Juwent TERM-E-18 User manual

ELECTRIC HEATING AND VENTILATION UNITS
TERM-E
Szymański, Nowakowski General Partnership
31 Lubelska Str., 08-500 Ryki
phone +48 81 883 56 00, fax +48 81 883 56 09
POLAND
I. CONTACTS
II. ORIGINAL INSTRUCTION MANUAL
III. WARRANTY TERMS AND CONDITIONS
IV. UNIT STARTUP REPORT
V. INSPECTION AND MAINTENANCE DOCUMENT
VI. SERVICE NOTIFICATION
VII. LIST OF SUBASSEMBLIES INSTALLED IN THE UNIT
Please read this instruction manual carefully before beginning any work.
RYKI 2017
ISSUE 1 EN

2www.juwent.com.pl
I. CONTACTS
Szymański, Nowakowski General Partnership
31 Lubelska Str., 08-500 Ryki
phone +48 81 883 56 00, fax +48 81 883 56 09
POLAND
Export department
mob.+48 502 087 841
mob.+48 664 465 243

3www.juwent.com.pl
ELECTRIC HEATING AND VENTILATION UNITS
TERM-E
II. ORIGINAL INSTRUCTION MANUAL

4www.juwent.com.pl
TABLE OF CONTENTS
1. INTENDED USE 5
2. DESIGNATIONS 5
3. DEVICE DESCRIPTION 5
4. TECHNICAL DATA 6
5. ADDITIONAL EQUIPMENT 8
6. TRANSPORT 10
7. SAFETY RECOMMENDATIONS 10
8. MOUNTING 11
9. WIRING SYSTEM 14
10. AUTOMATICS 15
11. DEVICE COMMISSIONING 16
12. REPAIR, MAINTENANCE AND WITHDRAWAL FROM USE 16
13. TROUBLESHOOTING 17
14. INFORMATION 17

5www.juwent.com.pl
1. INTENDED USE
TERM-E heating and ventilation units, are intended to heat and ventilate such compartment as:
industrial halls, warehouses, workshops, other objects of similar use
The units should be used only according to the intended use.
The manufacturer is not liable for using the units against the intended use and for any
damages arisen for this reason.
TERM 1; 2; 3 and 4 units cannot be used in the compartments with relative humidity
larger than 95% and air dust concentration over 3mg/m3.
The compartment can be served by one or larger number of the units, also by the units of different
sizes. The units can operate as heating or heating and ventilation units with added intake boxes and
wall or roof intakes. The intake boxes enable to draw circulating air through grids located on either
side of the box and fresh air through an inlet hole of the intake box.
2. DESIGNATIONS
Heating and ventilation unit TERM-E -27-D
Heating power 18, 27 kW
Equipment
single-row grid (K);
slot diffuser (N);
discharge cone (D);
Marking of unit’s optional automation
AT-RTA
Supply and control box AT
Additional elements
temperature regulator (RTA)
timer (ZG)
regulator and timer (RTA + ZG)
3. DEVICE DESCRIPTION
W skład aparatu wchodzą:
»axial fan mounted on the rear wall of the unit with a net protecting the rotor;
»electric heaters with spirally rolled aluminium nned tubes;
»casing made of steel sheets with a single-row outlet grid allowing adjusting a direction of supply
air. The structure of grid blades protects against an automatic rearrangement of the blades.
The single-row grid can be replaced with the slot diffuser or outlet nozzle.
The casing can be made of stainless steel sheets.
»protection net made of galvanized steel sheet against accidental contact with heaters,
The casing variant with the following items is recommended to use with the units which are planned
to be operated as ceilings ones:
»slot diffuser - for heating a zone of human presence by a secondary air stream;
»discharge cone - for increasing a range of supply air stream.

