ESDEC CLICKFIT BASIC User manual

EN
MOUNTING SYSTEM FOR CORRUGATED ROOF
MANUAL
© ESDEC BV 2015
Rev. 10.06.15
mounting system for corrugated roof
for solar panels in portait setup
(cross-system)

Rev. 10.06.15 MANUAL MOUNTING SYSTEM FOR CORRUGATED ROOF
TABLE OF CONTENT
pag
1. Introduction 1
2. General installation conditions 1
3. Product description 3
4. Parts overview 3
4.1 Exploded-view 3
4.2 Bill of materials 4
5. Mounting preparation 5
5.1 Monitoring tools and accessories 5
5.2 Determining position of solar panels and measuring 6
5.3 Cleaning roof 6
6. Installation 7
6.1 Preinstalling suspension sockets onto solar panels 7
6.2 Preinstall connecting strips 7
6.3 Attaching hanger bolts 8
6.4 Attaching vertical mounting rail 9
6.5 Attaching horizontal mounting rail 10
6.6 Hanging solar panels to mounting rail 11
6.7 Mounting 1st solar panel on mounting rail 12
6.8 Mounting other solar panels on mounting rail 13
6.9 Final assembly / multiple rows under each other 14
7. Annex 15
THIS INSTALLATION MANUAL SHOULD BE RETAINED WELL FOR FUTURE REFERENCE!
For the duration and conditions regarding warranty we recommend contacting your dealer. Furthermore, we refer to our General
Terms and Conditions of the sale which are available on request.
The manufacturer declines all responsibility for damage or injury resulting from failure to strictly follow this installation manual and
failure to observe normal caution in handling, installation and use of the ClickFit mounting system.
As a result of constant efforts to improve it may happen that the product differs in detail from what is described in this manual. For
this reason the given instructions serve only as a guideline for installing the product mentioned in this manual.
This manual has been prepared with all due care, but the manufacturer can not be held responsible for any errors in this manual or
the consequences thereof.
In addition, all rights are reserved and nothin may be reproduced from this manual in any way.

01
Rev. 10.06.15 MANUAL MOUNTING SYSTEM FOR CORRUGATED ROOF
1. Introduction
This manual describes the installation of the ClickFit mounting system comprising of a double layer cross-cross
arrangement for a corrugated roof. (for solar panels in portrait setup)
Read the manual carefully so you are fully informed of the contents of the manual. Follow the instructions in the manual
carefully. Perform the operations in the correct order.
Keep the manual in a safe and dry place. Should the manual get lost then there is the possibility to request a new one from
Esdec BV.
2. General installation conditions
In general
Non-compliance with the requirements mentioned in this document may result in invalidation of all warranty and product liability claims.
The data, comments and opinions in this document are binding and must be checked for completeness and timeliness.
Esdec BV reserves the right to modify this document without notice.
Stability and condition of the roof
The roof should be in good condition and strong enough to bear the weight of the solar panels incl. the additional materials, wind and
snow loads. Check the stability of the roof and adjust the roof / construction where necessary, in in doubt contact a manufacturer. Ensure
that the load reserve of the roof is exceeded not locally or in its entirety.
Safety Warnings
• Before starting the installation, you should be informed of which material the corrugated iron is manufactured. If the concerned
corrugated iron is contains asbestos, we refer to the law and regulations concerning working with asbestos containing materials.
• The installation of the ClickFit mounting system should standard be performed by qualied technical personnel (at least 2 skilled
people).
• Adding or removing parts may have an adverse effect on the functioning and is not advised!
• For placement of the solar panels the roof should be clean, dry, at and free from algae etc.
• Avoid mounting with strong winds and a slippery wet roof surface.
• Work on a pitched roof alwaays with fall protection, and if necessary with safety nets and edge protection.
• Wear shoes with reinforced toe and sturdy non-slip soles.
• Always wear proper protective clothing when performing the work.
• Always use a lifting aid / lift installation when moving the equipment (solar panels, etc.)
• Always place a ladder on a rm stable surface.
• Always place the ladder at an angle of about 75º and leave it sticking out about 1m above the roof edge.
• If possible, secure the ladder to the top with a rope or strap.
• Preferably work according to manual “work safely on roofs”.
Scope ClickFit
• Wind zone (1 t/m 3)
• Roof height (3-9m) When your roof is higher you should contact your supplier.
• Type of roong: Corrugated iron
• Roof pitch: Between 15 - 60 degrees (35 degrees is best)
Edge zone
The distance from the solar panels to the ridge and gutter should be at least 30 cm due the wind load.
The distance from solar panels to the side of the roof should be at least 30 cm. There shouldn’t be solar panels in this area, in its entirety
nor in part.
Dimensioning
All dimensions and sizes are in cm unless stated otherwise.

