idi 1000F Series Product manual

Installation and Maintenance Guide
Information for Installation and Users
IDI 1000F Series
Monitor Suspension System
Model IDI 1000F-1H WOR (without rails)

Installation and Maintenance Guide for IDI 1000F Series Suspension System Model
IDI 1000F-1H WOR
D000-1099 REV C 06-SEP-2018 Image Diagnostics, Inc. 2
The text of this manual was originally written, approved and published by the manufacturer in English.
The information in this manual is subject to change without notice.
CONTENTS
SECTION TITLE
A INTRODUCTION, PRODUCT DATA, AND OPERATION
B SYMBOLS
C GENERAL SAFETY
D SAFETY HAZARDS
E INSTALLATION
F CLEANING
G MAINTENANCE
H CUSTOMER SUPPORT
I DISPOSAL GUIDELINES
J APPROVALS

Installation and Maintenance Guide for IDI 1000F Series Suspension System Model
IDI 1000F-1H WOR
D000-1099 REV C 06-SEP-2018 Image Diagnostics, Inc. 3
A. INTRODUCTION
The IDI 1000F-1H Flat Panel Suspension System transports monitors used in
medical imaging procedures. The system features a counterbalanced arm with
vertical travel and internal cable routing.
PRODUCT DATA
Package Includes:
Mobile gantry and counterbalanced swing arm with 36" sweep radius, 20"
vertical travel and +180o rotation
Anodized aluminum ceiling rails with Easymount clip system
Flat panel array with +180o rotation
Complete installation package; meter box mount, all mounting hardware and
cable management components; brackets, covers and “flexhaust”hose
OPERATION
The monitor is moved along the overhead rails, positioned vertically, and
rotated manually using the handle.

Installation and Maintenance Guide for IDI 1000F Series Suspension System Model
IDI 1000F-1H WOR
D000-1099 REV C 06-SEP-2018 Image Diagnostics, Inc. 4
B. SYMBOLS
Attention, consult accompanying documents.
Failure to follow these instructions can cause accidents
resulting in serious injury to patient, user, and damage to
equipment.
Warning! Information or instructions shown near this symbol must be
adhered to in order to prevent a potentially hazardous situation which if not
avoided, could result in death, personal injury or damage to the equipment.
Caution, risk of electrical shock
Protective Ground
This is the common tie point between the AC monitor
cord grounds, frame ground, and service (main) ground.
Alternating Current
Weight Limit
Recycle
Some of the materials can be recycled rather than discarded.

Installation and Maintenance Guide for IDI 1000F Series Suspension System Model
IDI 1000F-1H WOR
D000-1099 REV C 06-SEP-2018 Image Diagnostics, Inc. 5
C. GENERAL SAFETY
Attention, consult accompanying documents.
Failure to follow these instructions can cause accidents
resulting in serious injury to patient, user, and damage to
equipment.
Only qualified persons may install, operate or maintain this equipment.
Installation of this unit must adhere to applicable codes and authorities having any jurisdiction
over this installation. The customer's architect or engineer is responsible for assuring that the
structural support plans comply with all applicable codes and regulations.
The unit should be used only in rooms that comply with state, federal and local recommendations
concerning electrical safety when used in medical installations. All electrical connections shall be done
by licensed/approved electrician per national electric codes.
CAUTION: •Always switch off mains before performing
nonelectrical tests or maintenance.
•Many positions exist where equipment or
patient collision may occur. Care must be
exercised during equipment positioning to
avoid a patient or equipment collision.
Changes and additions to the equipment may be performed only by an authorized representative. These
changes must conform to regulations and accepted standards of good practice. To prevent defeat of the
built-in safety mechanisms, changes must be submitted in writing to the manufacturer for review.
Use only parts specified by Image Diagnostics, Inc. when repairing or servicing this equipment.
D. SAFETY HAZARDS
Installers and Operators using this equipment should understand the safety issues and operating
instructions provided.
Comments and questions regarding safety should be addressed to:
Customer Support
Image Diagnostics, Inc.
310 AUTHORITY DRIVE
FITCHBURG, MA 01420
USA
Or call IDI at (978)829-0009 or send fax to (978)829-0027
Or call Toll Free at (877)304-5434

