GOALRILLA B4800W User manual

A S S E M B L Y I N S T R U C T I O N S
MODEL NO.
B4800W
7 2 ” B A C K B O A R D , F I X E D H E I G H T
B A S K E T B A L L S Y S T E M
2023 Escalade Sports
2L-7987-01
Contact Escalade® Sports customer service department at:
Phone: 1-888-USA-GOAL Toll-Free!
Fax: 1-866-873-3536 Toll-Free!
E-mail: [email protected]
Please Do Not Return This
Product to the Store!
INSTALLATION ONLY!
PROFESSIONAL

P R E - A S S E M B L Y T I P S
P R E - A S S E M B L Y T I P S
1. Read this manual carefully before starting assembly. Read each step completely before beginning each step.
2. Some smaller parts may be shipped inside larger parts. Check inside all parts and cartons before assembling or ordering
parts.
3. To make assembly easier, use the Parts List and Hardware Identifier on pages 4, 5, 6, & 7 to identify and sort all
components. Check all cartons for kits. All hardware may not be located in one kit.
4. Do not tighten hardware until instructed to do so. If hardware is tightened too soon, mounting holes may not align and
parts may not easily fit together. Leave locknuts slightly loose until you are instructed to tighten them.
5. An electric screwdriver is helpful in assembly. However, please set at low torque and use caution because you could
overtighten the hardware and strip the screws.
6. Save these instructions and your proof of purchase (receipt) in the event that the manufacturer has to be contacted for
replacement parts.
2
Contact Escalade Sports customer service department at:
Phone: Toll – Free !
E-mail: basketball@escaladesports.com
1-800-467-1421
Please Do Not Return This Product To The Store!
®
Escalade Sports
817 Maxwell Ave.
Evansville, 47711IN
Physical Location:
PO Box 889
Evansville, 47706 IN
Mailing Address: (Correspondence Only)
1 - 15/16" open end wrench
1 - 15/16” socket and ratchet
1 - 9/16” Deep Well Socket & Ratchet
1 - 3/4” Socket & Ratchet
1 - 3/4” Open end Wrench
Tools required for assembly:
1 - Level
1 - Tape Measure
1 - Phillips Screwdriver
1 - 3/8” Drive Ratchet
1 - 1/2” Drive Torque Wrench
min 75ft/lbs
1 - 1/2” Drive Ratchet
Please visit our Website at:
www.Goalrilla.com
ON-LINE TROUBLE SHOOTING TECHNICAL ASSISTANCE
PRODUCT REGISTRATION FREQUENTLY ASKED QUESTIONS
ADDITIONAL GOALRILLA PRODUCT INFORMATION
1 - Needle Nose Pliers
7/32” Hex Key

3
If using a ladder during assembly, use extreme caution.
4 people are recommended for this operation.
Backboard installation must be performed by a professional with capable lifting equipment.
Seat the pole sections properly (if applicable). Failure to do so could allow the pole sections to
separate during play.
Before digging contact utility company to locate underground power cables, gas and water lines.
Ensure there are no overhead power lines within 20 ft. (7m) radius of pole location.
Climate, corrosion or misuse could result in system failure.
If technical assistance is required, contact our Customer Service department located on the cover
page & page 2.

72” GLASS BACKBOARD
6A-7706-00
(QTY. 1)
P A R T S L I S T ( N O T A C T U A L S I Z E )
4
(QTY. 1)
2
3
6
4
5
1A-8028-00
UPPER BOARD ARM - LEFT
UPPER BOARD ARM - RIGHT
1A-8027-00
(QTY. 1)
LOWER BASE POLE
1A-8025-00
(QTY. 1)
UPPER BASE POLE
1A-8026-00
(QTY. 1)
BOARD ARM CAP
3M-9465-00
(QTY. 1)
Warning label on the
backside of pole
NOTICE
Do Not remove
Protective Film
DO NOT REMOVE THE PROTECTIVE FILM
ON THE UPPER BASE POLE UNTIL
INSTALLATION IS COMPLETE.
6A-9165-00
(QTY. 1)
72” STEEL PERFORATED
BACKBOARD
1
1
OR
2S-9529-00
QTY. 1
27
SPACER

