fiberon SYMMETRY SIGNATURE User manual

berondecking.com
800.573.8841
Manufactured by
6-ft. and 8-ft.
INSTALLATION INSTRUCTIONS
Low-Maintenance Composite Railing
SYMMETRY®
SIGNATURE

Symmetry Signature Railing Installation Instructions - 6-ft. and 8-ft. Line
1
Railing component list for 6-ft. section:
• Top Rail
• Bottom Rail
• H-Channel
• Hardware and Screws
• 14 Balusters
• Crush Block
• Post Caps
• Post Sleeves
• Post Skirt
• Top Rail
• Bottom Rail
• H-Channel
• Hardware and Screws
• 20 Balusters
• 2 Crush Block
• Post Caps
• Post Sleeves
• Post Skirt
Note: Rail lengths will vary slightly due to manufacturing processes. Ensure rails are cut to
correct length with hole pattern centered between posts before securing.
Railing component list for 8-ft. section:
The most recent installation instructions can be found on our website.
Please visit https://www.berondecking.com/resources/installation-instructions or call Consumer and Technical Support at 800-573-8841.
Maximum length between post sleeves is 67 inches.
Post Sleeve Cap
Top Rail Bracket
Top Rail
Top Rail H-Channel
Bottom Rail
Square
Composite
Balusters
Bottom Rail Bracket
Post
Sleeve
Post Sleeve Base Moulding Crush Block
Round
Metal
Balusters
Maximum length between post sleeves is 91 inches.
Post Sleeve Cap
Top Rail Bracket
Top Rail
Top Rail H-Channel
Bottom Rail
Square
Composite
Balusters
Bottom Rail Bracket
Post
Sleeve
Post Sleeve Base Moulding
Round
Metal
Balusters
Crush Blocks

Symmetry Signature Railing Installation Instructions - 6-ft. and 8-ft. Line
2
Required Tools and Supplies:
Top Rail Prole
Bottom Rail Prole
• Power Drill
• Protective Eye Wear
• Tape Measure
• Level
• Speed Square
• Miter Saw
• Pencil
• Adjustable Square
YES
1-1/2-in. minimum from rail end to baluster
NO
Prior to installing railing: Please consult local zoning laws regarding load requirements and bottom space requirements for rails. All supporting
structures must be in accordance with applicable building codes. Neighborhood associations and/or historic districts may regulate size,
placement, and type of railing. Apply for permits if required by local authorities and codes. Ensure compliance prior to installation. Local building
code requirements will always supersede any and all suggested procedures and measurements in the following instructions. The following
installation instructions are intended as a general guideline based on common building practices used in railing installation.
Rail Installation: When top and bottom rail length is greater than the distance between posts, trim both ends of the rail to maintain uniform
baluster spacing. It is critical to ensure the trim mark does not interfere with the balusters once installed.
Cover 4x4 posts or Fiberon surface mount
bracket with post sleeve and verify spacing.
Posts should be plumb in both directions.
Place post sleeve base moulding over post
sleeve and slide it down to the deck surface.
Note: Make sure posts are plumb and level
prior to installing the railing.
1
Measure the distance between the posts
for the bottom rail. Center the hole pattern,
then mark the cutting points. Check for t.
Center the bottom rail with the top rail. Mark
and cut to length.
2
Align the H-bar and the cut bottom rail hole
patterns. Mark the length of the bottom rail
on the H-bar, then subtract 7/32-in. from that
measurement on each end of the H-bar (7/16-
in. total to allow for top bracket thickness) and
mark. Cut the H-bar and set aside for step 7.
3
7/32-in.
The most recent installation instructions can be found on our website.
Please visit https://www.berondecking.com/resources/installation-instructions or call Consumer and Technical Support at 800-573-8841.

Symmetry Signature Railing Installation Instructions - 6-ft. and 8-ft. Line
Square Composite Balusters: Measure and
trim all balusters to the required length.
Remove the baluster guide from the railing
box, place on a at surface, and insert the
balusters into the precut slots.
Note: Square composite baluster lengths
will very slightly due to manufacturing
processes. Insure balusters are cut to
uniform length.
Note: Round metal balusters do not
require trimming.
Ensure that the bottom rail is positioned
correctly prior to installation. The bottom rail
has an aligning feature on the top, which
should be on the yard side of the rail opposite
to the deck side.
Aligning feature
Yard Side Deck Side
Square Composite Balusters: Align the bottom
rail with the balusters on the same end as the
baluster guide. Hold square balusters securely
against the aligning feature on the bottom rail
and secure the balusters to the bottom rail
with the supplied #10 x 1-1/2-in. screws. Do
not over-tighten
Round Metal Balusters: Align baluster with
predrilled holes in bottom rail. Insert supplied
#10 x 1-1/2-in. screw through hole and
into the center (“X”) of the ns inside of the
baluster. Do not over-tighten.
Align the aluminum H-bar with the balusters
with the side holes facing upward.
Square Composite Balusters: Slide the baluster
guide to the opposite end of the balusters.
Insert the top of the balusters fully into the
channel of the aluminum H-bar rail.
Note: When securing composite or metal
balusters, shim the H-bar with a 1/2-in. –
5/8-in. spacer to help ensure balusters
remain perpendicular to the H-bar.
Ensure that the brackets are positioned
correctly prior to installation. The brackets
indicate which side will be facing the decking.
Fully insert top brackets into both ends of
the aluminum H-bar with the arrow pointing
upward.
Using integrated screw template, secure with
self-drilling #10 x 5/8-in. screws. Do not over-
tighten.
Bottom Rail Bracket
H-bar Bracket
5
46
9
8
7
3The most recent installation instructions can be found on our website.
Please visit https://www.berondecking.com/resources/installation-instructions or call Consumer and Technical Support at 800-573-8841.

