
3.4 Installing the Equipment.................................................................................................................................................... 38
3.4.1 Checking the Nitrogen Pressure................................................................................................................................... 38
3.4.2 Exhausting Nitrogen......................................................................................................................................................... 40
3.4.3 Removing the Pallet......................................................................................................................................................... 42
3.4.4 Securing Equipment..........................................................................................................................................................42
3.4.5 Lowering a Fan (Applicable To Downow Units).................................................................................................. 43
3.5 Connecting Pipelines............................................................................................................................................................45
3.5.1 Cabinet Hole Positions.....................................................................................................................................................46
3.5.1.1 Holes in the Side Panel of an Upow Unit........................................................................................................... 46
3.5.1.2 Holes at the Bottom of a Downow Unit............................................................................................................. 46
3.5.2 Connecting the Chilled Water Pipe............................................................................................................................. 47
3.5.2.1 Upow............................................................................................................................................................................... 48
3.5.2.2 Downow......................................................................................................................................................................... 50
3.5.3 Connecting Water Pipes.................................................................................................................................................. 51
3.5.3.1 Connecting the Drainpipe........................................................................................................................................... 51
3.5.3.2 (Optional) Connecting the Water Inlet Pipe for the Wet Film Humidier................................................ 52
3.5.4 (Optional) Leakage Test with Nitrogen.....................................................................................................................53
3.5.5 Leakage Test with Water................................................................................................................................................ 54
3.6 Cable Connections................................................................................................................................................................ 55
3.6.1 Precautions.......................................................................................................................................................................... 55
3.6.2 Positions of Electric Ports............................................................................................................................................... 56
3.6.3 Connecting Power Cables............................................................................................................................................... 58
3.6.4 Connecting Signal Cables............................................................................................................................................... 60
3.6.5 Teamwork Networking and Monitoring.................................................................................................................... 62
3.6.5.1 Main Control Module................................................................................................................................................... 62
3.6.5.2 Connecting the Teamwork Network Cable........................................................................................................... 63
3.6.5.3 Connecting the Monitoring Network Cable..........................................................................................................63
3.6.6 (Optional) Connecting the Gravity Damper (Applicable To Upow Units)..................................................66
3.6.7 (Optional) Connecting the Motorized Damper (Applicable To Downow Units)......................................66
3.6.8 (Optional) Connecting the T/H Sensor Outside the Cabinet............................................................................. 66
3.6.9 (Optional) Connecting the Direct free-cooling plenum...................................................................................... 68
3.6.10 (Optional) Connecting a Dierential Pressure Sensor.......................................................................................69
3.6.10.1 (Optional) Connecting an Upow Dierential Pressure Sensor................................................................. 69
3.6.10.2 (Optional) Connecting a Downow Dierential Pressure Sensor..............................................................70
3.6.11 (Optional) Installing a Cap (Applicable to Upow Units)................................................................................72
3.7 Installation Verication.......................................................................................................................................................75
4 Commissioning.......................................................................................................................78
4.1 Preparing for Power-On......................................................................................................................................................78
4.2 Power-On................................................................................................................................................................................. 78
4.3 Home Screen.......................................................................................................................................................................... 85
4.4 Menu Structure...................................................................................................................................................................... 87
4.5 Initial Conguration............................................................................................................................................................. 88
NetCol8000-C(070, 130, 190) In-room Chilled Water
Smart Cooling Product
User Manual Contents
Issue 02 (2020-08-30) Copyright © Huawei Technologies Co., Ltd. v