A C C E S S O R I E S ( N O T A C T U A L S I Z E )
5
UNIVERSAL POLE PAD
3M-8926-00
(QTY. 1)
R I M A S S E M B L Y K I T I D E N T I F I E R
7
12
13
(QTY. 1)
(QTY. 1)
BREAKAWAY RIM ASSEMBLY
6A-7825-00
NET
3F-6010-00
(QTY. 1)
RIM COVER PLATE
2S-9467-00
(QTY. 1)
2M-6915-00
24
14
P A R T S L I S T ( N O T A C T U A L S I Z E )
3/8-16 X 1 3/4" CARRIAGE BOLT
1B-6782-10
15
(QTY. 4)
16
3/8 X 19MM FLAT WASHER
2B-6289-10
(QTY. 4)
3/8-16 NYLOCK LOCKNUT
2B-6238-10
(QTY. 4)
I N C L U D E D H A R D W A R E ( A C T U A L S I Z E )
11
17
9
8
10
BOARD PAD LEFT
3M-8904-00
(QTY. 1)
BOARD PAD CENTER
3M-8907-00
(QTY. 1)
BOARD PAD RIGHT
3M-8905-00
(QTY.1)
NET CABLE
(QTY. 2)
38
SET SCREW
1B-7266-00
7B-8579-00
(QTY. 1)
2.5 MM HEX KEY
39
#8 X 1/2" THREAD CUTTING SCREW
1B-6238-01
(QTY. 4)
18
USED TOGETHER

H A R D W A R E I D E N T I F I E R ( A C T U A L S I Z E )
STEP BUSHING
7B-6391-01
1/2" FLAT WASHER
2B-6093-10
1/2-13 NYLOCK LOCKNUT
2B-6095-10
28
24
26
(QTY. 8)
(QTY. 2)
(QTY. 4)
6
19
1/2-13 X 7 3/4" HEX HEAD BOLT
1B-7133-00
(QTY. 2)
(QTY. 2)
22
(For Arm Assembly)
3/8-16 x 1” Button Head
Screw - Zinc
1B-7221-00
(QTY. 2)
23
1/2-13 X 1.75 Hex Head Bolt
XYLAN GR5 Black
1B-6944-10
(QTY. 2)
20
37
#10 X 1.75 SELF DRILLING /
SSELF TAPPING SCREW
1B-6969-00
(QTY. 8)
36
#10-32 x 3/4 THREAD
CUTTING SCREWS
1B-7271-00
(QTY. 4)
1/2-13 X 1.5 Hex Head Bolt - Zinc
1B-6486-10
2S-9526-00
(QTY. 2)
21
Counter Sunk Threaded Washer 1/2”-13
NOTE: There will be
leftover, unused
hardware in the hardware
pack once assembly is
complete, discard leftover
hardware.

A N C H O R K I T H A R D W A R E I D E N T I F I E R ( A C T U A L S I Z E )
5/8" FLAT WASHER
2B-6098-03
(QTY. 8)
*Hardware located in Anchor kit box
(#29, #30, #31, #32)
32
31
29 30
5/8"-11 HEX NUT
2B-6097-02
(QTY. 12)
5/8" SPLIT LOCK
WASHER
2B-6099-02
(QTY. 4)
5/8" THREAD
PROTECTOR
PLASTIC CAP
3M-9040-00
(QTY. 4)
7
*Parts located in Anchor kit box (#33, #34 #35)
P A R T S L I S T ( N O T A C T U A L S I Z E )
ANCHOR PLATE
2S-6494-00
(QTY. 1)
5/8"-11 X 18 “J” BOLT
(QTY. 4)
#3 X 40” REBAR
1S-6152-00
(QTY. 4)
2B-6096-00
34
33
35