Symmetry Signature Railing Installation Instructions - 6-ft. and 8-ft. Line
Round Metal Balusters: Insert supplied #10 x
1-1/2-in. screw through holes in the H-bar,
and into the center (“X”) of the ns inside of
the baluster. Drive until secure. Do not over-
tighten.
Square Composite Balusters: Position the top
of the balusters tightly against the inside of
the top H-bar. Center the balusters under the
side-mounting screw holes. Working from one
end to the other, secure each baluster using
the supplied #8 x 1-1/2-in. at head screws.
Do not over-tighten.
Locate the Symmetry Signature bottom line
bracket template (included on the post sleeve
carton and inside the rail kit box).
Using the bottom bracket template, position
and secure bottom brackets using the
supplied #10 x 2 ½-in screws, ensuring the
bracket is positioned correctly (see step 7).
The template will create a 3-in. gap under the
bottom rail.
Dry t, measure, and trim crush block to the
required nal length. Secure crush block to
holder using supplied at head screw.
Note: When using the bracket template, a
3-3/4-in. tall crush block is required. The
screw will be off-center in the crush block.
Approximate center on a rail section up to 6 ft.
For 6-ft. rail sections, position the crush
block and holder inside the bottom rail at the
approximate center point.
For 8-ft. rail sections, position the two crush
blocks and holders inside the bottom rail at
the approximate 1/3 and 2/3 points.
Approximate 1/3 and 2/3 on a
rail section longer than 6 ft.
Pre-drill the two holes with a 1/8-in. bit, taking
care not to drill through the top of the bottom
rail. Secure with the supplied at head screws.
Do not over-tighten.
Carefully position the pre-assembled railing
inll between the posts, then slowly lower over
the bottom brackets until fully seated.
Center the H-bar on the post and check rail
for plumb.
10
11
12
13
14
15
16
4
The most recent installation instructions can be found on our website.
Please visit https://www.berondecking.com/resources/installation-instructions or call Consumer and Technical Support at 800-573-8841.

Center the hole pattern in the bottom rail
between the posts. Transfer length and
angle to the top rail and cut both top and
bottom rails. When aligning the hole pattern,
transferring length, and cutting angles on
the H-bar, remember to subtract 7/32-in.
from each end to allow for top brackets.
Secure with supplied #10 x 2-1/2-in. self-
drilling screws. Do not over-tighten.
Ensure that the bottom rail is positioned
correctly prior to cutting the bottom rail
angle for installation. The bottom rail has an
aligning feature on the top, which should be
on the yard side of the rail opposite to the
deck side.
Aligning feature
Yard Side Deck Side
For angled line installation, the line brackets
must be installed with the angled edge on
the deck side of the railing.
Note: This is opposite of what is indicated
on the line bracket for basic line railing
installation.
The template can still be used to locate
the height of the line bracket. The side-to-
side alignment needs to be approximately
7/32-in. – 1/4-in. off-centered from the
deck side of the railing for a full 45-degree
installation.
Note: If the bracket is not offset slightly,
the top rail may overhang the corner post
face and extend into the corner chamfer.
7/32-in. - 1/4-in.
Deck Side Yard Side
Symmetry Signature Railing
Installation Instructions -
6-ft. and 8-ft. Line (cont.)
5The most recent installation instructions can be found on our website.
Please visit https://www.berondecking.com/resources/installation-instructions or call Consumer and Technical Support at 800-573-8841.
Secure the top brackets with the supplied
#10 x 2-1/2-in. screws.
Using supplied 1-1/2-in. screws, secure
the top rail starting as close to the post as
possible. Space the remaining screws evenly.
Complete the assembly by gluing the post
caps in place with a quality exterior-grade
adhesive.
Position the top rail over the inll assembly and
carefully lower into place.
2
5
3
4
Note: Angled installations require a
minimum 5x5 post.
Symmetry Signature Railing Installation Instructions - Angled Line
1
17
19
20
18

