
Doc 151751465
Gared Holdings, LLC
9200 East 146
th
Street, Suite A
Noblesville, ndiana 46060
800-325-2682
MODEL NUMBER
151651461
NSTALLAT ON NSTRUCT ON CONT:
7. F LL THE HOLE W TH WATER AND SCRUB S DES AND BOTTOM W TH ST FF C RCULAR BRUSH, SUCH AS A BOTTLE
BRUSH. TH S STEP S CR T CAL!
8. REMOVE EXCESS WATER AND ANY LOOSE PART CLES W TH A RAG OR PAPER TOWEL. THE HOLE MUST BE CLEAN
AND UN FORMLY DAMP.
9. MEASURE ONE-PART WATER TO F VE PARTS CEMENT BY VOLUME (PROV DED) AND M X TOGETHER N CLEAN
CONTA NER. MEASURE WATER TO CEMENT RAT O AS ACCURATELY AS POSS BLE. M X SHOULD REACH A FLOWABLE
CONS STENCY.
10. NSERT THE CAP SCREW NTO THE FLOOR PLATE UNT L F NGER T GHT.
11. POUR CEMENT M XTURE NTO THE CLEANED DAMP
HOLE UNT L T S APPROX MATELY ¾ FULL.
12. WET THE KNURLED (ROUGH) SURFACE OF
THE FLOOR PLATE BODY W TH WATER,
DO NOT ALLOW WATER TO GET NTO
THE WORK NGS OF THE FLOOR
PLATE ASSEMBLY. NSERT THE FLOOR
PLATE ASSEMBLY NTO THE CEMENT
F LLED HOLE. PRESS DOWN ON
CAP SCREW UNT L THE TOP PLATE S
PROPERLY SEATED N THE COUNTERBORED
HOLE. EXCESS CEMENT SHOULD
FLOW OUT AROUND THE TOP OF THE
PLATE. F TH S DOES NOT HAPPEN, THE
FLOOR PLATE BODY SHOULD BE REMOVED,
MORE CEMENT ADDED, AND RE- NSERTED
NTO HOLE. SCRAPE THE EXCESS CEMENT
M XTURE W TH A PUTTY KN FE OR SCRAPER.
DO NOT ADD SAND, GRAVEL, OR OTHER FORE GN SUBSTANCES TO THE CEMENT, DO NG SO W LL WEAKEN THE
CEMENT.
DO NOT ADD TOO MUCH WATER, OR ATTEMPT TO “RE-TEMPER” CEMENT THAT HAS BEGUNTO CURE BY ADD NG
WATER. TH S W LL RESULT N FA LURE OF THE CEMENT TO ACH EVE PROPER STRENGTH.