Before digging for the ground anchor,
contact your local One-Call system
(dial 811) in your area.
Utility Markings
Color Definition
Red Electric
Yellow Gas, Oil, Petroleum
Orange Communication, Phone, TV
Blue Potable Water, Irrigation
Green/Brown Sewer
White Proposed Dig
CAUTION
1-888-258-0808
INSTALLATION TIMELINE
1. Prior to anchor system and goal assembly, call utility services (811) for location of underground utility lines before you dig.
2. Vertical main post assembly is a two part process.
ANCHOR SYSTEM INSTALLATION INSTRUCTIONS (Day 1)
PART 1
Day 1. Complete Anchor System Installation Instructions.
(Below)
Day 2-4. Allow concrete to cure.
PART 2
Day 5. Complete GoalrillaTM assembly instructions. (Requires
four adults)
Figure 2
2.
1.
Note: For best results with less vibration, anchor system
should be independent of court. If pouring concrete for
both at same time, add an expansion joint in between.
THESE NUTS
USED FOR
LEVELING
Note: When digging hole, if you hit rock
and cannot dig through contact a contractor.
Items needed for Anchor Installation (not included)
11 - 80 lb. bags of concrete (2-3 extra recommended)
1 - post hole digger (optional)
1 - 15/16” open end wrench
1 - 15/16” socket and ratchet (optional)
1 - wheel barrow
1 - garden hose
1 - level
1 - tape measure
1 - concrete form (see note after step 2)
8
34
29
29
33
OVERHANG
Before digging hole for anchor system, check for
buried power, gas, water, and telecommunication
lines! Failure to do so could result in serious or fatal
injury! Contact your local utility company if unsure.
DANGER
Assemble anchor system as follows: Thread
nuts (#29) to the bottom of threads of 4 J Bolts
(#34). Insert threads of J Bolts (#34) up
through holes on the anchor plate (#33) and
secure with nuts (#29). See Figure 2.
Note: Each leg of J Bolts should face the
anchor bolt to the right. See Detail A.
J-BOLTS
#34
Figure 1
Determine the desired location of the
backboard over the playing court. From that
location, use the overhang distance of 60” (5ft)
to determine the correct location of the anchor
system. See Figure 1.

9
ANCHOR SYSTEM INSTALLATION INSTRUCTIONS (Day 1)
NOTE: Failure to dig and fill the hole as instructed will result in increased system vibration.
3.
6.
NOTE: Using a concrete form for the top 4" of the concrete is recommended. Cardboard
forms can be purchased at some hardware and home stores or a wooden form can be
constructed out of 2 x 4's.
*Tip: It is always a good idea to purchase one or two extra bags of concrete, just in case
you need them. If extra bags are not used you can return them to the store.
4.
5.
Mix and pour concrete into the hole. Follow instructions on the concrete bag. Stop about 18" below court level.
Insert four pieces Rebar (#35) into concrete 8" apart creating a square in the center of the hole.
Place the concrete form in the desired location and finish pouring concrete up to and even with the court level.
Push anchor system into concrete and agitate to work out voids in concrete. Immediately use a level to level the
anchor plate and then square the anchor plate to the playing surface. Clean off any concrete that may be on
exposed threads.
NOTE: The bottom four nuts will be forever embedded
in concrete. The top four nuts remain on bolts and are
used for leveling. (See Step 1 on page10)
Let concrete cure for a MINIMUM of 72 hours.
Figure 3
35
Court Level
IMPORTANT
The top surface of the concrete
should be level with the
playing surface (Court) to make
sure the hoop is at 10' once
installation is complete.
Concrete
IMPORTANT
IMPORTANT

Let concrete cure for a
MINIMUM of 72 hours
before installing pole.
(Bottom Nut)
29
30
31
31
29
5/8" FLAT WASHER, BLACK
2B-6098-03
(QTY. 8)
*Hardware located in Anchor kit box
31
29 30
5/8"-11 HEX NUT, BLACK
2B-6097-02
(QTY. 4)
5/8" SPLIT LOCK
WASHER, BLACK
2B-6099-02
(QTY. 4)
HARDWARE NEEDED (ACTUAL SIZE) TOOLS NEEDED
15/16”
OR
15/16”
Level
1. Lift the lower pole (#2) and place it onto the anchor system and
secure it with the hardware as shown. Tighten the Fasteners
finger tight, and leave them loose enough to level the pole.
Place a level on the pole and adjust the bottom nuts (#29) until
the pole is level (left to right and front to back). Tighten the top
four hex nuts (#29) tight. Recheck the pole, front/back and
side/side, to make sure the pole is level. Adjust the bottom nuts
(#29) as required. Tighten tight when complete.
10
PLACING THE POST ON THE ANCHOR SYSTEM
REQUIRES AT LEAST THREE CAPABLE ADULTS.
POLE WILL WANT TO LEAN WHILE ATTEMPTING TO
STAND IT UP ON J BOLTS.
WARNING
DO NOT REMOVE BOTTOM NUTS #29 THAT
YOU INSTALLED IN STEP 2 (PAGE 8).
NOTICE
2
NOTE: Warning label on
lower base pole should face
away from playing court.
PLAYING COURT
GOALRILLA ASSEMBLY INSTRUCTIONS (Day 5)
Use 15/16” open
end wrench to
adjust / tighten
15/16” socket or
Box end wrench
Leveling
Nuts
DO not place
thread protectors
yet. Those will be
attached at the
end.
DO NOT ADD THE THREAD PROTECTOR CAPS
(#32) UNTIL INSTRUCTED ON PAGE 24.
NOTICE