6
The most recent installation instructions can be found on our website.
Please visit https://www.berondecking.com/resources/installation-instructions or call Consumer and Technical Support at 800-573-8841.
Square Composite Balusters: Measure and
trim all balusters to the required length.
Remove the baluster guide from the railing
box. Place on a at surface and insert the
balusters into the precut slots.
Note: Square composite baluster lengths
will very slightly due to manufacturing
processes. Insure balusters are cut to
uniform length.
Note: Round metal balusters do not require
trimming.
6
Square Composite Balusters: Align the bottom
rail with the balusters on the same end as the
baluster guide. Hold square balusters securely
against the aligning feature on the bottom rail
and secure the balusters to the bottom rail
with the supplied #10 x 1-1/2-in. screws. Do
not over-tighten
Round Metal Balusters: Align baluster with
predrilled holes in bottom rail. Insert supplied
#10 x 1-1/2-in. screw through hole and
into the center (“X”) of the ns inside of the
baluster. Do not over-tighten.
79
Square Composite Balusters: Position the top
of the balusters tightly against the inside of
the top H-bar. Center the balusters under the
side-mounting screw holes. Working from one
end to the other, secure each baluster using
the supplied #8 x 1-1/2-in. at head screws.
Do not over-tighten.
Note: The screws should penetrate fully
through the baluster.
8
Insert top brackets into the cavity of the
aluminum H-bar, ensuring that the top bracket
is located within the boundaries of the H-bar.
If the bracket is outside of the boundaries, the
top rail will not t over the H-bar and bracket.
Secure with the supplied #10 x 5/8-in. self-
drilling screws.
NO YES
Assemble and attach the crush block
following standard line railing instructions.
Position the assembled inll over the bottom
brackets and carefully lower into place and
secure the top brackets with the supplied #10
x 2-1/2-in. screws.
10
Position the top rail over the inll assembly,
and carefully lower into place.
11
Using supplied 1-1/2-in. screws, secure
the top rail starting as close to the post as
possible. Space the remaining screws evenly.
Complete the assembly by gluing the post
caps in place with a quality exterior-grade
adhesive.
12
Symmetry Signature Railing Installation Instructions - Angled Line
Round Metal Balusters: Insert supplied #10 x
1-1/2-in. screw through holes in the H-bar,
and into the center (“X”) of the ns inside of
the baluster. Drive until secure. Do not over-
tighten.
13

Symmetry Signature Railing Installation Instructions - 6-ft. and 8-ft. Stair
7
Building codes are very specic on
allowable angles and widths. It is very
important to consult with your local building
code ofcials and plan your stair layout
accordingly. Leave adequate space for
graspable hand rail if applicable.
Note: The slope of the stairs can be 30-37
degrees.
Center the hole pattern between the posts,
allowing a minimum 1-5/8-in. from rail end to
routed baluster holes.
To establish the stair angle, use a 1x4 or
similar support to bridge at least three stairs.
Place the bottom rail between the stair posts.
Cover 4x4 posts or Fiberon surface mount
bracket with post sleeve and verify spacing.
Posts should be plumb in both directions.
Place post sleeve base moulding over post
sleeve and slide it down to the deck surface.
3
Note: Rail lengths will vary slightly due to
manufacturing processes. Make sure rails
are cut to correct length.
Transfer the stair angle to both ends of the
bottom rail and cut to the required length
and angle. Test for a snug t and make
corrections as needed.
5
6
Square Composite Balusters: Transfer the stair
angle to the balusters, and cut the balusters
to desired length.
Note: Round metal balusters are pre-cut on
one end. If a custom angle is required, cut
the factory angled end, leaving the square
end as is. This will allow proper seating
when securing the top of the balusters later
in the installation.
The most recent installation instructions can be found on our website.
Please visit https://www.berondecking.com/resources/installation-instructions or call Consumer and Technical Support at 800-573-8841.
The maximum length between
post sleeves measured in line with
the guardrail cannot exceed 5 in.
short of full length, depending on
which kit is being used.
1
Ensure that the bottom rail is positioned
correctly prior to cutting the bottom rail
angle for installation. The bottom rail has an
aligning feature on the top, which should be
on the yard side of the rail opposite to the
deck side.
Aligning feature
Yard Side Deck Side
2
4

8
7
To cut the H-bar, rst place the H-bar on
its side with the holes nearest to the cut
bottom rail. The bottom rail should be top
side up. Align the hole pattern with the cut
bottom rail.
Symmetry Signature Railing Installation Instructions - 6-ft. and 8-ft. Stair
8
9
10
Transfer the length of the cut bottom rail to
the H-bar.
Scribe the stair angle to the side of the
H-bar at both ends.
The total length of the H-bar will be 7/16-in.
shorter than the cut bottom rail.
Scribe a second line 7/32-in. inside the rst
at both ends.
Note: This allows for the thickness of the
upper bracket.
11
Position the top brackets into the H-bar,
ensuring that they are inserted completely.
Secure the top brackets to the H-bar using
(two) 5/8-in. self-drilling pan head screws. Do
not over-tighten.
12
The most recent installation instructions can be found on our website.
Please visit https://www.berondecking.com/resources/installation-instructions or call Consumer and Technical Support at 800-573-8841.
Square Composite Balusters: Remove the
baluster guide from the rail box. Place on a
at surface and insert the balusters into the
precut slots.
Round Metal Balusters: Place cut bottom rail
on a at level surface. Align the cut-end of
the round metal baluster with the top surface
of the bottom rail.
13
Square Composite Balusters: Align the end
baluster with the predrilled hole in the bottom
rail. Secure the balusters using the supplied
#10 x 1-1/2-in. screws.
Hold each square composite baluster
securely against the aligning feature and
drive screws parallel with the balusters, not
perpendicular to the bottom rail. Do not over-
tighten.
Round Metal Balusters: Insert the screw into
the center “X” of the end baluster. It may be
necessary to slightly over-drill the factory-
drilled holes by rocking the moving bit parallel
with the direction of the rail. Do not over-
tighten.
Continue working from one end until all the
balusters are secured into the bottom rail.
14

