17)Hold the heater in place and mark the 2 mounting holes; make sure the two holes line up
on the middle/center of the circular framing bar (PIC09).
18)Use a 1/8” bit to pre-drill pilot holes on these marks.
19)Use the (2) self-tapping screws to install the heater bracket to the circular framing bar
(PIC09).
STEP 5: SPLICE INTO THE COOLANT LINES
20)Cut the heater hose into pieces of 8’ and 2’.
21)Locate the hose coming off of the Overflow Tank and clamp off on each side of the line
where you will make your cut (PIC10).
22)Install the black Y-Fitting into the hose using the hose clamps provided (PIC10).
Make sure the 5/8” splice is pointing toward the Overflow Tank, you want the
coolant to flow back into the system (from the heater) in the same direction.
23)Take the 2’ piece of heater hose and connect it from the Y-Fitting splice to the highest
heater core fitting (relative to gravity).
24)Remove the rear bed panel, this will give you access to the inlet radiator hose.
25)Using hose clamps, clamp off on each side of the inlet radiator line where you will make
your cut (PIC11).
26)Install the 1” aluminum Y-Fitting into the hose using the hose clamps provided (PIC11).
Make sure the 5/8” splice is pointing toward the front of the machine (away from
the engine), you want the coolant to flow uninhibited into the inlet heater hose.
27)With the main skid plate section removed attach the 8’ piece of hose to the inlet Y-Fitting
splice and run it to the front of the machine.
28)Pull the slack out of the heater hose and use the extra zip ties provided to tie it to the
radiator lines underneath the machine (PIC12). You can now reinstall the skid plate.
29)Run the inlet heater hose up to the front of the machine as shown in PIC13.
30)Attach the inlet heater hose to the lower heater core fitting (relative to gravity) and secure
with the hose clamp provided.
31)Make sure all connections are secured with hose clamps.
32)Reinstall the Overflow Tank (PIC14) and the front hood panel.
STEP 6: REFILL COOLANT
33)Refill the radiator and check for leaks.
34)Start the machine and allow the engine to warm up and circulate the coolant.
35)Drive the vehicle and put it under a good load, this will help expel air from the system.
36)When done let the machine cool down, recheck the coolant level and add to the overflow
tank, if needed.
37)Coolant will be consumed as the air is expelled from the system. It is possible you will
need to run the machine and recheck fluid levels multiple times before working out all of
the air.