3
23
22 21
Do Not remove
Protective Film
All surfaces flush
and holes aligned.
27
HARDWARE NEEDED (ACTUAL SIZE)
3. With the help of another adult, place the
Upper Base Pole (#3) on top of the
Lower Pole (#2). Install Counter Sunk
Washer/Bolt assembly (step 2.) as
shown in Detail B. Tighten bolts,snug.
11
5.
Tighten Top Bolts (#22) to 75FT-lbs with a
torque wrench and 3/4” socket. Tighten
bottom Bolts (#23) tight.
22
3/8-16 x 1” Button
Head Screw - Zinc
1B-7221-00
(QTY. 2)
TOOLS NEEDED
1/2” Drive Torque
Wrench with 3/4”
Socket
23
1/2-13 X 1.5 Hex
Head Bolt - Zinc
(QTY. 2)
1B-6486-10
4. Install the bottom bolts (#23) loosely. Place
Spacer (#27) between Upper Base Pole (#3)
and Lower Pole (#2). Flange on Spacer should
point downward. Push the flange tight against
the edge of the plate, as shown in Detail C.
Counter Sunk Threaded
Washer 1/2”-13
2S-9526-00
(QTY. 2)
21
2
DETAIL A
22
21
2. Screw the Counter Sunk
Washers (#21) onto the Bolts
(#22) as shown in Detail A.
DETAIL B
23
27
DETAIL C
7/32” Hex Key
FIGURE 1
3
2
&
2
3

HARDWARE NEEDED (ACTUAL SIZE)
6. Install Board Arm Cap (#4) onto the Upper Base Pole
(#3) using screws (#36) as shown in Detail A.
#10-32 X 3/4 Thread
Cutting Screws
1B-7271-00
(QTY. 4)
36
TOOLS NEEDED
Phillips
Use pre-drilled
holes.
DETAIL A
4
36
Phillips
Screwdriver
required
4
Do Not remove
Protective Film
3
DO NOT REMOVE THE PROTECTIVE FILM ON THE
UPPER BASE POLE UNTIL INSTALLATION IS COMPLETE.
NOTICE
12

113-7/8”
7. Using the Leveling nuts, adjust the system so the bottom inside
surface of the upper base pole is 113 7/8" from the playing surface.
See Detail A & Detail B.
NOTE: Place the tape
measure tab on the top
inside face of the upper
base arm as shown.
DETAIL A
NOTE: Adjust the nuts
but DO NOT remove
the upper Nuts!
Leveling Nuts
DETAIL B
13
PLAYING SURFACE
NOTE: Adjustments to the front
leveling nut will have the largest
influence on achieving the 113 7/8”
measurement.

14
DETAIL A
6
5
8. Attach Right Arm (#5) & Left Arm (#6) as shown in Detail A.
Hand tighten the Locknuts only. You will be instructed to
tighten the Locknuts in a later step.
24 26
19
24
3
5
6
DO NOT REMOVE THE PROTECTIVE FILM ON THE
UPPER BASE POLE UNTIL INSTALLATION IS COMPLETE.
NOTICE
Do Not remove
Protective Film
Do Not remove
Protective Film
Important: Water
drain holes MUST be
on the bottom side.
Drain holes
this direction

add arrows on b and c
15
fix widest opening
take Nylon out- keep it
as net cable.
PG 12
if you are hvain
diffuiculty used a
pair of neede nose
plyes pull it out and
DO NOT DELETE UNTIL RIM
PORTION IS COMPLETE.
CLAY WILL SEND MORE
INFO.
Attaching metal net cable to the rim.
DETAIL B
1. Place the Rim on a Non-Abrasive table upside down and
locate the small cable tubes. See Figure 1 & Detail A.
2. Insert the net cable through the first cable tube. See
Detail A.
FIGURE 1
11
3. Hold on to the end of the net cable then pull out until there’s
a couple of inches of slack. See Detail B & Detail C.
NOTE: Using needle nose pliers is recommended to
make it easier to hold and pull the net cable through
the small metal tubes but it is not required.
DETAIL A
Small
Cable Tube Net Cable
DETAIL C
14
Needle Nose
Pliers
Start here
DO NOT
Start here
2 inches of
slack