For 6-ft. rails sections, position the crush
block and holder inside the bottom rail at the
approximate center point.
For 8-ft. rail sections, position the two crush
blocks and holders inside the bottom rail at
the approximate 1/3 and 2/3 points.
Secure crush block to crush block holder
using a supplied #8 at head screw. Do not
over-tighten.
Note: The screw will be off-center in the
crush block.
Before assembling the crush block, transfer
the stair angle to the end of the crush block,
dry t, and cut to t.
Dry t the assembled section and use the
bottom rail to scribe a light line on the post
to determine the location of the bottom rail
bracket.
Note: For best results, predrill bracket holes
on post with a 1/8-in. - 5/32-in. bit to ensure
accurate screw placement and full insertion,
particularly as the stair angle increases.
Secure the bottom stair brackets to the post
using the supplied #10 x 2-1/2-in. at the
desired height. Do not over-tighten.
Symmetry Signature Railing Installation Instructions - 6-ft. and 8-ft. Stair
9
17
18
16
19
The most recent installation instructions can be found on our website.
Please visit https://www.berondecking.com/resources/installation-instructions or call Consumer and Technical Support at 800-573-8841.
Note: It is important to ensure balusters
are level when securing. Shim the H-bar
with a 1/2-in. - 5/8-in. spacer to ensure
the balusters remain fully inserted when
securing.
Square Composite Balusters: Move the
baluster guide to the top rail end of the square
composite balusters.
Position the top of the balusters tightly
against the inside of the top H-bar. Center
the balusters under the side-mounting screw
holes. Working from one end to the other,
secure each baluster using the supplied
#8 x 1-1/2-in. at head screws. Do not over-
tighten.
Note: The screws should penetrate fully
through the baluster.
Secure the remaining balusters working to the
other end. Do not over-tighten.
Round Metal Balusters: Insert the round
baluster holders into the aluminum H-bar,
ensuring that the angled hole is oriented
correctly and that the through hole aligns with
the side holes in the H-bar.
Fully seat all balusters into the holders. Secure
an end baluster rst, using the supplied #8 x
1-1/2-in. at head self-drilling screws through
the H-bar side holes.
Pivot the H-bar toward the remaining
balusters, inserting them into the holders.
Start from the secured end and work
to the other end. Secure the remaining
end baluster, and then the remaining inll
balusters.
15
Approximate center on a rail
section up to 6 ft.
Approximate 1/3 and 2/3 on a
rail section longer than 6 ft.

10
Carefully position the pre-assembled railing in-
ll between the posts, then slowly lower over
the bottom brackets until fully seated.
21
Center the H-bar on the post and check rail
for plumb.
22
Starting at the top, secure the H-bar to
the posts at both ends using the supplied
#10 x 2-1/2-in. self-drilling pan head screws.
Do not over-tighten.
23
Symmetry Signature Railing Installation Instructions - 6-ft. and 8-ft. Stair
Position the top rail over the inll assembly,
and carefully lower into place.
24
Using supplied 1-1/2-in. screws, secure
the top rail starting as close to the post as
possible. Space the remaining screws evenly.
25
Complete the assembly by gluing the post
caps in place with a quality exterior-grade
adhesive.
26
The most recent installation instructions can be found on our website.
Please visit https://www.berondecking.com/resources/installation-instructions or call Consumer and Technical Support at 800-573-8841.
Position the crush block and holder into the
bottom rail, and locate the two screw holes.
Remove the holder and pre-drill using a
1/8-in. drill bit. Reposition the crush block and
holder, and secure with the supplied #8 x 1-in.
screws. Do not over-tighten.
20

berondecking.com
800.573.8841
Design Grid
FIB-0344-LIT 4/19

berondecking.com
1.800.573.8841
Fabricado por
1.83 m y 2.44 m
INSTRUCCIONES PARA LA INSTALACIÓN
Barandilla de material compuesto
de bajo mantenimiento
SYMMETRY®
SIGNATURE