Standards, requirement and regulations
Upon installation of the mounting system, it is important to follow the installation instructions and the related standards for
the prevention of accidents. In particular, observe the following standards, requirements and regulations:
• Building Decree Construction
• PPE Personal Protective Equipment
• KEMA Testing of Electrotechnical Materials
• DIN 1055 Design loads for buildings
• DIN 18299 General rules for all construction sectors
• DIN 18451 Scaffolds
Removal and disassembly
Remove the product according to local laws and regulations.
Warranty
Warranty according to warranty conditions and terms of Esdec BV. These can be found on the website www.esdec.nl
Liability
The manufacturer accepts no liability for damage or injury caused by not (strictly) observing the safety regulations and
instructions in this manual or by carelessness during installation of the product described in this document and any related
accessories.
• subject to misprints
02
Rev. 10.06.15 MANUAL MOUNTING SYSTEM FOR CORRUGATED ROOF

3. Product Description
4. Parts overview
4.1 Exploded-view
03
Rev. 10.06.15 MANUAL MOUNTING SYSTEM FOR CORRUGATED ROOF
The ClickFit mounting system consists of mounting brackets, mounting rails (double-layer cross-cross arranged) and the
necessary installation materials to mount the solar panels in portrait setup on the roof. The ClickFit mounting system for
corrugated iron can be used for all types of corrugated roong, including the common ber cement steel and corrugated
iron.
Mounting system
The vertical mounting rails are secured to the roof structure by means of hanger bolts. The horizontal mounting rails are
mounted cross-cross arranged onto the vertical mounting rails.
Height differences in the roof can easily be taken care of by means of the adjustment of the hanger bolts. At the location of
the hanger bolt EPDM rubber seal is used as a water barrier.
Attachment of the mounting rails
The vertical mounting rails are attached to the hanger bolts using a M8 screw connection. The horizontal mounting rail is
mounted onto the vertical mounting rails using cross connectors and mounting screws.
Attachment of the panels
The solar panels are attached by means of universal module clamping plates, end clamps
and mounting screws. The mounting screws are screwed directly to the mounting rail in which is a special thread is
installed.
1
7
8
96
8
76A
14
13
12
16
15
432
5
10 11

