idi 1000F Series Product manual

D000-554 REV C May-2018 Image Diagnostics, Inc. Page 1
idi
Manufacturer of Quality Medical Products
Image Diagnostics, Inc.
IDI 1000F Series Monitor Suspension System
Model IDI 1000F-1 thru 1000F-6
With Adapter to IDI-03 Rails
Installation and Maintenance Guide

Installation and Maintenance Guide for IDI 1000F Series Suspension System for use
with adapter to IDI-03 Rails
D000-554 REV C May-2018 Image Diagnostics, Inc. Page 2
The text of this manual was originally written, approved and published by the
manufacturer in English.
The information in this manual is subject to change without notice.
CONTENTS
SECTION TITLE
A………………………….. INTRODUCTION, PRODUCT DATA, AND
OPERATION
B………………………….. SYMBOLS
C………………………….. GENERAL SAFETY
D………………………….. SAFETY HAZARDS
E………………………….. INSTALLATION
F………………………….. CLEANING
G………………………….. MAINTENANCE
H………………………….. CUSTOMER SUPPORT
I………………………….. DISPOSAL GUIDELINES
J………………………….. APPROVALS

Installation and Maintenance Guide for IDI 1000F Series Suspension System for use
with adapter to IDI-03 Rails
D000-554 REV C May-2018 Image Diagnostics, Inc. Page 3
A. INTRODUCTION
The IDI 1000F Flat Panel Suspension System transports monitors used in
medical imaging procedures. The system features a counterbalanced arm with
vertical travel and internal cable routing. A dual-axis flat panel monitor mount
permits independent panel mounting and positioning. The mobile package
includes clip-mounted ceiling rails.
PRODUCT DATA
Package Includes:
Mobile gantry and counterbalanced swing arm with 42" sweep radius, 25"
vertical travel and +180o rotation
Anodized aluminum ceiling rails with Easymount clip system
Flat panel array with +180o rotation
Array includes display panel mounts with +10o tilt
Complete installation package; meter box mounts, all mounting hardware and
cable management components; brackets, covers and 25' "flexhaust" hose
OPERATION
The monitors are moved along the overhead rails, positioned vertically, and
rotated manually using the handle.

Installation and Maintenance Guide for IDI 1000F Series Suspension System for use
with adapter to IDI-03 Rails
D000-554 REV C May-2018 Image Diagnostics, Inc. Page 4
B. SYMBOLS
Attention, consult accompanying documents.
Failure to follow these instructions can cause accidents
resulting in serious injury to patient, user, and damage to
equipment.
Caution, risk of electrical shock
Protective Ground
This is the common tie point between the AC monitor
cord grounds, frame ground, and service (main) ground.
Alternating Current
Weight Limit
Recycle
Some of the materials can be recycled rather than discarded.

Installation and Maintenance Guide for IDI 1000F Series Suspension System for use
with adapter to IDI-03 Rails
D000-554 REV C May-2018 Image Diagnostics, Inc. Page 5
C. GENERAL SAFETY
Attention, consult accompanying documents.
Failure to follow these instructions can cause accidents
resulting in serious injury to patient, user, and damage to
equipment.
Only qualified persons may install, operate or maintain this equipment.
Installation of this unit must adhere to applicable codes and authorities having
any jurisdiction over this installation. The customer's architect or engineer is
responsible for assuring that the structural support plans comply with all
applicable codes and regulations.
The unit should be used only in rooms that comply with state, federal and local
recommendations concerning electrical safety when used in medical installations. All
electrical connections shall be done by licensed/approved electrician per national
electric codes.
CAUTION: •Always switch off mains before
performing nonelectrical tests or
maintenance.
•Many positions exist where
equipment or patient collision may
occur. Care must be exercised during
equipment positioning to avoid a
patient or equipment collision.
Changes and additions to the equipment may be performed only by an authorized
representative. These changes must conform to regulations and accepted standards of
good practice. To prevent defeat of the built-in safety mechanisms, changes must be
submitted in writing to the manufacturer for review.
Use only parts specified by Image Diagnostics, Inc. when repairing or servicing this
equipment.
This equipment is intended to only be used with Image Diagnostics, Inc. rails.