Instrucciones para la instalación de barandillas en línea
Symmetry Signature de 1.83 m y 2.44 m
1
Lista de componentes de las barandillas para la sección de 1.83 m:
Nota: las longitudes de los travesaños variarán ligeramente según los procesos de fabricación. Antes de jar los
travesaños, asegúrese de cortarlos, a la longitud correcta y con el patrón de hoyos centrado entre los postes.
Lista de componentes de las barandillas para la sección de 2.44 m:
Las instrucciones de instalación más recientes están disponibles en nuestro sitio de Internet.
Visite el sitio https://www.berondecking.com/resources/installation-instructions o llame al Departamento de servicio al consumidor y soporte técnico al 1-800-573-8841.
• Travesaño superior
• Travesaño inferior
• Canal en H
• Herrajes y tornillos
• 14 balaustres
• Bloque de soporte
• Tapas de los postes
• Fundas para postes
• Fasldones para postes
La longitud máxima entre las fundas para poste es de 170 cm.
Tapa de funda para poste
Soporte del travesaño superior
Travesaño superior
Canal H del travesaño superior
Travesaño inferiorl
Square
Composite
Balusters
Soporte del travesaño inferior
Funda
para poste
Moldura de base de la funda para poste
Bloque de soporte
Balaustres
metálicos
redondos
La longitud máxima entre las fundas para poste es de 231 cm.
• Travesaño superior
• Travesaño inferior
• Canal en H
• Herrajes y tornillos
• 20 balaustres
• 2 Bloque de soporte
• Tapas de los postes
• Fundas para postes
• Fasldones para postes
Tapa de funda para poste Travesaño superior
Canal H del travesaño superior
Travesaño inferior
Balaustres
cuadrados
de material
compuesto
Soporte del travesaño inferior
Funda
para poste
Moldura de base de la funda para poste
Balaustres
metálicos
redondos
Bloque de soporte
Soporte del travesaño superior

2
Instrucciones para la instalación de barandillas en línea Symmetry Signature de 1.83 m y 2.44 m
Herramientas y materiales necesarios:
Perl del travesaño superior
Perl del travesaño inferior
• Taladro eléctrico
• Protectores oculares
• Cinta métrica
• Nivel
• Escuadra triangular de acero
• Sierra ingletadora
• Lápiz
• Escuadra ajustable
SÍ
Distancia mínima de 38 mm desde el
extremo del travesaño hasta el balaustre
NO
Antes de instalar las barandillas: Sírvase consultar las leyes de zonicación locales con respecto a los requerimientos de carga y de espacio inferior para los
travesaños. Todas las estructuras de soporte deben cumplir con los códigos de construcción vigentes. Las asociaciones de vecinos y los distritos históricos
pueden regular el tamaño, la posición y el tipo de barandilla. Solicite permisos si así lo requieren las autoridades y códigos locales. Asegúrese de cumplir con
la normativa antes de la instalación. Los requerimientos del código de construcción local siempre prevalecen sobre todos y cada uno de los procedimientos
y medidas que sugerimos a continuación. Las siguientes instrucciones de instalación están diseñadas como una guía general basada en prácticas de
construcción comunes empleadas en la instalación de barandillas.
Instalación del travesaño: Si la longitud del travesaño superior e inferior es mayor a la distancia entre los postes, recorte ambos extremos del travesaño
para mantener una separación uniforme de los balaustres. Es de vital importancia que la marca de recorte no interera con los balaustres una vez instalados.
Utilizando fundas para poste, cubra los postes de
10 x 10 cm o el soporte de montaje en supercie
de Fiberon y verique la separación. Los postes
deben estar a plomo en ambas direcciones.
Coloque la moldura de base de la funda para
poste sobre la funda para poste y deslícela hasta
la supercie del entablado.
Nota: antes de instalar la barandilla, asegúrese
de que los postes estén a plomo y a nivel.
1
En el travesaño inferior, mida la distancia entre los
postes. Centre el patrón de hoyos y marque los
puntos de corte. Compruebe el calce.
Centre el travesaño inferior con el travesaño
superior. Marque y corte al largo correcto.
2
Alinee la barra H y los patrones de hoyos
cortados del travesaño inferior. Marque el largo
del travesaño inferior en la barra en H, luego reste
5.5 mm a la medición en cada extremo de dicha
barra (11 mm en total para dejar espacio para el
grosor del soporte superior) y marque. Corte la
barra en H y apártela hasta el paso 7.
3
5.5 mm
Las instrucciones de instalación más recientes están disponibles en nuestro sitio de Internet.
Visite el sitio https://www.berondecking.com/resources/installation-instructions o llame al Departamento de servicio al consumidor y soporte técnico al 1-800-573-8841.