4.2 Bill of materials
04
Rev. 10.06.15 MANUAL MOUNTING SYSTEM FOR CORRUGATED ROOF
1. Solar panel
7. RVS Hex bolt M8 x 20
Article nr: 100-0820
8. RVS Hex ange bolt M8
Article nr: 100-0721
5. Mounting rail
Article nr: 100-1001
6. Connection strip pro
Article nr: 100-3040
12. End clamp
End clamp CFA
Article nr: 100-3003
End clamp CFB
Article nr: 100-3004
For type see annex ch. 7
13. Mounting screw 6,5 x __
Article nr: 100-65__
For type see annex ch. 7
14. Module clamping plate
Article nr: 100-3020
9. Hanger bolt M10x200
Article nr: 100-3101
Hanger bolt M10x250 (optional)
Article nr: 100-3110
Hanger bolt M10x300 (optional)
Article nr: 100-3103
Hanger bolt for steel M10x160 (optional)
Article nr: 100-3107
15. End cap Black (optional)
Article nr: 100-3030
16. Color cap Black (optional)
Article nr: 100-6500
12A. End clamp Black (optional)
End clamp CFA Black
Article nr: 100-3950
End clamp CFB Black
Article nr: 100-3951
For type see annex ch. 7
14A. Module clamping plate
Black (optional)
Article nr: 100-3952
6A. Mounting screw 6,5 x 19
Article nr: 100-6519
11. Mounting screw 6,5 x 32
Article nr: 100-6532
10. Cross connector
Article nr: 100-2080
2. RVS Hex bolt M6 x 20
Article nr: 100-0620
3. Nylon suspension socket
Article nr: 100-9001
4. RVS Hexagon nut M6
Article nr: 100-0600

1
2
3
4
5
6
5. Mounting preparation
5.1 Monitoring tools and accessories
or
S7 / S10 / S13 S7 / S10
Scaffold or stable safe
ladder
Here is a list of necessary tools / utilities:
Measuring tape Brush Ratchet with hex cap Cordless Screwdriver
Marker / chalk
05
Rev. 10.06.15 MANUAL MOUNTING SYSTEM FOR CORRUGATED ROOF
Wrench (2x)
S15

5.2 Determining position of solar panels and measuring
In the determination of the position of the solar panels on the sloping roof, it is very important to pay attention to the sunlight
coming in throughout the day and throughout the year. Place the solar panels on a roof surface which has no shadow.
Shadow of a chimney, dormer, trees and nearby buildings have an adverse effect on the amount of energy generated by the
solar panels.
Measuring and marking
For the placing of the solar panel (in portrait setup), you need approximately an area of 160x80 cm or 160x100 cm or
200x100 cm per panel. (depending on the type of solar panel)
Make sure that on the roof around the solar panels 30 cm is kept free. or 30 cm from the ridge and the gutter and 30 cm
from the sides in connection with wind load.
Mark the contours of the panel eld on corrugated iron with chalk or a marker. Mark the lines mark where the vertical
mounting rails are coming and where the hanger bolts must be placed. Mark the lines where the horizontal mounting rails
are coming (on 1 / 4th of the top panel and bottom panel).
06
Rev. 10.06.15 MANUAL MOUNTING SYSTEM FOR CORRUGATED ROOF
5.3 Cleaning roof
Clean the corrugated iron with a brush.
Remove algae, moss, etc. to reduce imperfections to a minimum during installation!
min. 30 cm
min. 30 cm
min. 30 cm
min. 30 cm

6. Installation
6.1 Preinstalling suspension sockets onto solar panels
Install per solar panel 2 suspension sockets at the rear of the solar panel (= same side as the connection box).
First insert the RVS hex bolts M6x20 in the available holes in the frame and afx thereon the suspension sockets.
Then install the M6 nuts. The suspension sockets serve as mounting aid in placing the solar panels
07
Rev. 10.06.15 MANUAL MOUNTING SYSTEM FOR CORRUGATED ROOF
6.2 Preinstall connecting strips
You can attach the mounting rails to each other with the supplied connection strips.
Slide the upper connection strip into the side of the mounting rail and slide 2 hex bolts M8 x 20 with the head into the
mounting rails. Install the upper connection strip with 2 mounting screws 6,5x19 (tightening torque 4,5Nm).
Place the bottom connection strip onto the underside of the mounting rail over the hex bolts M8 x 20 and place the hex
ange bolt M8 (tightening torque 16,3Nm).