Installation and Maintenance Guide for IDI 1000F Series Suspension System for use
with adapter to IDI-03 Rails
D000-554 REV C May-2018 Image Diagnostics, Inc. Page 6
D. SAFETY HAZARDS
Installers and Operators using this equipment should understand the safety issues
and operating instructions provided.
Comments and questions regarding safety should be addressed to:
Customer Support
Image Diagnostics, Inc.
310 Authority Drive
FITCHBURG, MA 01420-6047
USA
Or call IDI at (978)829-0009 or send fax to (978)829-0027
Or call Toll Free: (877)304-5434
SAFETY HAZARDS ALERTS
Alert
Circumstances for use
DANGER
Indicates an imminentlyhazardous situation which, if
not avoided, will result in death or serious injury.
WARNING
Indicates a potentially hazardous situation which, if
not avoided, could result in death or serious injury.
CAUTION
Indicates a potentially hazardous situation which, if
not avoided, may result in minor or moderate injury
or equipment damage.

Installation and Maintenance Guide for IDI 1000F Series Suspension System for use
with adapter to IDI-03 Rails
D000-554 REV C May-2018 Image Diagnostics, Inc. Page 7
E. INSTALLATION
UNPACK
No special handling is required for unpacking this equipment at the site.
Conventional shipping materials are used.
Recycle or disposal of shipping material per local regulations
INSTALL CEILING RAILS
1. Refer to the Adapter Plan drawing to determine the rail-to-grid attachment
points.
2. Attach the pair of ceiling rails to the room mounting grid with Rail Mounting
Kits. (Refer to the Longitudinal Ceiling Rail Assembly and Rail Mounting Kit
drawings for information on orientation of rails and mounting kits.) Lightly
tighten hardware.
3. Position the ceiling rails so that the ends line up and the rails are parallel, then
tighten all mounting hardware.
INSTALL CEILING RAIL END STOPS (Refer to Adapter Assembly Drawing)
1. The two adjustable end stops provided are to be positioned at diagonal ends of
the rails. Load one end stop (item 24) into each rail and slide to opposite ends.
(Note: rubber bumpers face in.) Do not tighten hardware yet.
2. Install both pairs of rail end caps (item 29) at the ends of the ceiling rails. Use
Loctite #242 on hardware (item 22).
WARNING! Failure to install both pairs of end
caps will result in serious injury to
user.

Installation and Maintenance Guide for IDI 1000F Series Suspension System for use
with adapter to IDI-03 Rails
D000-554 REV C May-2018 Image Diagnostics, Inc. Page 8
BUILD TRANSVERSE BRIDGE (Refer to Adapter Assembly Drawing)
1. Remove the two wheel shaft/guide wheel mounts (item 6) from the rail adapter
carriage (item 2). Tilt the two wheel shaft/guide wheel mounts into the rail.
2. Remove the two wheel shaft mounts (item 7) from the rail adapter carriage.
Tilt the two wheel shaft mounts into the rail.
3. Bolt the wheel shaft/guide wheel mounts (item 6) to the rail adapter carriage with
socket head cap screws and lock washers (item 21, 31). Use Loctite and tighten
hardware to 170 inch-lbs.
4. Bolt the right wheel shaft mounts to the rail adapter carriage with socket head
cap screws and lock washers (item 21, 31). Use Loctite and tighten hardware to
170 inch-lbs.
INSTALL RAIL END PLATE (Refer to End Plate Assembly Drawing)
1. Install one end plate (item 22) at the far end of the rails, making sure rubber
bumper (item 23) faces in towards the rails. Use Loctite #242 on all threads.
INSTALL TRANSVERSE RAILS (Refer to Adapter Assembly Drawing)
1. Raise up one rail (item 9), perpendicular to the adapter carriages and hold in
place. Place two pairs of rail clips (item 5) around the rail flanges, locating
clips under the four-hole mounting patterns in the adapter carriages. Bolt the
rail to the carriages. Lightly tighten hardware. Attach the second rail in the
same manner.
2. Place the two triangulation bars (item 3) over the adapter carriages. Lightly
fasten to carriages with the rail mounting hardware.

Installation and Maintenance Guide for IDI 1000F Series Suspension System for use
with adapter to IDI-03 Rails
D000-554 REV C May-2018 Image Diagnostics, Inc. Page 9
3. Slide the rails back and forth to center them under the adapter carriages and to
align both ends. Make adjustments at the triangulation bars and rail clips until
the rails are spaced 17 1/8" apart at both ends. Tighten hardware (16 places).
END-LOAD GANTRY (Refer to End Plate Assembly Drawing)
1. Remove shipping straps and packing material from carriage. Using Hi-Jack or
other suitable lift table, raise gantry (still attached to pallet) up and into the
rails. Adjust center wheels if necessary per figure on page 8. Make sure all
carriage wheels are engaged onto rails before lowering Hi-Jack. Remove
pallet and shipping bars from support unit.
WARNING! Remove plastic cover and remove
block of wood between gantry core
and arm. Failure to do so may result
in serious injury to user and damage
to equipment.
2. Install the second end plate (item 22) at the near end of the rails, making sure
rubber bumper faces in towards the carriage. Use LOCTITE #242 on all
threads.
WARNING! Failure to install both rail end plates
may result in serious injury to user.