6www.juwent.com.pl
4. TECHNICAL DATA
Size of unit TERM-E-18 TERM-E-27
Dimensions
A [mm] 556 556
B [mm] 526 526
L [mm] 420 420
a [mm] 420 420
b [mm] 290 290
Weight [kg] 30 34
Unit’s IP 30 30
Parameters of fans in units
Type of fan FE-031EQ FE-035EQ
Revoluons [rev/min] 1400 1400
Voltage [V] 230 230
Motor power [W] 140 180
Current [A] 0,63 0,77
Parameters of heaters in units
Voltage [V] 400 400
Power [kW] 18 27
Current [A] 27 39
Noise level dB[A]
At distance of 1m 61 63
At distance of 5m 57 59
Noise level - sound pressure level at a distance of 1 and 5m taking account of directivity factor Q=2
and room absorption value A=50m2.
Heat output of units and air temperature rises
Size of unit TERM-E-18 TERM-E-27
Acvaon
threshold of
heaters
Air ow capacity [m3/h], heat output [kW], outlet air temperature rise [oC]
[m3/h] kW OC [m3/h] kW OC
I1400 6 8 1900 9 9
II 1600 12 17 2200 18 17
III 2100 18 25 2900 27 26

7www.juwent.com.pl
Unit environment and fan motor parameters
Unit
size
Operation temperature
[OC] IP Insulating class
TERM-E do +60 54 F
OUTLET DIFFUSERS FOR THE UNITS
TERM-E
Unit with single-row outlet grid (K)
Slot diffuser (N)
Discharge cone (D)
Slot diffuser (N)
Size of unit A x B
[mm x mm]
a x b
[mm x mm]
Ln
[mm]
TERM-E 555 x 525 355 x 355 100
Discharge cone(D)
Size of unit A x B
[mm x mm]
c x d
[mm x mm]
Ld
[mm]
TERM-E 555 x 525 350 x 350 190
The units are supplied with the single-row grid as a standard.
Grids have the movable blades enabling the air stream direction and reach adjustment.
Ceiling units can be equipped with:
»slot diffusers (N) (air supply to 4 sides);
»discharge cone (D).
Wall units can be also equipped with discharge cone (D).
Slot diffusers are enabling heating people staying zones with the secondary air stream.
Unit TERM-E with slot diffuser can be suspended on the height max. 4m.
Discharge cone enable increase of air supply range.

8www.juwent.com.pl
5. ADDITIONAL EQUIPMENT
ROOF INTAKE CD
The roof intakes are intended to draw fresh air from above the roof and to protect the object against
precipitation.
In order to protect against pollution and insects the intakes have shields and nets installed on either
side (only for CD-4 and amount of external air over 40% the intake has the shields installed on four
sides).
The intakes are adapted to connect with the roof bases PD.
Unit size Intake
size
A
[mm]
Lc
[mm]
C
[mm]
Weight
[kg]
TERM-E CD-1 520 580 728 20,0
S - net
o - shield
The roof intakes are whole made of galvanized steel sheets.
ROOF BASE PD
The roof bases are intended to install the roof intakes CD and intake boxes SC of the TERM units.
Unit size Base size A
[mm]
Lp
[mm]
C
[mm]
Weight
[kg]
TERM-E PD-1 520 600 740 31
The roof bases are made of galvanized steel sheets.
INTAKE BOXES SC
For ceiling and wall heating and ventilation units
Basic version
Version with additional elements:
lter and circulating air dampers
The intake boxes are used to draw and mix fresh and circulating air.
In case the intake boxes are used for the TERM units it is necessary to use (as additional equipment)
exible connector (K) allowing connecting the intake boxes with the units.

