
Step 6: For this step you’ll need both the large and small hex keys and the assembly we’ve been creating
At this point we can now tighten all the SHCS screws and bolts we’ve used to this point. It will be helpful to place this
assembly on the floor in the area you intend to use it so that you can get the unit as level as possible based on the specific
area you plan on using it. The important thing to remember here is that part D should set flat on the floor and touch as much
of the floor as possible. Additionally, you want each of the four legs to touch the floor. You can slightly adjust the assembly as
needed and tighten the various screws and bolts once you’ve got the assembly configured to set level on your floor. It might
also be helpful to have someone help you during this step, with one person adjusting the legs and stabilizer bar as the other
tightens the various SHCS screws and bolts. It may take several attempts to get it exactly how you’d like it depending on your
floor. If it isn’t perfect, you can always go back and make adjustments at anytime in the future. It might also be helpful to
revisit the previous steps to this point to recall all of the screws and bolts that need final tightening.
Step 7: For this step you’ll need the assembly we’ve created, and 2 part G (Bike Arm Bars), 2 part H (Plastic Cradles), 2
part I – Rubber insert for Bike Cradles
We are now ready to slide two of the bike arms on the part B uprights. For straight tube bikes, slant tube frames 19” or less,
and extraordinary frame configurations we suggest mounting part G so that the tube is to the inside of part B upright. For
extra large frames, slant tube frames over 19”, and most BMX frames we suggest mounting part G so that the tube is to the
outside of part B upright. See images below for clarification. Once you determine which way you’ll mount them, simply slide
one over the top of part B, at least 3 inches below the holes at the top of part B, and tighten the Knob to prevent part G from
falling all the way down part B. Repeat for other side. Add Part H by sliding on part G, then insert Part I into Part H.
ARMS TURNED TO INSIDE OF PART B ARMS TURNED TO OUTSIDE OF PART B
(Straight Tube bikes, Slant Frames 19” or smaller) (Extra Large Frames, Slant Frames over 19”, BMX)
Step 8: For this step you’ll need the assembly we’ve created, 1 part J (upright internal connector), part E (Logo connector
plate), 2 Short SHCS screws, and 2 cap nuts.
This step is easiest achieved by laying the assembly down on the floor. First, take part J and insert it into one of the part B
uprights as shown below making sure the holes are lined up. Next, we’ll position part E Next to part J and part B as shown in
the diagram. Finally, we’ll insert 1 cap nut into the bottom hole of B and into J, and we’ll then insert a small SHCS screw
through the bottom hole of part E, through part B, through part J and into the cap nut. Tighten with your hand for now. DO
NOT TIGHTEN ALL THE WAY YET – JUST SNUG. Repeat for hole above. Steps are indicated below: