manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Grundfos
  6. •
  7. Rack & Stand
  8. •
  9. Grundfos OD 401 User manual

Grundfos OD 401 User manual

Other manuals for OD 401

1

Popular Rack & Stand manuals by other brands

Dynex DX-MP3MT Quick setup guide

Dynex

Dynex DX-MP3MT Quick setup guide

Konig & Meyer 24185 manual

Konig & Meyer

Konig & Meyer 24185 manual

ECG LD 326501 instruction manual

ECG

ECG LD 326501 instruction manual

Philips SB7S19S/00 quick start guide

Philips

Philips SB7S19S/00 quick start guide

Woodline KIT-250 lb instructions

Woodline

Woodline KIT-250 lb instructions

ricoo S1222 installation instructions

ricoo

ricoo S1222 installation instructions

Kanto P301 user manual

Kanto

Kanto P301 user manual

VidaBox VB MNT FFS2 installation guide

VidaBox

VidaBox VB MNT FFS2 installation guide

PROEL PLWIN60C user manual

PROEL

PROEL PLWIN60C user manual

AllMounts PLB-43S instruction manual

AllMounts

AllMounts PLB-43S instruction manual

VMP VH-001 instruction sheet

VMP

VMP VH-001 instruction sheet

Nederman SYSTEM 920/400 instruction manual

Nederman

Nederman SYSTEM 920/400 instruction manual

Glasdon ORBIS POST MOUNTING KIT installation guide

Glasdon

Glasdon ORBIS POST MOUNTING KIT installation guide

Songmics LGR105 manual

Songmics

Songmics LGR105 manual

Grape GM401 user manual

Grape

Grape GM401 user manual

FourStarGroup 11225296 manual

FourStarGroup

FourStarGroup 11225296 manual

CHIEF FLR100 installation instructions

CHIEF

CHIEF FLR100 installation instructions

FEC XDCAM EX PMW-EX30 manual

FEC

FEC XDCAM EX PMW-EX30 manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

Wall mounting kit
OD 401 accessory
GRUNDFOS INSTRUCTIONS
Installation and operating instructions
2
3
Wall mounting kit
OD 401 accessory
Installation and operating instructions 4
Montage- und Betriebsanleitung 8
Notice d'installation et d'entretien 12
Istruzioni di installazione e funzionamento 16
Instrucciones de instalación y funcionamiento 20
Instruções de instalação e funcionamento 24
Οδηγίες εγκατάστασης και λειτουργίας 28
Installatie- en bedieningsinstructies 32
Monterings- och driftsinstruktion 36
Asennus- ja käyttöohjeet 40
Monterings- og driftsinstruktion 44
Instrukcja montażu i eksploatacji 48
Руководство по монтажу иэксплуатации 52
Szerelési és üzemeltetési utasítás 56
4
CONTENTS Page
1. Applications 4
1.1 Mounting kit 5
2. Mounting 6
3. Disposal 7
1. Applications
This mounting kit is used for mounting the OD 401
operator display in a specially designed cabinet.
The mounting kit consists of
• 1 stainless steel frame,
• 1 IP 55 cabinet,
• 1 Pg cable gland and
• 8 screws.
The steel frame is available in two versions.
One for operation from the front or from below and
the other for operation from above.
Prior to installation, read these installation
and operating instructions. Installation and
operation must comply with local regula-
tions and accepted codes of good prac-
tice.
5
1.1 Mounting kit
TM02 7149 2703
• Steel frame for mounting the OD 401 operator display.
• The OD 401 can be mounted for operation from the front
or from below with a tilt angle of 12°.
TM02 7150 2703
• Steel frame for mounting the OD 401 operator display.
• The OD 401 can be mounted for operation from above.
TM02 7153 2703
• IP 55 cabinet with cable gland.
• Fasten the OD 401 with the four TORX screws,
type M5 x 40 PH-FZB.
TM02 7154/55 2703
• Hexagon socket head screws, type M4 x 6 US-A4
(pos. 1).
• TORX screws, type M5 x 40 PH-FZB (pos. 2).
12
6
2. Mounting
TM02 7186 2703
Mounting of operator display in IP 55
cabinet
• Fit the cable gland in the bottom of the
IP 55 cabinet.
• Insert the cable through the cable gland and
tighten the nut.
• Connect the wires to the five terminals of
the plug on the back of the operator display.
• Insert the plug into the operator display.
TM02 6976 0303
• Assemble the operator display and the
IP 55 cabinet with the four TORX screws,
type M5 x 40 PH-FZB.
Note: To meet the enclosure class IP 55, the
cable gland must be fitted correctly and the
screws must be tightened until the gasket is
deformed.
• The operator display can now be fitted in
three different angles, depending on the
selected steel frame.
TM02 6333 0303
Operated from the front – vertical
• Fasten the stainless steel frame to the wall
or a similar solid surface.
• Fasten the frame with three screws (pos. 3).
The three holes on the back of the frame lie
on a circle with a diameter of 170 mm.
Note: The frame can be adjusted as the three
holes are oval.
• Assemble the operator display and the
stainless steel frame with the four hexagon
socket head screws, type M4 x 6 US-A4
(pos. 2).
170
ø
3
2
7
3. Disposal
This product or parts of it must be disposed of in an
environmentally sound way:
1. Use the public or private waste collection service.
2. If this is not possible, contact the nearest
Grundfos company or service workshop.
TM02 6393 0303
Operated from below – tilt angle 12°
• Fasten the stainless steel frame to the wall
or a similar solid surface.
• Fasten the frame with three screws (pos. 3).
The three holes on the back of the frame lie
on a circle with a diameter of 170 mm.
Note: The frame can be adjusted as the three
holes are oval.
• Assemble the operator display and the
stainless steel frame with the four hexagon
socket head screws, type M4 x 6 US-A4
(pos. 2).
TM02 6334 0303
Operated from above – tilt angle 12°
• Fasten the stainless steel frame to the wall
or a similar solid surface.
• Fasten the frame with three screws (pos. 3).
The three holes on the back of the frame lie
on a circle with a diameter of 170 mm.
Note: The frame can be adjusted as the three
holes are oval.
• Assemble the operator display and the
stainless steel frame with the four hexagon
socket head screws, type M4 x 6 US-A4
(pos. 2).
170
ø
3
2
170
ø
3
2
Subject to alterations.
60
61
62