9www.juwent.com.pl
In basic version the intake boxes SC consists of:
»fresh air damper;
»mixing chamber with circulating air inlet grids.
The fresh air damper is operated a actuator.
The mixing chamber has 2 grids (manually adjusted) in the circulating air inlet holes allowing setting
a share of circulating air in the total air efciency.
Unit size Box size A
[mm]
Lm
[mm]
Lmax
[mm]
Weight [kg]
SC basic version SC version with lter
and dampers
TERM-E SC-1 520 310 930 23 35
The intake boxes SC can be made with additional elements:
»lter (F) class G3;
»circulating air dampers (P) with actuators.
The intake boxes with additional elements are made in consultation with the manufacturer.
In consultation with the manufacturer the intake boxes can be also made with the mixing chamber
with one circulating air inlet grid.
Air capacity of unit equipped with the SC intake boxes in standard version
Unit size Fan type Air capacity [m3/h]
TERM-E FE-035-4E 2340
Thermal power of the units with SC intake boxes in the standard version is decreased by about~5%.
ADJUSTMENT RANGES OF INTAKE BOXES SC IN STANDARD VERSION
The intake boxes SC in standard version are delivered for all TERM units with a constant recommended
circulating air grid closing angle equal to 60O.
Adjustment ranges of fresh air, share of fresh air in total air efciency by means of damper at the
constant recommended circulating air grid closing angle
Unit size Box size
Adjustment
range of fresh
air by damper
Circulating air
grid closing
angle
% share
of fresh
air in total
efciency
Share of fresh air
[m3/h]
Total air
capacity
[m3/h]
TERM-E SC-1 open-closed 60O10%÷75% 190÷1760 1940÷2340
Adjustment ranges of fresh air, share of fresh air in total air efciency by means of damper depending
on different circulating air grid closing angles
Adjustment range of fresh air by
damper Circulating air grid closing angle % share of fresh air in total
capacity
open-closed 0o1,5% ÷ 57%
open-closed 30o3,5% ÷ 62%
open-closed 45o5% ÷ 67%
open-closed 60o10% ÷ 75%
open-closed 75o17% ÷ 83%
When it is required to extend the adjustment of share from 100% of fresh air to 100 % of circulating
air it is foreseen to replace the standard intake boxes with circulating air grids with the boxes with
increased tightness dampers (2 pcs.) with servomotors.

10 www.juwent.com.pl
WALL INTAKE CS
The wall intakes are intended to draw fresh air from outside the wall.
Unit size Intake size A
[mm]
Weight
[kg]
TERM-1 CS-1 520 7
The wall intakes are made of steel sheets protected by paint coats.
Presentation of % of share of fresh air to which wall intakes with dimensions equal to intake boxes
meet a condition of air inlet speed lesser than 2,5 m/s, i.e. they will not suck rain
Unit size A
[mm]
Intake area
[m2]
Total air capacity
[m3/h]
Efciency of fresh air at
V<2,5m/s [m3/h]
Fresh air efciency
Total air efciency
TERM-E 520 0,27 2340 2450 > 100 %
The TERM-E1 units can operate totally using fresh air from the wall intakes with dimensions equal to
dimensions of cross-sections of intake boxes.
6. TRANSPORT
The delivered units are completely assembled, protected from outside by polyethylene foil against
pollution and weather impacts.
The Product Manual is delivered along with the unit.
The intake boxes and wall intakes constitute additional equipment and they are delivered separately,
protected by polyethylene foil.
The automatics elements delivered at the customer’s request are packed separately.
The units should be transported in one layer in a way preventing mechanical damages.
7. SAFETY RECOMMENDATIONS
The heating and ventilation units should be used only in compliance with the instruction
manual.
The start-up, mounting, connection, inspections and repairs of the unit should be
executed by an authorized installer, the electric works should be executed by a person
having required certicates authorized to carry out electric works.
All service and repair works should be executed when voltage is off.
Unit should be protected against moisture and do not clean the heater with a damp
cloth.
Unit can only be operated when it is fully operational, in the event of a failure,
immediately cut off the power supply.

11www.juwent.com.pl
Before connecting the unit, check the electrical system, especially the electrical
connections.
The unit may by operated only with proper connection with grounding wire.
Unit must be permanently connected to the electric installation equipped with protective
(earth) terminal, residual current device and service switch.
The thermostat protecting the heater from overheating must be included in the heater
control system.
It is forbidden to switch on the unit without working fan. Every stop of air ow have to
disconnect the heater.
Voltage-free status can only be obtained by turning off the service switch.
Service switch disconnecting all power lines should be located near the unit.
Due to the structure the unit does not emit harmful radiation.
Although the unit was designed and manufactured in compliance with the requirements of the
standards, according to their state at the moment of production launch, a probability of injury or
health loss when using the unit is not to be avoided. This probability is connected with a frequency of
access to the unit in the course of its use, cleaning or repair, presence of persons within a dangerous
zone, acting against the safety rules specied in the instruction manual.
The gravity of body injury or deterioration of health condition depends on many factors that often
can be foreseen only partially, taking them into consideration in the structure of the unit, specifying
them and warning against them in the instruction manual.
Therefore there is a residual risk when the operator does not observe the recommendations and
guidelines included in the instruction manual.
8. MOUNTING
The walls, ceilings or constructional elements of the object to which the unit supports or
suspensions are xed should have proper strength.
It should be consulted with the designer of the object.
The bearing structures of the units or for the units with intake boxes can be freely
designed observing the strength requirements.
When it is necessary to locate the unit by a partition, e.g. made of steel sheets, stiffening
proles should be used to avoid vibrations of the partition generated by the unit
operation and the noise level increase in the compartment.

12 www.juwent.com.pl
SUSPENSIONS (ADDITIONAL EQUIPMENT)
We can deliver the following suspensions for the units:
Unit size
Suspension type
Heating function Heating and ventilation function
Wall units Ceiling units Wall units Ceiling units
TERM-E
set of suspension
elements EZ
set of suspension
elements EZ
suspensions GW, GWt
or
supports WW, WWt
suspension on
threaded bars
TERM-E (heating function)
Wall and ceiling units - set of suspension elements EZ
A set of elements to suspend the unit includes:
»angle sections fastened to the construction partition - 2pcs.
»channel sections to suspend the unit - 6 pcs.
The wall unit can operate in the vertical position or in the position inclined from the plumb line up
to 20O.
Unit size a
[mm]
b
[mm]
l
[mm]
Hmin
[mm]
TERM - E 470 620 990 180
TERM-E (heating and ventilation function)
Wall units- suspensions GW i GWt
Suspension GW
-intake box without lter
Unit size a
[mm]
b
[mm]
l
[mm]
TERM-E 880 700 ~1315
Suspension GWt
- intake box with lter
TERM-E 1030 700 ~1575
CS - wall intake
SC - intake box
K - exible connector
GW suspension set

13www.juwent.com.pl
Wall units - supports WW i WWt
Support WW
-intake box without lter
Unit size a
[mm]
b
[mm]
l
[mm]
TERM-E 880 560 ~930
Support WWt
- intake box with lter
TERM-E 1030 560 ~930
CS - wall intake
SC - intake box
K - exible connector
GW suspension set
WW support set
Ceiling units - suspension on threaded bars
Unit size a x b
[mm]
TERM-E 620x290
CD - roof intake
PD - roof base
SC - intake box
K - exible connector
c - ceiling
tb - threaded bars

14 www.juwent.com.pl
Installing TERM-E units with intake box
When the unit with intake box is ordered the manufacturer provides the unit with exible connectors
tted on the casing’s rear wall.
For wall units, screw intake boxes to wall barrier, place the unit with exible connector on supporting
structure and screw the intake box to the unit.
Screw the unit to the supporting structure with 4 bolts through rubber pads located in the bottom
of the casing.
Setting of wall units with intake boxes is done using GW, GWt suspensions, WW, WWt supports, or
other suspensions or supports provided by the customer.
Each of the GW, GWt suspensions feet or WW, WWt supports feet should be screwed to the wall or
structural elements of the facility with 4 bolts M10 or 4 wall plugs of adequate strength.
(Neither GW, GWt suspensions set nor WW, WWt support set comes with bolts M10 and wall plugs).
The unit with intake box should be levelled.
For intake box with lter, in general connect the lter between the intake box and the unit’s
connector.
The lter’s cover should be placed on the casing’s vertical wall so it is possible to remove the lter
for cleaning from the side of suspensions or supports.
Minimum required distance of the unit with intake box for removal of ltration section
is 70cm.
For ceiling units, intake boxes should be screwed to the roof base.
The unit with exible connector should be suspended on the ceiling or structural elements of the
roof on 4 threaded bars M10 and connected to the intake box.
Threaded bars of suspensions are mounted to brackets (angles) attached to the unit casing’s side
walls. It is recommended to use rubber pads.
Threaded bars must be secured with lock nuts preventing their unscrewing.
9. WIRING SYSTEM
Electrical installation and connection of the power supply to the unit must be carried out
in accordance with relevant construction standards and regulations.
Electrical connections, and commissioning, inspection and repair works should be
carried out only by an electrician with required electrical qualications and familiarized
with this instruction manual.
Before connecting make sure that the voltage and frequency rating of the power supply
are in accordance with the data given on the units data plates. Otherwise, do not
connect the device.
Units are intended to be supplied with 3-phase voltage: 3~400V (L1, L2, L3, N, PE). Power supply
connection must be carried out using a 5x6mm2 wire (for 18kW) and 5x10mm2 wire (for 27kW).
B - Supply and control box
*S - Room temperature sensor - option with temperature regulator (RTA)
**A - Air damper actuator - option with intake box