Installation and Maintenance Guide for IDI 1000F Series Suspension System Model
IDI 1000F-1H WOR
D000-1099 REV C 06-SEP-2018 Image Diagnostics, Inc. 6
SAFETY HAZARDS ALERTS
Alert Circumstances for use
DANGER Indicates an imminentlyhazardous situation which,
if not avoided, will result in death or serious injury.
WARNING Indicates a potentially hazardous situation which,
if not avoided, could result in death or serious injury.
CAUTION Indicates a potentially hazardous situation which,
if not avoided, may result in minor or moderate injury
or equipment damage.
E. INSTALLATION
UNPACK
No special handling is required for unpacking this equipment at the site.
Conventional shipping materials are used.
Recycle or disposal of shipping material per local regulations
END-LOAD GANTRY
1. Remove packing material from carriage. Using Hi-Jack or other suitable lift table, raise
gantry (still attached to pallet) up and into the rails. Make sure all carriage wheels are
engaged onto rails before lowering Hi-Jack. Remove pallet and shipping bars from support
unit.

Installation and Maintenance Guide for IDI 1000F Series Suspension System Model
IDI 1000F-1H WOR
D000-1099 REV C 06-SEP-2018 Image Diagnostics, Inc. 7
INSTALL MONITOR MOUNT
NOTE TO INSTALLER: It is important that the load be balanced on the monitor mount.
B
A
6X
6X
D
E
F
C6X
G
1. Remove wireway cover at top of monitor mount.
2. Drop rotation bearing (G) into pivot plate (top of monitor mount).
3. Take the moly coated thrust ring (F) and put around rotation bearing (G).
4. Place the thin stainless steel thrust ring (E) below the stainless steel thrust ring (F).
5. The six bolts (A) with lockwashers (B) go through rotation cap (D) and rotation bearing (G)
into the pivot tube of the core. Use thread locker LOCTITE #242 on hardware.
6. Apply a very little amount of thread locker LOCTITE #242 to and insert the six setscrews
(C) into the six threaded holes of the rotation cap (D). Thread the setscrews in until they
contact the stainless steel ring (E). The setscrews may be tightened or loosened later to
adjust rotational resistance.
WARNING! Failure to securely attach hardware may
result in serious injury to patient, user, and
damage to equipment.

Installation and Maintenance Guide for IDI 1000F Series Suspension System Model
IDI 1000F-1H WOR
D000-1099 REV C 06-SEP-2018 Image Diagnostics, Inc. 8
MOUNTING MONITOR
Maximum total weight of monitors.
1. To mount a monitor to the system, first remove the monitor mount brackets (front and rear
and on each side of the central pivot body) by unscrewing the two screws that hold the front
bracket to the rear bracket as shown below.
2. Insulation strips may be applied to the Monitor Hanger Brackets at this time if desired.
Mount both front Monitor Hanger Brackets to the rear of the monitor using hardware
provided by Image Diagnostics, Inc. Make sure that the orientation of the brackets match the
view above so that the rectangle slots in the bracket will hook over the cross bars of the
monitor mount. This will prevent the monitor from falling during the process of attaching it
to the monitor mount. Use thread locker LOCTITE #242 on all threaded hardware.
3. Lift the monitor using two people and hook the square slots in the Monitor Hanger Brackets
over the cross bars on the Monitor Mount.
4. Slide Locking Pins (2 per bracket) into the side holes of the Monitor Hanging Brackets as
shown above and orientate them so that the holes in each Locking Pin line up with the holes
in the cross bars.
5. Mount the Tie Down Bar Brackets in the rear with washers and mounting screws (2 per
bracket) as shown above. The screws will thread into the Locking Pins in the Monitor
Hanging Brackets. Use thread-locking fluid on threads of screws.
6. Remove the Back Cover of the Monitor Mount to hard wire the power and signal cables of
the Monitor to the Monitor Mount.
7. Attach Monitor Mount Pad to the back of the Bottom Bar as shown above.
WARNING! Failure to attach hardware securely may
result in serious injury to patient, user, and
damage to equipment.