Installation and Maintenance Guide for IDI 1000F Series Suspension System for use
with adapter to IDI-03 Rails
D000-554 REV C May-2018 Image Diagnostics, Inc. Page 10
INSTALL MONITOR MOUNT (Refer to Monitor Mount Assembly Drawing)
NOTE TO INSTALLER: It is important that the load be balanced on the
monitor mount. Take into account any differences in size and weight of the
monitors.
1. Remove wireway cover (item 38).
2. Drop rotation bearing (item 50) into pivot plate (item 59).
3. Take the thicker thrust ring (item 20) and put around rotation bearing (item 50).
4. Place the stainless-steel thrust ring (item 47) below the thicker thrust ring (item
20).
5. The six bolts (item 16) with lockwashers (item 29) go through rotation cap (item
43) and rotation bearing (item 50) into the pivot tube (item 43 in the Core
Assembly Drawing). Use LOCTITE #242 on hardware.
6. Apply a very little amount of LOCTITE #242 to and insert the six setscrews
(item 24) into the six threaded holes on second rotation cap (item 43). Thread
the setscrews in until they contact the rotation cap (item 43). The setscrews
may be tightened or loosened later to adjust rotational resistance.
WARNING! Failure to securely attach hardware
may result in serious injury to
patient, user, and damage to
equipment.

Installation and Maintenance Guide for IDI 1000F Series Suspension System for use
with adapter to IDI-03 Rails
D000-554 REV C May-2018 Image Diagnostics, Inc. Page 11
INSTALL MONITOR (Refer to Monitor Mount Assembly Drawing)
Maximum weight of any individual monitor.
Maximum total weight of monitors.
1. To attach a monitor to the system, first remove a monitor mounting bracket
(item #30) by removing its mounting screw (item #21). Fasten the bracket to
the monitor (hardware not provided). Reinstall the bracket with the monitor.
WARNING! Failure to securely attach hardware
may result in serious injury to
patient, user, and damage to
equipment.
2. Monitors can be tilted and rotated.
3. If monitor tilt resistance is inadequate and it fails to stay in the desired position,
tighten bolt (item 21).
4. If monitor rotation resistance is inadequate and it fails to stay in the desired
position, tighten bolt (item 22).
NOTE TO INSTALLER: Ground stud (item 27) has been provided to
properly ground monitors as a group. Terminal strip (item 31) has been
provided for distribution of line voltage to each monitor. Cut and strip each
monitor power cord to fit.
25 LBS
11 kg
44 kg
96 LBS

Installation and Maintenance Guide for IDI 1000F Series Suspension System for use
with adapter to IDI-03 Rails
D000-554 REV C May-2018 Image Diagnostics, Inc. Page 12
SET ROTATIONAL LIMITS (Refer to Monitor Mount Assembly Drawing)
1. If desired, the stop pin (item 4) can be relocated to another of its four possible
mounting locations. Remove rotational cover (item 35) to access the stop pin
mounting screw (item 52).
ELECTRICAL CONNECTIONS
1. Colors of conductors in power supply cords shall be in accordance with IEC
publication 60227 (amendment #1) or with IEC publication 60245.
Wiring Color Codes:
International: brown (line), blue (neutral), green/yellow (ground)
North America: black (line), white (neutral), green/yellow (ground)
2. Cable tie mounting platforms are supplied near the terminal block for anchoring
the monitor cords and the wires from the mains. Use nylon cable ties. (Tying
the cord into a knot or tying the ends with string shall not be used for cord
anchorage).
3. Conductors of the power supply cord shall be arranged that the protective earth
conductor is not subject to strain as long as the phase conductors are in contact
with their terminals.
4. All power cords used for mains connection shall have double insulation.
Conduit provided for routing cables shall not be relied on for insulation.
FOUR POSSIBLE
STOP PIN
MOUNTING POSITIONS

