rapid as to produce
exceptional condensation.
- Where there are high levels of pollution caused by dust, smoke, vapour, salts and
corrosive or radioactive particles.
- Where there are high levels or heat from radiation caused by the sun, ovens or the like.
- Where attacks from mould or small animals are possible.
- Where there is the risk of re or explosions.
- Where the control unit can receive strong vibrations or knocks.
ELECTROMAGNETIC COMPATIBILITY
This control unit functions correctly only if inserted in plants which conform with the CE marking standards;
it meets the exemption requirements of the standard EN61326-1 but it cannot be excluded that
malfunctions could occur in extreme cases due to particular situations.
The installer has the task of checking that the disturbance levels are within the requirements of
the standards.
CONDUCTION AND MAINTENANCE
The following maintenance operations should be performed every week:
- check that the indicators function;
- check the batteries;
- check that the conductors are tight, check the condition of the terminals.
UNLESS WE MAKE A WRITTEN DECLARATION STATING THE CONTRARY, THIS CONTROL UNIT IS
NOT SUITABLE FOR USE AS A CRITICAL COMPONENT IN EQUIPMENT OR PLANTS RESPONSIBLE
FOR KEEPING PERSONS OR OTHER LIVING BEINGS ALIVE.
NOTICES