overlapping the existing
cable in the tube
Both ends of the cable should at the
widest opening on the rim tubes
2. Insert the Nylon net cable into the first cable tube located at the
widest opening on the rim and insert the cable in the cable tube.
Work your way up counter clockwise. See Detail A and Figure 1.
.
Starting
cable end
16
Attaching net to the rim.
4. Pick a loop on the nylon rim net and put it through the
net cable as shown in Detail A & Detail B.
5. Slowly pull the net cable back until there is no slack, but
make sure the net loop does not slip off. Then, insert and
push the cable into the next cable tube. See Detail C.
FIGURE 2
11
DETAIL C
DETAIL B
Net Loop
DETAIL A
Net Loop
Cable Tube
Small
Cable Tube
Note: Make sure there are no twists in net loops.

Tighten the Set Screws
NOTE: Using needle nose pliers is recommended to
make it easier to hold and pull the net cable through
the small metal tubes but it is not required.
6. Repeat steps 1-5 until all the net loops are through
the net cable and the net cable is through all the
cable tubes. See Figure 3 & Detail A.
FIGURE 3
7. Insert the set screws (#38) into the threaded holes in the
small cable tubes and tighten tight using the Allen key
(#39). See Detail B.
17
39
DETAIL B
38
38
DETAIL A
Cable Tube
Small
Cable Tube
Small
Cable Tube

DETAIL A
8. Insert the top Carriage Bolts (#15) into the
carriage bolt holes located at the top back of
the rim. See Figure 4.
9. Slide the Carriage Bolts (#15) outward into the
slots as shown below. Carriage Bolts should stay in
place to aid installation on the next step. See
Detail A.
15
FIGURE 4
Inserting top Carriage Bolts to top rim slots.
15
18

16 17
NOTE: NET NOT SHOWN
FOR CLARITY.
11
15
15
19
Mounting Goal Assembly to the backboard.
3. Insert the two bottom carriage bolts and attach
washers (#16) and nuts (#17).
NEVER USE RIM WITH
COVER PLATE REMOVED!
NOTE: Tighten top nuts (#17) but leave loose
enough to level Rim in a later step.
Bottom
Carriage Bolts
NOTE: Tighten bottom nuts (#17) but leave loose
enough to level Rim in a later step.
Open lid of box containing backboard (#1).
With the help of another capable adult rotate
the backboard upright to a vertical position.
Note: Do not take Backboard out of the box.
Use the cardboard box under backboard to
protect backboard paint from scratches.
While one capable person holds the backboard, have a
second person attach the rim up to the backboard with
the top Carriage Bolts (#15) installed in the previous
step and slide them into the holes in backboard as
shown in Detail A. While still holding the rim up from
the front reach around behind the rim and attach the
Washers (#16) and Nuts (#17) as shown in Detail A.
1.
2.
DETAIL A
15 16
17
Top Carriage
Bolts
NEVER LOOSEN ANY NUTS OR BOLTS THAT HOLD THE BREAKAWAY
RIM SPRING IN PLACE! THESE ARE UNDER SPRING LOAD AND
COULD CAUSE DAMAGE TO PRODUCT/INJURY TO USER.
9/16”
TOOLS NEEDED
Level
Helpful Hint: Carefully place the Backboard
horizontally on 2 Heavy Duty saw-horses, Glass side
up to attach the rim and then jump ahead to page 25
and attach backboard pads per instructions.
Optional to Steps 2 and 3.

With at least 4 capable adults raise the
basketball hoop up and have one person
attach the nuts to secure the basketball
system in place.
HARDWARE NEEDED (ACTUAL SIZE)
1/2-13 NYLOCK LOCKNUT
2B-6095-10
26
(QTY. 3)
19
1/2-13 X 7 3/4" HEX BOLT
1B-7133-00
(QTY. 1)
3/4”
TOOLS NEEDED
3/4”
Before proceeding to the next step have the hardware and tools ready along with professional
equipment. Read the next page completely and understand it before beginning the next step.
ASSEMBLY TIP
20
STEP BUSHING
7B-6391-01
28
(QTY. 2)
1/2" FLAT WASHER
2B-6093-10
24
(QTY. 6)
IT IS RECOMMENDED THAT THE FOLLOWING STEPS ARE DONE BY A PROFESSIONAL WITH CAPABLE
EQUIPMENT. PLEASE TAKE PROPER SAFETY MEASURES WHEN ATTACHING THE BACKBOARD TO UPPER ARM.
Table of contents
Other GOALRILLA Sport & Outdoor manuals