
LeSide Down (2)
Right Side Down (2)
Boom Right (1)
Boom Le(1)
Top Le(4) Top Right (4)
Console (5)
Right Side Up (2)
LeSide Up (2)
Step 2
Mount Holders and Console
1. Mount the Boom Holders
Le, Middle and Right touching
each other.
(Distance to oor 20mm)
2. Mount LeSide and Right Side.
3. Verify Leand Right are fully
leveled and parallel.
4. Mount Top Leand Top Right.
5. Mount Console (next page).
Please always make sure all proles are leveled in order to
make the top Frames touch each other with no gap.
Please select the suitable bolts, dowels and washers to aach the
frame to the wall according to wall properties (3-5 screws per part).
Boom Middle (1)