Instrucciones para la instalación de barandillas en línea Symmetry Signature de 1.83 m y 2.44 m
Balaustres cuadrados de material compuesto: Mida
y recorte todos los balaustres al largo requerido.
Retire la guía de balaustres de la caja de la
barandilla, colóquela en una supercie plana
e introduzca los balaustres en las ranuras
precortadas.
Nota: las longitudes de los balaustres
cuadrados de material compuesto
variarán ligeramente según los procesos
de fabricación. Asegúrese de cortar los
balaustres a la misma longitud.
Nota: no es necesario recortar los balaustres
metálicos redondos.
Antes de la instalación, asegúrese de que el
travesaño inferior esté colocado en la posición
correcta. El travesaño inferior presenta un
elemento de alineación en la parte superior,
la cual debe quedar en el lado del travesaño
que está orientado hacia el patio y en sentido
opuesto al lado orientado hacia el entablado.
Elemento de
alineación
Hacia el patio Hacia el entablado
Balaustres cuadrados de material compuesto: Alinee
el travesaño inferior con los balaustres en el
mismo extremo en que está la guía de balaustres.
Sujete rmemente los balaustres cuadrados
contra el elemento de alineación situado en el
travesaño inferior y je los balaustres al travesaño
inferior con los tornillos n.° 10 de 38 mm que se
incluyen. No apriete en exceso.
Balaustres metálicos redondos: Alinee el balaustre
con los hoyos previamente perforados en el
travesaño inferior. Inserte el tornillo n.° 10 de
38 mm suministrado a través del hoyo y en el
centro (“X”) de las aletas dentro del balaustre. No
apriete en exceso.
Alinee la barra en H de aluminio con los balaustres,
asegurándose de que los hoyos laterales estén
orientados hacia arriba.
Balaustres cuadrados de material compuesto:
Deslice la guía de balaustre hasta el extremo
opuesto de los balaustres. Inserte la parte
superior de los balaustres en el canal de la barra
en H de aluminio.
Nota: cuando je los balaustres de material
compuesto o metálicos, calce la barra en H
con un espaciador de 13 mm – 16 mm para
ayudar a asegurar que los balaustres queden
perpendiculares a la barra en H.
Antes de la instalación, asegúrese de que los
soportes estén colocados en la posición correcta.
Los soportes indican qué lado estará orientado
hacia el entablado.
Inserte completamente los soportes superiores en
ambos extremos de la barra en H de aluminio con
la echa apuntando hacia arriba.
Use la plantilla de tornillos integrada para jar con
los tornillos autorroscantes n.° 10 de 16 mm. No
apriete en exceso.
Soporte del
travesaño inferior
Soporte de barra en H
5
46
9
8
7
3Las instrucciones de instalación más recientes están disponibles en nuestro sitio de Internet.
Visite el sitio https://www.berondecking.com/resources/installation-instructions o llame al Departamento de servicio al consumidor y soporte técnico al 1-800-573-8841.

4
Instrucciones para la instalación de barandillas en línea Symmetry Signature de 1.83 m y 2.44 m
Balaustres metálicos redondos: Inserte el tornillo
n.° 10 de 38 mm suministrado a través de los
hoyos de la barra en H y en el centro (“X”) de las
aletas dentro del balaustre. Atornille hasta lograr
la sujeción. No apriete en exceso.
Balaustres cuadrados de material compuesto:
Coloque la parte superior de los balaustres
rmemente unida a la parte interior de la barra
en H superior. Centre los balaustres debajo
de los hoyos para tornillos de montaje lateral.
Avanzando de un extremo al otro, je cada
balaustre con los tornillos de cabeza plana n.° 8
de 38 mm que se incluyen. No apriete en exceso.
Tome la plantilla del soporte inferior Symmetry
Signature (se incluye en la caja de cartón de
fundas para poste y dentro de la caja del kit de
travesaños).
Use la plantilla de soporte inferior para colocar y
jar los soportes inferiores con los tornillos n.° 10
x 64 mm suministrados, asegurándose de que
el soporte quede correctamente colocado (ver el
paso 7).
La plantilla creará un espacio de 76 mm debajo
del travesaño inferior.
Ajuste en seco, mida y recorte el bloque de
soporte al largo nal requerido. Fije el bloque de
soporte a la base con el tornillo de cabeza plana
que se incluye.
Nota: se requiere utilizar un bloque de soporte de
9.5 cm cuando se utilice la plantilla del soporte.
El tornillo estará descentrado en el bloque de
soporte.
Centro aproximado en una sección
de travesaño de hasta 1.83 m.
Para las secciones de pasamanos de 1.83 m,
posicione el bloque de soporte y la base dentro
del travesaño inferior, aproximadamente en el
punto central.
Para las secciones de travesaño de 2.44 m,
posicione los dos bloques de soporte y las bases
dentro del travesaño inferior, aproximadamente
en los puntos de 1/3 y 2/3.
Aproximadamente 1/3 y 2/3 en una
sección de travesaño mayor de 1.83 m.
Perfore previamente dos hoyos con una broca
de 3.2 mm, cuidando de no perforar la parte
superior del travesaño inferior. Fije con los
tornillos de cabeza plana que se incluyen. No
apriete en exceso.
Coloque con cuidado la barandilla previamente
ensamblada en el espacio entre los postes, luego
bájela suavemente hasta que quede totalmente
asentada sobre los soportes inferiores.
Centre la barra en H en el poste y compruebe que
el travesaño esté a plomo.
10
11
12
13
14
15
16
Las instrucciones de instalación más recientes están disponibles en nuestro sitio de Internet.
Visite el sitio https://www.berondecking.com/resources/installation-instructions o llame al Departamento de servicio al consumidor y soporte técnico al 1-800-573-8841.