Installation and Maintenance Guide for IDI 1000F Series Suspension System Model
IDI 1000F-1H WOR
D000-1099 REV C 06-SEP-2018 Image Diagnostics, Inc. 9
NOTE TO INSTALLER: Ground stud has been provided to properly ground monitor.
Terminal strip has been provided for distribution of line voltage to monitor. Cut and strip
monitor power cord to fit.
WARNING! Remove plastic cover and remove block of
wood between gantry core and arm.
Failure to do so may result in serious injury
to user and damage to equipment.
SET ROTATIONAL LIMITS
If desired, the stop pin bumper on top of the Monitor Mount Cover
can be relocated to one of four possible mounting locations.
DRESS CABLES
1. When the monitor has been properly installed, it is recommended that the cables be brought
through the pivot tube at the bottom of the arm. 2" (5cm) flexaust (provided) is to be attached
to pivot tube and to be routed underneath the arm via the cable clamps as shown below. Rotate
entire system and bring to maximum positions. the system should not drift from any position.
If it does, check that enough cable has been left to allow freedom of motion.
36" [914mm]
HANDLING ASSEMBLY
MOBILE CABLE
48" [1220mm]
BETWEEN COMPONENTS
APPROX. LENGTH OF CABLE HOSE
*
[400mm]
15 3/4"
47" [1200mm]
*
LOCATIONS MAY REQUIRE SOME VARIATION
ACTUAL ROOM LAYOUT AND EQUIPMENT
CONFIGURATION
OPTIMUM CABLE HOSE
HANDLING ASSEMBLY
STATIONARY CABLE
*
FOUR POSSIBLE
STOP PIN
MOUNTING POSITIONS

Installation and Maintenance Guide for IDI 1000F Series Suspension System Model
IDI 1000F-1H WOR
D000-1099 REV C 06-SEP-2018 Image Diagnostics, Inc. 10
BALANCE SYSTEM
Note: System balance has been set at factory based upon quoted monitor weight.
1. Note initial settings written on Spring Data label (blank
label is shown on right for reference). Substantial
increases in payload may require spring change.
2. Prior to adjustment - payload must be secure. Fine
adjustment to compensate monitor counterbalance can
be made by turning adjustment screw (item 53) shown
below. Rotate adjustment nut:
clockwise to increase payload capacity
counter clockwise to decrease payload capacity
53
WARNING! Do not remove gas springs. Maximum
payload: 155 lbs. (70.3kg)
CAUTION
IS FOR PRELOADING GAS SPRINGS
THE HARDWARE SHOWN
AVOID INJURY

Installation and Maintenance Guide for IDI 1000F Series Suspension System Model
IDI 1000F-1H WOR
D000-1099 REV C 06-SEP-2018 Image Diagnostics, Inc. 11
YOKE BALANCE ADJUSTMENT
WARNING! Yoke has been leveled at manufacturers.
Make adjustment only if absolutely
necessary to compensate for an unbalanced
load.
NOTE: Prior to yoke adjustment - payload must be secure.
Fine adjustment, to compensate for yoke balance, can be made by turning the link. Loosen threaded
hex nut at outboard rod end as shown below; spin link until yoke is in a horizontal position;
retighten hex nut.
MONITOR MOUNT ASSEMBLY ROTATION RESISTANCE
1. The setscrews (C) installed in step 6 of "INSTALL MONITOR MOUNT" on page 7 can be
loosened or tightened to adjust the rotation resistance of the suspended monitor mount assembly.
2. Replace wireway cover after making adjustment.
F. CLEANING THE EQUIPMENT
No part of this unit is designed to be sterilized in an autoclave. Do not allow water or other
liquids to enter the equipment as this may cause short circuits or corrosion. Clean parts with a
clean cloth dampened with disinfectant or a mild detergent solution. Do not use abrasives,
solvents, sprays or corrosive cleaning agents. Gently rub with a clean soft cloth to dry.
If room is to be disinfected by means of an atomizer, the equipment must be covered with plastic
or similar sheeting. The equipment must be turned off well in advance of this procedure to
prevent convection currents from drawing the disinfectant mist into the equipment. After the
mist disperses completely, the sheeting may be removed and the equipment disinfected as
described above.