15www.juwent.com.pl
10. AUTOMATICS
Standard equipment is as follows:
»HEATING COIL THERMOSTAT (adjacent to heating element parts) for reducing and monitoring
of outlet air temperature in the event of disturbed air ow (e.g. fan failure). Set-point range for
thermostat is 0OC to 200OC with a constant hysteresis of 5OC, which yields a maximum supply
temperature of 80OC.
As an additional option, units can be tted with the following automatic equipment components:
»POWER SUPPLY AND CONTROL BOX AT equipped with overcurrent breakers, relays
and contactors, signal lamps, switches: AUTO | STOP, 3-speed power and air efciency adjustment
and HEATING | VENTILATION.
»TEMPERATURE CONTROLLER RTA (two-speed): to monitor and control temperature in the
room.
»PROGRAMMABLE TIMER ZG: to program the heating coil work time.
»DAMPER ACTUATORS NE1, NE2, NE3, NE4
To control external air, dampers actuators are used, and they are intended to preset an air damper
in a desired position and protect water heating coils against freezing. Depending on control method
for dampers, actuators of the following types are used:
»open/close “on-off” NE1, NE2;
»of continuous operation 0..10V NE3, NE4. Setting of the damper in a particular position is
achieved by supplying control voltage from ZW damper position presetting unit of 0...10V.
Actuator type on/off continuous signal
Supply voltage 230V AC 24V AC
Close / open time 150 sec. 150 sec.
Protection level IP54 IP54
Fig. 1. Damper actuator NE1, NE2 [on-off];
N Neutral 230V AC
Y1 Control signal: open 230V
Y2 Control signal: close 230V
Fig. 2. Damper actuator NE3, NE4 continuous signal
Y Control input 0…10V DV
G0 Systemic zero-point
G Phase, 24V AC
»ZW DAMPER POSITION PRESETTING UNIT for actuators NE3 and NE4
The position presetting unit enables presetting of the damper in any desired position so that the
exact required air ow from the outside is established. The position presetting unit is placed inside
of or on the door of the control box.
Supply voltage 24V AC
Control signal 0...10V DC
Protection level IP42
Fig. 3. ZW damper position presetting unit
Y Control input 0…10V DV
G0 Systemic zero-point
G Phase, 24V AC

16 www.juwent.com.pl
WS Service switch
Intended to switch off the 3~400V supply so servicing can be carried out.
Type WS-3
Main circuits: poles 3-pole
Supply circuit switch 1- and 3-phase current
Rated continuous current 25A
Protection rating IP 65
Fig. 4. WS 3 service switch (3-pole)
11. DEVICE COMMISSIONING
Before commissioning:
»check the unit for mounting
»check if supply voltage is in accordance with data plate
»check additional protection of the unit fan and casing
»check the electric motor for proper connection
»check rotational direction of the fan.
To turn the unit on:
»turn the electric motor supply on
»adjust direction and range of supply air ow using blades on the outlet grille
To turn the unit off:
»turn the fan electric motor supply off
12. REPAIR, MAINTENANCE AND WITHDRAWAL FROM USE
Rolling bearings used in the fan require no regular lubrication. However, it is recommended to
perform a periodical inspection of the condition of motor bearings (fan rotor should rotate freely
without any excessive plays or knocks).
If the unit starts to work with excessive noise, check the fan and the whole unit for proper mounting
(including additional equipment items).
The rotor blades should be cleaned with a damp cloth, after removing the protective meshing, so as
not to allow the rotor to be improperly balanced.
For any disturbances in the unit operation, please consult the technician or technical service.