Centre el patrón de hoyos en el travesaño inferior
entre los postes. Traslade el largo y el ángulo al
travesaño superior y corte el travesaño superior
e inferior. Al alinear el patrón de hoyos, trasladar
el largo y cortar los ángulos en la barra en H,
recuerde restar 5.5 mm de cada extremo a n de
dejar espacio para los soportes superiores.
Fije con los tornillos autorroscantes n.° 10 de
64mm que se incluyen. No apriete en exceso.
Antes de cortar el ángulo del travesaño inferior
para la instalación, asegúrese de que dicho
travesaño esté colocado en la posición correcta.
El travesaño inferior presenta un elemento de
alineación en la parte superior, la cual debe
quedar en el lado del travesaño que está
orientado hacia el patio y en sentido opuesto al
lado orientado hacia el entablado.
Elemento de
alineación
Hacia el patio Hacia el entablado
Para la instalación de la línea en ángulo, los
soportes deben instalarse con el borde angulado
en el lado de la barandilla que queda hacia el
entablado.
Nota: esto es contrario a lo que se indica en el
soporte para la instalación básica de barandillas
en línea.
La plantilla aún se puede usar para ubicar la
altura del soporte. Para una instalación completa
de 45 grados, la alineación adyacente deberá
estar a 5.5 mm - 6.4 mm con respecto al centro,
desde el lado de la barandilla que queda hacia el
entablado.
Nota: si el soporte no se separa ligeramente del
centro, el travesaño superior puede sobresalir de
la cara del poste de esquina y extenderse hacia
el chaán de esquina.
5.5 mm – 6.4 mm
Hacia el entablado Hacia el patio
Instrucciones para la
instalación de barandillas en
línea Symmetry Signature de
1.83 m y 2.44 m (cont.)
5Las instrucciones de instalación más recientes están disponibles en nuestro sitio de Internet.
Visite el sitio https://www.berondecking.com/resources/installation-instructions o llame al Departamento de servicio al consumidor y soporte técnico al 1-800-573-8841.
Fije los soportes superiores con los tornillos n.°
10 de 64 mm suministrados.
Fije el travesaño superior utilizando los tornillos
de 38 mm suministrados, comenzando lo más
cerca posible del poste. Separe uniformemente
los tornillos restantes.
Termine el ensamblaje pegando las tapas de los
postes en su sitio con un adhesivo de calidad
apto para exteriores.
Coloque el travesaño superior sobre el
ensamblaje de la barandilla, y bájelo con cuidado
hasta su posición.
2
5
3
4
Nota: las instalaciones en ángulo requieren
como mínimo un poste de 12.7 x 12.7 cm.
Instrucciones para la instalación de barandillas
Symmetry Signature - anguladas en línea
1
17
19
20
18

6
Las instrucciones de instalación más recientes están disponibles en nuestro sitio de Internet.
Visite el sitio https://www.berondecking.com/resources/installation-instructions o llame al Departamento de servicio al consumidor y soporte técnico al 1-800-573-8841.
Balaustres cuadrados de material compuesto:
Mida y recorte todos los balaustres al largo
requerido. Retire la guía de balaustres de la caja
de la barandilla. Colóquela en una supercie
plana e introduzca los balaustres en las ranuras
precortadas.
Nota: las longitudes de los balaustres
cuadrados de material compuesto
variarán ligeramente según los procesos
de fabricación. Asegúrese de cortar los
balaustres a la misma longitud.
Nota: no es necesario recortar los balaustres
metálicos redondos.
6
Balaustres cuadrados de material compuesto: Alinee
el travesaño inferior con los balaustres en el
mismo extremo en que está la guía de balaustres.
Sujete rmemente los balaustres cuadrados
contra el elemento de alineación situado en el
travesaño inferior y je los balaustres al travesaño
inferior con los tornillos n.° 10 de 38 mm que se
incluyen. No apriete en exceso.
Balaustres metálicos redondos: Alinee el balaustre
con los hoyos previamente perforados en el
travesaño inferior. Inserte el tornillo n.° 10 de
38 mm suministrado a través del hoyo y en el
centro (“X”) de las aletas dentro del balaustre. No
apriete en exceso.
79
Balaustres cuadrados de material compuesto:
Coloque la parte superior de los balaustres
rmemente unida a la parte interior de la barra
en H superior. Centre los balaustres debajo
de los hoyos para tornillos de montaje lateral.
Avanzando de un extremo al otro, je cada
balaustre con los tornillos de cabeza plana n.° 8
de 38 mm que se incluyen. No apriete en exceso.
Nota: los tornillos deben penetrar por completo a
través del balaustre.
8
Introduzca los soportes en la cavidad de la
barra en H de aluminio, asegurándose de que el
soporte superior esté situado dentro de los límites
de la barra en H. Si el soporte está fuera de los
límites, el travesaño superior no calzará sobre
la barra en H y el soporte. Fije con los tornillos
autorroscantes n.° 10 de 16 mm suministrados.
NO SÍ
Ensamble y je el bloque de soporte según
las instrucciones de las barandillas en línea
estándar.
Coloque la barandilla ensamblada sobre los
soportes inferiores, y bájela con cuidado hasta
su lugar y je los soportes superiores con los
tornillos n.° 10 de 64 mm suministrados.
10
Coloque el travesaño superior sobre el
ensamblaje de la barandilla, y bájelo con cuidado
hasta su posición.
11
Fije el travesaño superior utilizando los tornillos
de 38 mm suministrados, comenzando lo más
cerca posible del poste. Separe uniformemente
los tornillos restantes.
Termine el ensamblaje pegando las tapas de los
postes en su sitio con un adhesivo de calidad
apto para exteriores.
12
Instrucciones para la instalación de barandillas Symmetry Signature - anguladas en línea
Balaustres metálicos redondos: Inserte el tornillo
n.° 10 de 38 mm suministrado a través de los
hoyos de la barra en H y en el centro (“X”) de las
aletas dentro del balaustre. Atornille hasta lograr
la sujeción. No apriete en exceso.
13