6.3 Attaching hanger bolts
On the basis of the position of the solar panels on the roof, you determine the position of the hanger bolts.
Divide the hanger bolts equally in the line where the vertical mounting rails comes. The hanger bolts may be placed up
to 1.5 m apart. (See calculator for distance) Ensure that the hanger bolts are always attached in the curvature of the
corrugated iron and in a girder.
Draw with chalk or marker the place down on the corrugated iron roof where the hanger bolts should come. (on the spot
of purlin) Install the hanger bolt on the curvature of the corrugated iron. Preferably use the screw hole with which the
corrugated iron is screwed to the purlin. Remove this screw and place the hanger bolt into the screw hole. If the existing
screw hole cannot be used because it is in the wrong place then a new hole must be drilled at the desired location in the
corrugated iron on the curvature. Use a drill bit of 12.5mm, then pre-drill the prulin with a long drill 5mm *.
Then screw the hanger bolt into the purlin (possibly with electric percussion rattle). Make sure the hanger bolt is drilled deep
enough (at least 5cm) and straight into the girder. Now tighten the nut above the rubber seal until the rubber deforms and
the screw hole is properly sealed. Make sure that the hanger bolts are mutually aligned.
* When applying the hanger bolt M12 the hole must be 14.5 mm into the corrugated iron and the purlin must be pre-drilled
with a drill bit of 7 mm long.
** When applying the hanger bolt for steel purlins, the purlin must be pre-drilled using the table in the annex on page 13.
08
Rev. 10.06.15 MANUAL MOUNTING SYSTEM FOR CORRUGATED ROOF
1
2
3
4
5
6
(2x)
max. 1,5 m
1
2
max. 1,5 m
See calculator

6.4 Attaching vertical mounting rails
1. Disassemble the hex bolts M8x20 of the hanger bolts and slide them with the head into the mounting rails.
2. Make sure that the end of the mounting rails protrudes min. 5 cm compared to the last hanger bolt and place the
mounting rail with hexagon bolts M8x20 onto the hanger bolts.
3. Then screw the mounting rail to the hanger bolts using hex ange bolts M8. Make sure these are tight properly.
(tightening torque 16,3Nm)
4. Make sure that the mounting rail and the hanger bolts are well aligned in comparison with each other and that the
mounting rail is properly positioned on the hanger bolts. Height differences in the roof can easily be taken care of by means
of the adjustment of the nounting plate in the hanger bolt.
Make sure the vertical mounting rails are next to each other in connection with the alignment of
the solar panels!
09
Rev. 10.06.15 MANUAL MOUNTING SYSTEM FOR CORRUGATED ROOF

6.5 Attaching horizontal mounting rails
10
Rev. 10.06.15 MANUAL MOUNTING SYSTEM FOR CORRUGATED ROOF
1. Decide the positions on the vertical mounting rails where the horizontal mounting rails (incl. cross connectors) should
come. The horizontal mounting rails are attached at 1/4 H of the top-panel and panel-mounted bottom edge, or a mutual
distance of 2/4 H. Mark the positions on the vertical mounting rails with chalk or marker.
2. Place the horizontal mounting rails onto the vertical mounting rails at the spot of the marked positions.
3. Place the cross connectors onto the vertical mounting rails and slide it properly against the horizontal mounting rails.
4. Screw the cross connectors onto the vertical mounting rails using mounting screws 6,5x32 (tightening torque 4,5Nm).
Ensure the horizontal mounting rails (incl. cross connectors) are aligned in comparison with each other.
5. Height differences in the roof can easily be taken care of by means of the adjustment of the nounting plate in the hanger
bolt.
Make sure the vertical mounting rails are next under each other in connection with the alignment of
the solar panels!
1
2
3
4
5
6

6.6 Hanging solar panels to mounting rail
Temporarily hang the rst solar panel using the preinstalled suspension sockets to the upper mounting rail. This will keep
your hands free for the rest of the installation.
11
Rev. 10.06.15 MANUAL MOUNTING SYSTEM FOR CORRUGATED ROOF

