
4
NOT fully tighten the screws. Doing so will make it
difficult to install the vertical posts and waste time.
4. Use a Phillips Head Screwdriver and (4) M6 Self
Tapping Screws to install the two(2) Vertical Posts to
the Base Feet. See Figure 1. Tighten all twelve(12) of
the installed M6 Self Tapping Screws. Be careful not
to strip the screws.
5. Use a 17mm Ratchet/Socket Driver, wrench, and
the twelve(12) M10 Hex Bolts with included M10
Washers and M10 Hex Nuts to mount two(2) Base
Supports to each Base Foot and Vertical Post
assembly. See Figure 2. NOTE: Ensure a washer is
installed between the bolt and support and between
the nut and support. It is considered best practice to
install the bolts from the outside in, with the nuts on
the interior of the rack.
6. Remove the two(2) M10 Hex Nuts and M10 Washers
attaching the Upper Beam to the installed rack.
Then use a 17mm Ratchet or Socket Driver and
wrench and the those two(2) M10 Hex Nuts and M10
Washers and two(2) M10 Hex Bolts with included
washers and nuts from the Extension Rack kit to
mount the beam marked “UPPER” to the Extension
Rack and installed rack base and post assembly.
7. Remove the two(2) M10 Hex Nuts and M10 Washers
attaching the Lower Beam to the installed rack.
Remove the label that corresponds to the appliance
that will be mounted from the Extension Rack post
assembly. Then use a 17mm Ratchet or Socket
Driver and wrench and the two(2) removed M10 Hex
Nuts and M10 Washers and two(2) M10 Hex Bolts
with included M10 Washers and M10 Nuts from
the Extension Rack kit to mount the beam marked
“LOWER” to the Extension Rack and installed rack
base and post assembly. NOTE: Ensure the lower
beam is mounted in the proper location for the
appliance to be installed to the rack. Failure to do so
will result in wasted time.
8. Use a rubber mallet to
install the end cap on the
vertical post. See Figure
5. If installing a single
Extension Rack, rack
installation is complete.
See Figure 6. Ensure all
nuts and bolts and screws
are tightened.
9. Repeat the steps included
in this Installing an
Extension Rack section
for each additional
Extension Rack. Figure 6 - Installed Main Rack
and Extension Rack
■ Installing an Extension Rack :
1. Move the rack components to the installation
location. Ensure you have all the components for the
installation. NOTE: DO NOT lose these components.
Replacements ARE NOT included in this kit.
2. Set the Base Feet in the installation location. Verify
finished installation clearances will meet the service
clearance requirements of the appliance(s) to be
mounted on the rack.
3. Use a Phillips Head Screwdriver and eight(8) M6 Self
Tapping Screws to install the four(4) Angle Supports
to the two(2) Base Feet. See Figure 1. NOTE: DO
Washers and M10 Hex Nuts to mount the beam
marked “UPPER” to each Base and Post assembly.
See Figure 4. NOTE: If installing an Extension
Rack, install the bolts on the exterior vertical post
from inside the post out, and do not tighten down
the bolts. Tighten the nuts by hand to keep the post
stable. See Figure 3.
7. Observe the posts. Labels marked “ALL TANKLESS
WATER HEATERS”, “80 – 140kBTU APPLIANCES”,
and “175 – 199kBTU APPLIANCES” cover the
upper lower beam mounting holes. Remove the
label that corresponds to the appliance that will
be mounted. Then use a 17mm Ratchet or Socket
Driver and wrench and the four(4) M10 Hex Bolts
with included M10 Washers and M10 Hex Nuts to
mount the beam marked “LOWER” to each base
and post assembly. NOTE: Ensure the lower beam
is mounted in the proper location for the appliance
to be installed to the rack. Failure to do so will result
in wasted time. NOTE: If installing an Extension
Rack, install the bolts on the exterior vertical post
from inside the post out, and do not tighten down
the bolts. Tighten the nuts by hand to keep the post
stable. See Figure 3.
8. Use a rubber mallet to install
the two(2) End Caps on the
Vertical Posts. See Figure 5.
9. If installing a single Main
Rack, rack installation is
complete. Ensure all nuts
and bolts and screws are
tightened.
Figure 5 - Installed End Cap
Figure 3 - Open Ended Bolt Figure 4 - Installed Upper Beam