
Oponal Tool List:
• Electrical Cords and Power Source
• 4’ or 6’ Level and or Lazar level
• Caulk Gun
• General Hand Tools
• Pencils and or Removable Markers
• High Speed Hammer Drill
• Assorted Ratchets - 1/4” - 1/2”
• Tape Measure
• Ladder and or High Reach
• Liing Device for Raising Canopy
Product Descripon:
This form provides the details required to
eld assemble and install the Fenwall Atlans
G-Guer Canopy.
Please note, these are suggested anchoring
opons. Installer must verify the required
aachment details with engineer.
13929 Lynmar Boulevard, Tampa, FL 33626 813.343.5979 www.fenwalls.com
Atlans G-Guer Canopy
Step by Step Installaon Instrucons:
1) Layout opening to ensure plum and level condions.
2) Locate and aach the upper eback brackets to the wall. Be sure of adequate support backing
by others.
3) Layout the anchoring holes and place pilot holes into the steel or contract substrate.
4) Align pre-drilled mounng holes in the back G-Guer with the pilot holes and anchor the
G-Guer into place.
5) While sll supporng the front of the canopy, aach the ebacks to the mounng brackets.
6) Check several mes during the install for plum and level.
7) Apply approved ashing and caulking as required.
8) Wipe all surfaces clean to ensure no damage was caused during the installaon.
INSTALLATION MANUAL