
Thermometer
Settingup
heating
Operation
mode
switch
Pressuregauge
Reset
Central-heatingandhot-watermode
Hot-watermode
Off Service
function
Signallight
On
Signallight
Operation
Signallight
Breakdown
O
Settingsup
hot-water
temperature
Thecontrolcentreforcontrollingboileroperationisamodulationelectronicboard
equippedwithamicroprocessor.Sensorstateandvalueisscoredbysoftwarewhichalso
givesorderstoactiveelementsgasvalve,ignitionelectronics,circulationpump.Onthe
insidedistributionofheatingwateroutletthereisanemergencythermostat,pressureswitch
andpressuregaugesignallingthepressureintheheatingpiping.
Inthecasethetemperatureofoutgoingheatingwaterovercomes95°C,theemergency
thermostatputstheboilerinemergencyconditionfollowingbyputtingitoutofoperation.
Inthecasethepressureintheheatingsystemfallsunder1bar,thepressureswitchputsthe
boileroutofoperation.Ininsidedistributionofheatingwaterinletthereisa3-bar-safety
valveandacirculationpump.Inthebridgingofhotwaterinletandheatingwaterinlet
thereisaballvalveservingforfillingtheheatingsystemfromthedistributionnet.Inthe
rearpartoftheboilerthereisan8-literexpansiontankconnectedwiththepump.Outside
caseistreatedwithdustpaintwiththermalenduranceupto180°C.
Thethermometerandpressuregaugetakethetemperatureandpressureintheheating
system.Withabuttonforsettingtheheatingtemperature,ausercansetthetemperatureof
waterintheheatingsystemintherangeof35-85°C.Therecommendedrangeis55-
85°C.Withacontrolbuttonforsettinguphot-watertemperature,ausercansetrequested
outlettemperatureofhotwaterintherangeof35-60°C.Signallightsignalsa
condition,whentheelectronicsdidnotmanagetoburntheboiler(e.g.becauseofgas
deliveryfailure).Returntooperationconditioncanbemadebybriefturningtheoperation
modeswitchintotherightextremeposition(reset)whencontrollingtheboileroperation.
Thesignallightsignalsburningoftheboiler.Thesignallightservesto
signallingofstartingtheboilermode.Theoperationmodeswitchhasthesepositions:
–theboileroff
–summeroperation(hot-waterpreparationon,heatingoff)
–winteroperation(hotwaterandheatingon)
–unblockingtheboilerbreakdown(reset)
Controlfrontboardoftheboiler
Breakdown
OperationOn
–servicetestingfunction
Theheatingsystemmustincludeaproperfilter.Toutilizethemaximumoutputofthe
boileritisnecessarytoensureminimumpressureintheheatingsystemof1barforright
functioningandlonglifetime.Abuiltinexpansiontankenablesconnectingtheboilerto
closedheatingsystem. Theboileristooperateonnatural
gasof20mbarnominalpressureinthedistributionnet.Theboilerislocatedsoastoensure
necessaryoperatingconditionswhetheritisanappliancewithopencombustionchamber
(flue)orwithclosedcombustionchamber(turbo)andwithregardtothewaysof
combustionairsupplyandwastegasexhaust.
Theserviceoftheboilermustbecarriedoutbytherulesdescribedinthismanual.Except
serviceworks,theusermustnotcarryoutanyrepairsontheappliancenoradjustmentsor
dismountingandcleaningtheinsidepartsoftheboiler.Theboilercanbeoperatedonlyby
anadult.Afterleavinghomeinwinter(onholiday...)asupervisionbyatrainedpersonis
needed.Ifthereisadangerofapproachofinflammable(combustible)gasesorfumestothe
boiler(e.g.whenlyingaPVCflooring),itmustbeputoutofactionearly.Theuseris
obligedtotakecareofproperuseoftheboileraccordingtothisinstructionwhichisalsoa
conditiontoacknowledgeguarantee.Whenputtingtheboilertooperation,theservice
workermustinstructtheuseraboutboileroperating.
Fast-heatingwallboilersATTACKNST,NSKareequippedwithcopperheat-exchangers
protectedonsurfacewithsiliconecoatingonthebaseofaluminium,resistentto430°C.
Theseareexchangerswithseparatedsystemstowarmuphotwaterandheatingwater.A
bigadventageofthisexchangerisplaceandweightsaving.Maximumoperationpressure
forheatingcircleis300kPa(3bar)by85°C,forhot-watercircle600kPa(6bar)by60°C.
Minimumoperationpressureis100kPa(1bar).Theheat-exchangerislocatedintheupper
partofcombustionchamberandisfittedwithanautomaticdeareatingvalve,whichleads
overclosingchamber.Forminimumlosesduringheattransmissionitisnecessarytokeep
thesurfaceofheat-exchangerlamellasclean.
Thesourceofheatisagasburnerofmodernunit-builtdesignmadefromstainlesssteel.It
islocatedinthebottompartofcombustionchamber.Therearetwoelectrodesintheburner.
Oneofthemisasparkingitionelectrode,anotherisainonizationprobeforburning
control.Combustionchamberismadefromaluminium-coatedsteelplatewithinside
thermalinsulation.Overthecombustionchamber(NST)isawaste-gascollectorwithafan
forwaste-gasdraw.Withthehelpofsiliconetubesisthefanconnectedtoaswitchof
differentialpressure(manostat).Intheflueversion(NSK)thereisadrawbreakerwitha
waste-gasthermostat.Intheupperpartoftheexchangertherearethermalprobesfor
heatingandhot-watersystem.Theinsidewaterpipingintheboilerismadefromcopper
pipes.Closingchamberoftheboiler(NST)ismadefromaluminium-coatedsteelplate.
Openingsintheclosingchamberaresealedwithsiliconeseal.Onhotwaterinletthereisa
water-passagesensorinstalled.Fast-heatingwallboilersATTACKNSTandNSKare
equippedwithautomaticsandcontinuousregulationofoutput.
Onhot-waterinlettotheboileritisnecessarytoinstalla
magneticorelectromagneticwatertreatmentdevice.
Theuserwithhisorhersignature
intheletterofguaranteeconfirmshavingbeeninstructedwiththeboileroperating.
Conditionsofservice:
Technicaldescription