17www.juwent.com.pl
Do not use high pressure washers for cleaning of the fan.
All maintenance and repair works should be carried out with voltage off.
Also protect the unit from being accidentally turned on by other personnel.
Periodically check the heating coil for cleanliness. If contaminated, blow the heating coil with
compressed air.
Contamination of the heating coil will reduce the air efciency and decrease the unit’s
heating capacity.
Depending on the air pollution level it is necessary to periodically check the lter in the intake box
for contamination. Clean the contaminated lter (by rinsing the lter fabric ~3 times) or replace with
a G3 fabric.
Contamination of the lter will reduce the air efciency and decrease the unit’s heating
capacity.
Once the device is withdrawn from use, handle it to a proper waste treatment plant.
13. TROUBLESHOOTING
Trouble
description Possible trouble cause Troubleshooting
too loud operation
of the unit
minimum distance from the wall or ceiling is not
maintained use distances recommended in the instruction manual
improper revolution direction execute a proper electric connection
improper parameters of the mains use the unit only when the parameters of the mains and
the unit are compliant
air outlet is blocked by outlet grid louvres avoid a signicant closing of outlet grid louvres at high
speed ratios
fan vibrations, the blades rub against xed elements check up the correctness of the fan and fastening reliabi-
lity of other elements of the unit
not centric fastening of the fan in its bearing plate
fan does not work
incorrect or unreliable electric connections check up or correct:
1) compliance of electric connections according to the
diagrams specied in the instruction manual
2) reliability of connections on electric terminals
3) parameters of the mains
improper parameters of the mains (lack of three
phases in three-phase motors)
fan motor is damaged
fan operation control elements are damaged
14. INFORMATION
As to all issues concerning the TERM heating and ventilation units please contact JUWENT Production
Plant or Representatives

18 www.juwent.com.pl
III. WARRANTY TERMS AND CONDITIONS
1. JUWENT Szymański, Nowakowski General Partnership, headquartered in Ryki at 31 Lubelska Str., hereinafter referred to as the
Warrantor, grants the Customer a warranty of proper operation of the unit with reservation of the requirement of its use in accordance
with the conditions determined in the instruction manual and the terms and conditions specied below.
2. The warranty has been granted for a period of 24 months from the purchase date demonstrated in this warranty document with
a possibility of its special extension according to a separate agreement and specied in the Special Warranty Terms and Conditions.
3. The warranty covers the removal of technical defects of the unit arisen as a result of its use in accordance with the instruction
manual, revealed within the warranty period. The warranty provisions are valid in the territory of the Republic of Poland.
4. By virtue of the granted warranty the Warrantor is not liable for the loss of expected prots and costs resulting from a periodical
impossibility of the use of the unit incurred by the Customer.
5. To realize the Customer’s rights resulting from the warranty it is required to deliver the claimed unit with the warranty document
to the Warrantor at his expense.
6. The claimer delivers the unit in an original factory packing, in case there is no factory packing the claimed unit should be delive-
red by the Customer for the repair in a way ensuring a safe transport. The risk of accidental damage of the unit during the transport
burdens always the party that dispatches the parcel.
7. The defects revealed with the warranty period will be removed by the Warrantor free of charge. A method selection of the reali-
zation of obligations resulting from the warranty granted to the Customer belongs to the Warrantor that may remove a defect by the
repair or the replacement of the damaged subassembly or by the replacement of the unit. The property of the unit withdrawn from
service and / or defective subassemblies is transferred to the Warrantor.
8. The warranty is extended by a period for which the Customer has been deprived of a possibility to use the unit.
9. The Warrantor will make efforts that the repair is executed without further delay within the time-limit of up to 14 working days
from the delivery date of the unit. In reasonable cases of which the Customer will be informed by the Warrantor, this time-limit may
be extended, e.g. by the time of provision import or when there is a necessity to execute an expertise or laboratory tests in specialized
institutions.
10. The Warrantor is liable exclusively for the defects inherent in the sold unit. The damages arisen after its sale for other reasons are
not covered by the warranty, in particular:
a) mechanical damages (including also damages caused by microparticles occurring in the working environment of the unit),
thermal damages, chemical damages and aleatory damages or damages caused by the atmospheric factors,
b) damages occurred as a result of non-observance of typical rules or the rules required by the instruction manual related to the
operation and mounting of the unit or the use of the unit against the intended use and other damages caused by the Customer’s
activity or omission,
c) damages being a result of defective operation of the system in which the unit has been built or used,
d) damages occurred as a result of non-execution of the actions to which the Customer has been obliged in accordance with the
instruction manual, e.g. periodical cleaning, maintenance, adjustment, etc.,
e) damages occurred due to the use of materials or parts subject to a normal operational wear other than the materials recom-
mended by the Warrantor in the instruction manual,
f) damages being a result of use of power supply of the unit (of the system in which this unit functions) incompliant with the
standard, and in case the unit is also supplied with water, damages being a result of use of water (supply water and / or boiler
water) with parameters other than the parameters foreseen in the valid standard (PN-93/C-04607),
g) damages occurred as a result of operation and / or maintenance of the unit in a way incompliant with the instruction manual
and / or executed by the unauthorized persons.
11. The warranty does not cover as well:
a) activities executed by the Customer in accordance with the recommendations included the instruction manual of the unit within
the framework of normal maintenance and inspections,
b) travel and work costs of the Warrantor’s service or an entity delegated by the Warrantor in case when a warrant call turns out
to be groundless.
12. An annotation made by a trained employee in the Inspection and Maintenance Document of the unit is a conrmation of time-
-limit holding and range of activities foreseen for the maintenance of the unit.
13. The Warrantor is not liable for damages incurred by the Customer or third parties caused the run of the unit occurred in particular
as a result of non-observance of the afore-mentioned terms and conditions by the Customer.
14. In case the service works are executed by the Warrantor at the place where the unit is mounted, the Customer will make available
a free access to the rooms where the units are located to the Warrantor.
15. In case the units are mounted at the height making an access from the oor surface impossible, the Customer will ensure the
scaffolding compliant with the OHS regulations or mobile lifting platforms and vertical transport equipment.
16. The equipment from the electric and / or hydraulic system is disassembled by the Customer.
17. The claims should be lodged at the Warrantor’s address in writing / by fax / email using a service notication form.
18. The Warrantor refuses to execute the warranty activities (periodical service works or repair) in case the price for the unit or pre-
vious service work is not paid for the benet of the Warrantor.
DATE OF SALE STAMP AND SIGNATURE
Special Warranty Terms and Conditions:
Warranty period extension up to ........... months.
Other:
STAMP AND SIGNATURE

