ENGLISH 17
SAFETY ------------------------------------------------------------------------------------------------------------------------------------
Please note the following instruc-
tions when using the appliance:
7Do not use the appliance if you
suffer from a heart condition,
eczema or any other skin
complaints.
7Only use the appliance if one of
the two steam masks is attached.
7The appliance is designed for
domestic use only.
7Follow these instructions to pre-
vent damaging the appliance or
danger arising from improper
use. Keep them in a safe place.
7Never use the appliance in the
bath, shower or over a wash
basin filled with water; nor
should it be operated with wet
hands.
7Do not immerse the appliance in
water.
7Do not drop the appliance.
7Always pull out the plug before
filling the appliance with water
and after using it.
7Never use the appliance for
longer than 30 minutes.
7When using the appliance, make
sure the steam is not directed at
the eyes or any other places
sensitive to heat. Always keep
your eyes closed.
7When using the appliance, al-
ways make sure you keep a suf-
ficient distance from the steam
pouring out.
7Relax your face and keep it
directed towards the steam
pouring out.
7Do not remove any accessories
while using the appliance.
This could result in burns.
7Keep the appliance out of the
reach of children.
7If not already present, for addi-
tional protection we recommend
installing a residual-current-oper-
ated protective device (RCD)
with a rated residual operating
current not exceeding 30 mA in
the electrical circuit of your bath-
room. Ask your electrician for
advice.