12
Rev. 10.06.15 MANUAL MOUNTING SYSTEM FOR CORRUGATED ROOF
6.7 Mounting 1st solar panel on mounting rail
Slide the rst solar panel to the side of the mounting rail.
Then slide the end clamp onto the mounting rail. Choose the correct recess so that the end clamp connects to the solar
panel. Leave about 1 cm rail visible protrude next to the end clamp. Then screw the end clamp tight using the mounting
screw. The tightening torque of the screw connections is 4,5Nm.
Option: Slide the black end caps in the side of the mounting rails and place the color caps onto the mounting screws.
OPTION

6.8 Mounting other solar panels on mounting rails
Hang the second solar panel on the horizontal mounting rail and slide it towards the rst, until a gap remains of about 7mm.
Then screw the mounting screw with a module clamping plate module into the mounting rail. The tightening torque of the
screw connections is 4,5Nm.
Make sure the solar panels are aligned before you tighten the screw! Repeat this with the remaining solar panels. Option:
Place the black color caps over the mounting screws.
13
Rev. 10.06.15 MANUAL MOUNTING SYSTEM FOR CORRUGATED ROOF
OPTION

14
Rev. 10.06.15 MANUAL MOUNTING SYSTEM FOR CORRUGATED ROOF
6.9 Final assembly / multiple rows under each other
Slide the end clamp onto the mounting rail. Choose the correct recess so that the end clamp connects to the solar panel.
2. Then tighten the end clamp with the mounting screw (tightening torque 4,5Nm).
3. To obtain an interconnected panel surface you slide the underlying solar panels after you hung them with the suspension
sockets onto the mounting rail against the upper row of solar panels with a gap of 1-2 cm.
Then you secure the solar panels rmly using the mounting screws, end clapms and module clamping plates to the
mounting rails.
Option: Slide the black end caps in the side of the mounting rails and place the color caps onto the mounting screws.
OPTION
OPTION
OPTION

13
Rev. 10.06.15 MANUAL MOUNTING SYSTEM FOR CORRUGATED ROOF
7. ANNEX
15
Frame height End clamp Screw length
29mm CFA 55 mm
30mm CFA 55 mm
31mm CFB 55 mm
32 mm CFB 55 mm
33 mm CFA 60 mm
34 mm CFA 60 mm
35 mm CFB 60 mm
36 mm CFB 63 mm
37 mm CFA 63 mm
38 mm CFA 63 mm
39 mm CFB 63 mm
40 mm CFB 63 mm
41 mm CFA 70 mm
42 mm CFA 70 mm
43 mm CFB 70 mm
44 mm CFB 70 mm
45 mm CFA 70 mm
46 mm CFA 70 mm
47 mm CFB 75 mm
48 mm CFB 75 mm
49 mm CFA 75 mm
50 mm CFA 75 mm
51 mm CFB 75 mm
52 mm CFB 75 mm
When applying the hanger bolt for steel purlins, the purlin must be pre-drilled using the table in the following table:
Thickness purlin Drill
1,5 - 5,0mm 6,5mm
5,1 - 6,0mm 7,0mm
6,1 - 10,0mm 7,5mm
Pre-drilling steel purlins
Other manuals for CLICKFIT BASIC
3
Table of contents
Other ESDEC Rack & Stand manuals

ESDEC
ESDEC PANELCLAW clawFR 5 Degree User manual

ESDEC
ESDEC Clickfit Evo User manual

ESDEC
ESDEC PANELCLAW clawFR 10 Degree User manual

ESDEC
ESDEC CLICKFIT BASIC User manual

ESDEC
ESDEC PANELCLAW clawFR Dual Tilt 10 Degree User manual

ESDEC
ESDEC Clickfit Evo User manual

ESDEC
ESDEC Clickfit Evo User manual

ESDEC
ESDEC FlatFix Fusion User manual

ESDEC
ESDEC Clickfit Evo User manual

ESDEC
ESDEC FLATFIX WAVE User manual