Instrucciones para la instalación de barandillas de escalera
Symmetry Signature de 1.83 m y 2.44 m
7
Los códigos de construcción son muy
especícos respecto de los ángulos y los anchos
permitidos. Es muy importante consultar a los
funcionarios que administran los códigos de
construcción locales y planear el diseño de las
escaleras de conformidad con estos. Deje un
espacio adecuado para asir el pasamanos, si
corresponde.
Nota: la pendiente de las escaleras puede ser de
30 a 37 grados.
Centre el patrón de hoyos entre los postes,
dejando una distancia mínima de 41 mm desde el
extremo del travesaño hasta los hoyos perforados
en el balaustre.
Para establecer el ángulo de la escalera, utilice
un soporte de 2.5 cm x 10 cm o similar para
conectar al menos tres peldaños. Coloque el
travesaño inferior entre los postes de la escalera.
Utilizando fundas para poste, cubra los postes de
10 x 10 cm o el soporte de montaje en supercie
de Fiberon y verique la separación. Los postes
deben estar a plomo en ambas direcciones.
Coloque la moldura de base de la funda para
poste sobre la funda para poste y deslícela hasta
la supercie del entablado.
3
Nota: las longitudes de los travesaños variarán
ligeramente según los procesos de fabricación.
Asegúrese de cortar los travesaños al largo
adecuado.
Marque el ángulo de la escalera en ambos
extremos del travesaño inferior, y corte este
último al largo y ángulo requeridos. Compruebe
que haya una correcta sujeción y realice las
correcciones que sean necesarias.
5
6
Balaustres cuadrados de material compuesto:
Marque el ángulo de la escalera en los balaustres
y corte estos últimos al largo deseado.
Nota: los balaustres metálicos redondos están
precortados en un extremo. Si se requiere un
ángulo personalizado, corte el extremo que viene
angulado de fábrica y deje el extremo cuadrado
como está. Esto permitirá un asiento adecuado
cuando se je la parte superior de los balaustres
posteriormente en la instalación.
Las instrucciones de instalación más recientes están disponibles en nuestro sitio de Internet.
Visite el sitio https://www.berondecking.com/resources/installation-instructions o llame al Departamento de servicio al consumidor y soporte técnico al 1-800-573-8841.
El largo máximo entre las fundas
para poste, medido en línea con el
barandal, no pude superar el largo
total menos 12.7 cm, dependiendo
del kit que se utilice.
1
Antes de cortar el ángulo del travesaño inferior
para la instalación, asegúrese de que dicho
travesaño esté colocado en la posición correcta.
El travesaño inferior presenta un elemento de
alineación en la parte superior, la cual debe
quedar en el lado del travesaño que está
orientado hacia el patio y en sentido opuesto al
lado orientado hacia el entablado.
Elemento de
alineación
Hacia el patio Hacia el entablado
2
4
Table of contents
Languages:
Popular Other manuals by other brands

Chore-Time
Chore-Time Linear Lift 800 Installation & operator's instruction manual

Spyard
Spyard 960 operating instructions

Sharper Image
Sharper Image OWN ZONE instruction manual

Fluidmaster
Fluidmaster Duo flush installation guide

QNN Safe
QNN Safe IF-1500E user manual

Ganz
Ganz ZC-DT8039NXA instruction manual

Quest Engineering
Quest Engineering Dry RDS 10 Installation, operation and maintenance instructions

Columbus
Columbus Travel 600 operating manual

Lenovo
Lenovo Star Wars Jedi Challenges user guide

Ferm
Ferm FLS-400 user manual

Buyers Products Company
Buyers Products Company TGC25006C installation instructions

Dwyer Instruments
Dwyer Instruments DW-WIFI Series Installation and operating instructions