
HC SERIES GENERAL SPECIFICATIONS
H2O BOILER HC SERIES IOM Manual
Table of Contents
HC SERIES GENERAL SPECIFICATIONS................................................................................................................vii
HC SERIES GENERAL LAYOUT & DIMENSIONS.................................................................................................viii
SECTION 1: INTRODUCTION...................................................................................................................................... 1
1.1 Boiler/Water Heater Heat Exchanger.............................................................................................................. 2
1.2 Control System................................................................................................................................................ 3
1.3 Safety Features................................................................................................................................................ 3
1.4 Gas Lines ........................................................................................................................................................ 5
1.4.1 Pilot Gas Line............................................................................................................................................. 5
1.4.2 Main Gas Line ............................................................................................................................................ 5
1.4.3 Gas Manifold and Control Assembly Tests................................................................................................ 6
1.4.4 Code Compliance ....................................................................................................................................... 6
1.5 Freeze Protection and Storage......................................................................................................................... 7
1.6 Water Treatment ............................................................................................................................................. 7
SECTION 2: INSTALLATION....................................................................................................................................... 8
2.1 Water Heater/ Boiler Package......................................................................................................................... 9
2.2 Removal of Existing Boiler........................................................................................................................... 10
2.3 Clearance from Combustible Material.......................................................................................................... 11
2.4 Location ........................................................................................................................................................ 12
2.5 Relief Valve piping....................................................................................................................................... 13
2.6 Water Connection ......................................................................................................................................... 13
2.6.1 Potable water heater connection ............................................................................................................... 14
2.6.2 Piping Arrangement............................................................................................................................... 14
2.7 Condensate Line............................................................................................................................................ 17
2.8 Gas Line Connections................................................................................................................................... 17
2.9 Electrical connection..................................................................................................................................... 18
2.10 Vent Connection ........................................................................................................................................... 18
2.10.1 Suggested Single wall Vent system...................................................................................................... 19
2.10.2 Vent Sizing........................................................................................................................................... 22
2.11 General Instructions...................................................................................................................................... 23
SECTION 3: OPERATION ........................................................................................................................................... 25
3.1 Sequence of Operation.................................................................................................................................. 26
3.1.1 Safety Loop .............................................................................................................................................. 26
3.1.2 Pre-Purge.................................................................................................................................................. 26
3.1.3 Pilot Flame................................................................................................................................................ 27
3.1.4 Main Flame............................................................................................................................................... 27
3.1.5 Continuous Operation............................................................................................................................... 28
3.2 PRE-COMMISSIONING ............................................................................................................................. 29
3.3 Commissioning ............................................................................................................................................. 30
3.4 Boiler Capacity and recovery rate................................................................................................................. 31