19www.juwent.com.pl
TYPE OF UNIT:
FACTORY NUMER:
YEAR OF PRODUCTION:
IV. UNIT STARTUP REPORT
Date of
startup
Executor of startup
stamp / name and signature
Motor
current
[A]
User’s representative
stamp / name and signature Remarks
V. INSPECTION AND MAINTENANCE DOCUMENT
Date of
inspection
Executor of inspection
stamp / name and signature Service activity range Remarks
* Inspection of the unit in accordance with the section “Repair and Maintenance” in the instruction manual

20 www.juwent.com.pl
VI. SERVICE NOTIFICATION
Date:
Notication type WARRANTY POST-WARRANTY PAID
Unit’s user (name)
Contact person
User’s address
Phone, fax. and email
Type of unit
Factory No.
Year of production
Startup executed by
Description of defect:
NOTE: AFTER COPYING AND FILLING IN SEND THE NOTIFICATION BY FAX OR EMAIL TOGETHER WITH A
COPY OF THE STARTUP REPORT.
JUWENT Company accepts notications lled legibly and completely.
When the lodged claim is not justied, the claimer will be burdened with service costs.
Date of warranty issue Order No. (company’s stamp)
......................................................... ...........................
This manual suits for next models
1
Table of contents
Other Juwent Fan manuals
Popular Fan manuals by other brands

Hitachi
Hitachi RCIM-0.4FSRE Installation & operation manual

Hatari
Hatari Tower Classic user manual

Oxygen 8
Oxygen 8 NOVA Series Operation and maintenance

VENTILATORS
VENTILATORS VH30100 Installation and operation manual

Colasit
Colasit CHVN 315 operating manual

Ventamatic
Ventamatic MaxxAir HVFF 20 Instruction & owner's manual

Panasonic
Panasonic Intelli-Balance 100 Service manual

Kichler Lighting
Kichler Lighting BASICS PRO SELECT 330017MWH instruction manual

Vortice
Vortice VORT ARTIK CASSETTE UI Instruction booklet

minkaAire
minkaAire 52" user manual

Suntec Wellness
Suntec Wellness KLIMATRONIC CoolBreeze 9000 TOSlim+ manual

Evolar
Evolar EVO-16T Installation and operation manual