
C
L
3. Placesuspensionrails.Center suspension rails over
center marks and clamp lower impact energy absorber to
the structure. Impact energy absorber linkages must be
positioned to move down and forward in the same direction
as belt travel (Fig. 3).
FIG.3
FIG.4
4. Squaresuspensionrails.Loosen clamps as necessary.
Spread suspension rails until leg of crossbrace ts
inside rails and bolt in place. Center assembly over the
structure. Measure A-B and C-D dimensions and move
until they are equal. Weld crossbraces to suspension
rail. Weld lower impact energy absorber to structure and
remove clamps (Fig. 4).
FIG.5
5. Compresssuspensionrails.Compress suspension rails
with four C-clamps to give an additional 2.5" (63mm) of
clearance for assembly (Fig. 5).
FIG.6
6. Disassemblewingassemblies.Remove the center
mount bolt and the two outer ange bolts. Slide out and
remove the wing assembly on each channel crossbeam
(Fig. 6). (Keep bolts, nuts and washers for use later.)
7. Installcrossbeams.Slide all crossbeams onto the
conveyor structure and set on lower inside ange of
suspension rail. Bolt in place with bolt facing up to
minimize space constraints (Fig. 7). NOTE: Crossbeams
must all be in line before tightening down.
FIG.7
BELT DIRECTION
AD
C B
Weld lower rostas to
structure both sides
Suspension
rail
CROSSBRACES
BELT
CROSSBEAM Bolt in place as shown
Weld crossbraces to
suspension rails 4 places