Installation and Maintenance Guide for IDI 1000F Series Suspension System Model
IDI 1000F-1H WOR
D000-1099 REV C 06-SEP-2018 Image Diagnostics, Inc. 12
G. MAINTENANCE
"Authorized Technician"
All maintenance procedures should be done by an experienced technician with demonstrated
knowledge and skills (electrical and mechanical) relative to this type of equipment.
This individual must have access to this manual and the proper tools.
Daily Maintenance Checks:
1. Pre-Operational and Post-Operational Checks
When performing daily checks of the monitor suspension, perform the same steps pre-
operational and post-operational.
CAUTION! If any abnormality is found in the monitor
suspension, stop using it. Post a sign reading
"DO NOT USE" so that the system is not used
by mistake. Then contact your representative
for inspection and repair.
1.1. Visual check
Before checking the operation, confirm the following:
The monitor suspension is not tilted.
Monitor is securely attached.
Any Hardware or Components have not been loosened or removed.
1.2. Operational check
Move all the articulating sections and confirm the following:
Operation does not lack smoothness compared to when the monitor suspension was
first installed.
There is no play.
There are no abnormal sounds.
The monitor is not tilted due to lose hardware.

Installation and Maintenance Guide for IDI 1000F Series Suspension System Model
IDI 1000F-1H WOR
D000-1099 REV C 06-SEP-2018 Image Diagnostics, Inc. 13
Annual Maintenance Check:
1. Clean carriage wheels and guides and the rails where carriage wheels and guides ride inside
the rails.
2. Check that the rail mounting hardware has not become loose.
3. Perform a complete functional inspection:
•Rotate monitor mount assembly through complete range.
•Raise and lower monitor mount assembly.
•Roll carriages through complete range of rails.
4. Clean and touch up painted surfaces.
5. Check that all mounting hardware is tight and that there is no wear at:
•the end of the gantry core arm.
•the rotational section between the gantry core arm and the monitor mount assembly.
•the monitor mount assembly pivot joint.
•the monitor bracket pivot and the monitor.

Installation and Maintenance Guide for IDI 1000F Series Suspension System Model
IDI 1000F-1H WOR
D000-1099 REV C 06-SEP-2018 Image Diagnostics, Inc. 14
B
A
6X
6X
D
E
F
C6X
G
Should the screws labeled above as “A”become loose, there will be an opening of the mechanical
junction between the gantry core arm and the monitor mount assembly.
The procedures mentioned in these instructions are based on the recommendations of HHS, I.E.C., etc.
In cases of increased wear or where severe working conditions exist, maintenance checks should be
made at shorter than the specified intervals.
Should any control or indicator fail to operate properly, do not use the equipment until a repair has been
completed. Operating equipment with defective components may expose the operator or the patient to
safety hazards.
The manufacturer strongly recommends that a maintenance program be initiated and that a maintenance
record be kept detailing dates and nature of maintenance performed, the name of the service engineer,
and any other relevant information.
WARNING! Removal of any hardware requires re-
assembly with thread locker Loctite #242 or
equivalent (depending on hardware size)
following manufacturer's instructions.

Installation and Maintenance Guide for IDI 1000F Series Suspension System Model
IDI 1000F-1H WOR
D000-1099 REV C 06-SEP-2018 Image Diagnostics, Inc. 15
H. CUSTOMER SUPPORT
For technical assistance, be sure you have the complete model and serial
number before contacting the local or national service office.
Customer Support
Image Diagnostics, Inc.
310 Authority Drive
FITCHBURG, MA 01420-6047
USA
Or call IDI at (978)829-0009 or send fax to (978)829-0027
Or call Toll Free: (877)304-5434
I. DISPOSAL GUIDELINES
Most of the components used in this suspension system
are made of metal, usually aluminum or steel, and are
easily recycled.
J. APPROVALS
SGS Testing Service
The system was tested and found to be in compliance with the
requirements of all relevant directives and standards in effect within
the European Union at the time of manufacture.
European
Authorized
Representative:
EC
REP
Advena Ltd. Tower Business Centre, 2nd Flr.,
Tower Street, Swatar, BKR 4013 Malta

Installation and Maintenance Guide for IDI 1000F Series Suspension System Model
IDI 1000F-1H WOR
D000-1099 REV C 06-SEP-2018 Image Diagnostics, Inc. 16

Installation and Maintenance Guide for IDI 1000F Series Suspension System Model
IDI 1000F-1H WOR
D000-1099 REV C 06-SEP-2018 Image Diagnostics, Inc. 17
REVISIONS TO THIS MANUAL
Rev Date Description
A December 2011 Preliminary Release
B May 2012 ECO 324
C September 2018 Removed references to “Toshiba.”
Other manuals for 1000F Series
4
This manual suits for next models
1
Table of contents
Other idi Rack & Stand manuals