FWB interactiveRACQUETBALL User manual

Fun With Balls GmbH
Gyßlingstraße 72
80805 Munich
Germany
© 2020
Installation Manual

1. Hardware:
With the following simple guidelines we would like to guide you to an easy installation of interactiveRACQUETBALL.
Our system consists of one console, two sensor bars and four cameras.
2
Fun With Balls GmbH, 2020 ©

1
2
3
4
5
6
7
8
9
1. Hardware:
Included hardware components of interactiveRACQUETBALL:
Components:
1. Console
2. Sensor Bar Bottom
3. Sensor Bar Top
4. Camera Front Left
5. Camera Front Right
6. Camera Top
7. Camera Rear
8. Speakers
9. Main Cable
3
Fun With Balls GmbH, 2020 ©

Required court properties to install interactiveRACQUETBALL:
Requirements:
1. Dedicated Power Outlet
Active Internet Connection
2. Console Mounting Space
Ceiling Load-Bearing 100kg/220lbs
or Stand Load-Bearing 100kg/220lbs
3. Floor and Ceiling Spaces to
integrate the Sensor Bars
4. Cable Ducts
5. Wall Spaces for Cameras
1
2
3
4
5
1. Hardware:
4
3
5
5
5
4
4
4
4
4
Fun With Balls GmbH, 2020 ©

First delivery: Second delivery:
Console mounting plate Console
Front Wall Paint Sensor Bars
Cameras
Main Cable
The system will be installed and activated by our team or you will get remote installation support.
Installation Steps:
1. Check delivered components
2. Check already sent components before for court preparation
3. Check court measurements
4. Check internet and power plug
5. Unpack & arrange
6. Installation console
7. Mount sensor bar top
8. Mount sensor bar bottom
9. Connect sensor bars
10. Install cameras
11. Projector adjustment
12. Hardware adjustments with setup
2. Installation:
5
Fun With Balls GmbH, 2020 ©

Box 1:
1x Console
2x Speakers
Box 2:
8x Sensor Bar Parts
4x Cameras
1x Wiring Harness
2. 1. Check delivered components:
6
1
2
Fun With Balls GmbH, 2020 ©

The front wall should always be painted with our white paint.
The console mounting plate (1) should already be fixed (load-bearing 100kg/220lbs) on the ceiling before starting installation.
The console can also be placed on a stand (load-bearing 100kg/220lbs).
Make sure that the console is placed in middle at the rear of the court at the most up position.
The front of the console must be aligned with the inner court surface (2).
2. 2. Check already mounted components before installation:
7
1
2
Fun With Balls GmbH, 2020 ©

Cable channel (1) in the middle behind the front wall with a diameter of minimum 4 inch.
2. 2. Check already mounted components before installation:
8
1
Fun With Balls GmbH, 2020 ©

With the help of a laser measurement device, check the front wall´s measurements.
Front wall: Left side wall to right side wall inside length is minimum 239.85 inch.
Optional the sensor bars can be cut by 0,75 inch for a wall inside length of minimum 239.1 inch.
Sensor Bar Space Requirements Floor and Ceiling: Camera Space Requirements Front/Rear Wall and Ceiling:
2. 3. Check court measurements:
9
Fun With Balls GmbH, 2020 ©

Connect a laptop to the provided Ethernet connection with a cable.
Open up a network browser window and go to website “speedof.me” to run an Internet Speed Test.
Connect a device (Laptop charger, phone charger, etc.) to the provided power plug & check the device is charging.
2. 4. Check Internet and Power Plug:
10
Fun With Balls GmbH, 2020 ©

Remove the nails that hold the box’s wooden walls together to bring the material out of its delivery box & bring them into the court.
Arrange them to ease and make installation process fast.
2. 5. Unpack & Arrange:
11
Fun With Balls GmbH, 2020 ©

Set anchor on the holding plate for the rope/chain hoist to lift up the console.
Secure the chain hoist to the console metal structure.
With the help of a scaffold, accompany the console as it’s being lifted up.
Secure the console to the holding plate.
Open the all side covers of the console.
Connect the console to power and internet.
Reference video links (interactiveSQUASH):
●1_Projector box tieing
●2_Projector box lifting to ceiling
●3_Projector box fixing to mounting plate
2. 6. Installation Console:
12
Fun With Balls GmbH, 2020 ©

Run the main cable (1) from the console (2) to the middle of the sensor bar bottom (3).
Connect the console to power and internet (4).
2. 6. Installation Console:
13
3
2
1
2
3
44
12
Fun With Balls GmbH, 2020 ©

Front light control:
Place the switch (1) in the power supply system (2) of the court lights so that the front lights can be controlled by the console.
Connect the female plug (3) with the power supply, the male plug (4) with the front light and connect the control cable (5) with the console.
2. 6. Installation Console:
14
1
2
Fun With Balls GmbH, 2020 ©
1
3
4
5
5

Start with sensor part number 1 from the left side.
Remove the covers and mount the sensor bar flush into the ceiling directly in the connection to the front wall.
Secure the green plugs (1) and run the cables through the cable duct behind the front wall to the sensor bar bottom. Mount the covers.
Reference video links (interactiveSQUASH):
●4_Mounting upper sensor bars
●5_Mounted and cabled upper sensor bars
2. 7. Mount Sensor Bar Top:
16
1
Fun With Balls GmbH, 2020 ©

Start with part no. 1 from the left side. Remove the covers and mount the sensor bar flush into the floor directly in the connection to the front wall.
Reference video links (interactiveSQUASH):
●10_Sensor tin bottom mounting
●11_Connecting light bar connector
●12_Connecting upper sensor bars to lower sensor tins via connector
●13_Connecting lower sensor tins together
2. 8. Mount Sensor Bar Bottom:
17
Fun With Balls GmbH, 2020 ©

Plug the red marked cables (1) coming from the sensor bar top into the SEA (2) port of the corresponding bottom sensor bar´s LVX (green board).
Plug the black marked cables (3) coming from the sensor bar top into the EMA (4) port of the corresponding bottom sensor bar´s LVX .
2. 9. Connect Sensor Bars:
18
1
2
3
4
Fun With Balls GmbH, 2020 ©

Connect the sensor bar parts with each other (1).
Connect the the main cable (2) with the sensor bar bottom.
Run the LAN cables (3) from the main cable (2) to the camera spots (4).
2. 9. Connect Sensor Bars:
19
1 12
4
4
1 2
2
3
Fun With Balls GmbH, 2020 ©

When all tins are installed - Perform the calibration steps:
1. Switch up the PIN 3 on all LVXs (green board)
2. Unplug the power supply by disconnecting the main cable going in the y-splitter.
3. Plug back in the power supply.
4. Switch down the PIN 3 on all LVXs
5. Unplug the power supply.
6. Plug back in the power supply.
2. 9. Connect Sensor Bars:
20
1
2
3
4
5
6
Fun With Balls GmbH, 2020 ©
Table of contents
Other FWB Sport & Outdoor manuals