Installation and Maintenance Guide for IDI 1000F Series Suspension System for use
with adapter to IDI-03 Rails
D000-554 REV C May-2018 Image Diagnostics, Inc. Page 13
5. Connect all monitor ground wires and the service ground wire as shown in the
figure above. (The number of wires varies with the number of monitors
installed).
INSTALL STATIONARY CABLE HANDLING ASSEMBLY
(Refer to Stationary Cable Handling Kit Drawing)
1. Determine which rail end the stationary cable handling assembly will be
positioned. If at the far end of the rail, slide nut plate of stationary standoff
assembly (items 1-7) into rail track prior to positioning the mobile cable
handling kit. If stationary assembly is to be positioned at the near end of rail,
slide into rail after positioning mobile cable handling kit. Stationary standoff
is typically mounted approximately 6 inches (15cm) from rail end.
2. Tighten standoff (item 2) after applying LOCTITE #242 to the end that will be
secured into the nutplate (item 1). Torque standoffs to ~35-50 inch pounds,
4.2-6.0(Nm). Attach bracket and strap (items 3, 6) with hardware as shown.
Use LOCTITE #242 on hardware.
CAUTION! Over tightening the standoff will
weaken or break the set screw
connecting the standoff to the nut
plate causing attached components
to fall. DO NOT loosen or adjust the
exposed length of the setscrew on the
standoff.
(#10-32 HARDWARE)
NUT "B"
MAIN GROUND WIRE
FROM SERVICE
NUT "A"
under split lockwasher and nut "A".
First attach main ground wire
Attach all other ground wires
between nut "A", lockwashers,
and nut "B".

Installation and Maintenance Guide for IDI 1000F Series Suspension System for use
with adapter to IDI-03 Rails
D000-554 REV C May-2018 Image Diagnostics, Inc. Page 14
INSTALL MOBILE CABLE HANDLING ASSEMBLY (Refer to Cable Handling
Kit Assembly Drawing)
1. Slide nut plate of two hanger standoff assemblies (items 1&2) into rail track.
After applying LOCTITE #242 to the end that will be secured into the nutplate
(item 1), position standoffs approximately 48" (122cm) from each other. To
assure proper fit and positioning, temporarily assemble cable hanger shaft
(item 4) to standoffs. Place one shaft support (item 3) onto far end standoff.
Place the other shaft support to the second standoff, while temporarily
installing cable hanger shaft (item 4) into holes of shaft supports. Lightly
tighten socket head cap screws (item 5). Use LOCTITE #242 on hardware.

Installation and Maintenance Guide for IDI 1000F Series Suspension System for use
with adapter to IDI-03 Rails
D000-554 REV C May-2018 Image Diagnostics, Inc. Page 15
2. Position shaft/cable handling subassemblies (items 1-5) to desired location on
rail. Without disrupting alignment, remove shaft and shaft supports. Torque
standoffs to ~35-50 inch pounds, 4.2-6.0(Nm). Use LOCTITE #242 on
hardware.
CAUTION! Over tightening the standoff will
weaken or break the set screw
connecting the standoff to the nut
plate causing attached components
to fall. DO NOT loosen or adjust the
exposed length of the setscrew on the
standoff.

Installation and Maintenance Guide for IDI 1000F Series Suspension System for use
with adapter to IDI-03 Rails
D000-554 REV C May-2018 Image Diagnostics, Inc. Page 16
3. Reattach shaft supports. Install one end of shaft to a shaft support. Tighten
socket head cap screw (item 5). Slide cable trolley assembly(s) onto cable
hanger shaft (item 4). Install free end of shaft into other shaft support. Tighten
second socket head cap screw (item 4). Use LOCTITE #242 on hardware.
DRESS CABLES (Refer to Gantry Core Assembly)
1. When the monitors have been properly installed, it is recommended that the
cables be brought through the pivot tube (item 43). 2" (5cm) flexaust (provided)
is to be attached to pivot tube and to be routed underneath the arm (item 51) via
the cable clamps (items 46, 50). Rotate entire system and bring to maximum
positions: the system should not drift from any position. If it does, check that
enough cable has been left to allow freedom of motion.
47" [1200mm]
48" [1220mm]
15 3/4"
*
*
LENGTH OF CABLE HOSE
*
BETWEEN COMPONENTS
STATIONARY CABLE
HANDLING ASSEMBLY
MOBILE CABLE
HANDLING ASSEMBLY
OPTIMUM CABLE HOSE
CONFIGURATION
[400mm]
ACTUAL ROOM LAYOUT AND EQUIPMENT
LOCATIONS MAY REQUIRE SOME VARIATION
47" [1200mm]

Installation and Maintenance Guide for IDI 1000F Series Suspension System for use
with adapter to IDI-03 Rails
D000-554 REV C May-2018 Image Diagnostics, Inc. Page 17
BALANCE SYSTEM (Refer to Gantry Core Assembly)
Note: System balance has been set at factory based upon quoted monitor weight.
1. Note initial settings from Spring Data label (item 18). Substantial increases in payload
may require spring change.
2. Prior to adjustment - payload must be secure and arm horizontal. Fine adjustment to
compensate monitor counterbalance can be made by turning adjustment screw (item
53). Rotate adjustment nut:
clockwise to increase capacity
counter clockwise to decrease capacity
WARNING! Do not remove gas springs.
Maximum payload: 96 LBS. (44
KGS.)
Yoke Balance Adjustment
WARNING! Yoke has been leveled at
manufacturers. Make adjustment
only if absolutely necessary to
compensate for an unbalanced load.
NOTE: Prior to yoke adjustment - payload must be secure and arm horizontal.
1. Fine adjustment, to compensate for yoke balance, can be made by turning the
link (item 48). Loosen threaded hex nut (item 24) at outboard rod end (item 10);
spin link until yoke is in a horizontal position; retighten hex nut.
CAUTION
IS FOR PRELOADING GAS SPRINGS
THE HARDWARE SHOWN
AVOID INJURY

Installation and Maintenance Guide for IDI 1000F Series Suspension System for use
with adapter to IDI-03 Rails
D000-554 REV C May-2018 Image Diagnostics, Inc. Page 18
MONITOR MOUNT ASSEMBLY ROTATION RESISTANCE
1. The setscrews (item 24) installed in step 6 of "INSTALL MONITOR MOUNT"
on page 12 can be loosened or tightened to adjust the rotation resistance of the
suspended monitor mount assembly.
2. Replace wireway cover (item 38) after making adjustment.
F. CLEANING THE EQUIPMENT
No part of this unit is designed to be sterilized in an autoclave. Do not allow
water or other liquids to enter the equipment as this may cause short circuits or
corrosion. Clean parts with a clean cloth dampened with disinfectant or a mild
detergent solution. Do not use abrasives, solvents, sprays or corrosive cleaning
agents. Gently rub with a clean soft cloth to dry.
If room is to be disinfected by means of an atomizer, the equipment must be
covered with plastic or similar sheeting. The equipment must be turned off well
in advance of this procedure to prevent convection currents from drawing the
disinfectant mist into the equipment. After the mist disperses completely, the
sheeting may be removed and the equipment disinfected as described above.
G. MAINTENANCE
"Authorized Technician"
All maintenance procedures should be done by an experienced technician with
demonstrated knowledge and skills (electrical and mechanical) relative to this
type of equipment.
This individual must have access to this manual and the proper tools.

Installation and Maintenance Guide for IDI 1000F Series Suspension System for use
with adapter to IDI-03 Rails
D000-554 REV C May-2018 Image Diagnostics, Inc. Page 19
Daily Maintenance Checks:
1. Pre-Operational and Post-Operational Checks
Perform daily checks of the monitor suspension BEFORE and AFTER operating
the equipment.
CAUTION! If any abnormality is found in the
monitor suspension, stop using it. Post
a sign reading "DO NOT USE" so that
the system is not used by mistake.
Then contact your Toshiba
representative for inspection and
repair.
2. Visual check
Before checking the operation, confirm the following:
•The monitor suspension is not tilted. Refer to the following figures.
•Although "A" in the following figure shows a gap, there is no gap at the
monitor frame rotation section.
•Monitors installed on the monitor suspension are not tilted.
•Screws or some parts are not loosened or removed.
•The pad mounted to the bottom of the monitor mount assembly is not
damaged or missing.
TILTED STATUS
NORMAL STATUS
A

Installation and Maintenance Guide for IDI 1000F Series Suspension System for use
with adapter to IDI-03 Rails
D000-554 REV C May-2018 Image Diagnostics, Inc. Page 20
3. Operational check
Move all the movable sections and confirm the following:
Operation does not lack smoothness compared to when the monitor
suspension was installed.
There is no play.
There are no abnormal sounds.
The monitors or monitor suspension are not tilted due to looseness of secured
sections.
Pad attached to the underside of
the monitor mount bracket must
be complete and undamaged
Other manuals for 1000F Series
4
This manual suits for next models
2
Table of contents
Other idi Rack & Stand manuals