SUMMARY 2
DIMENSIONS 3
WARNING 4
SHIPPING 4
WASTE DISPOSAL 4
TRANSPORT AND LIFTING 4
D.P.I. FOR THE OPERATOR 4
WARNINGS FOR THE MAINTENANCE TECHNICIAN 5
PREPARATION OF THE EXCAVATION 6
BOLLARD LAYING PROCEDURE 7
OPERATION OF ASCENT AND DESCENT 10
GBR
SUMMARY

B
D
C
A
C275G AB C D
275
500
481
731
700 931
800 1031
C200G AB C D
200
500
330
735
700 935
800 1035
C140G AB C D
140
500
276
735
700 935
800 1035
GBR
DIMENSIONS

www.mac-srl.it400_Avvertenze-02 200221GBR
The personnel must use the required D.P.I. in these environments of working.
D.P.I. FOR THE OPERATOR
Pictogram
Description SHOES PROTECTION
GLOVES
SUITABLE
CLOTHES
GLASSES /
GLASSES FOR
WELDING
WARNING
• To do a correct installation of the product, is important to read and follow the instructions below carefully.
• The company MAC s.r.l descends any responsibility in the case the manual is not updated.
• In case of manual or components’ modifi cations, it is at discretion of the customer to ask about them.
• It is not allowed reproducing partially or publishing this document without the authorization of the company MAC
S.r.l..
• Any infraction will be prosecuted in accordance with the procedure prescribed by law.
• MAC s.r.l. is exclusive owner of its registered trademark. The brand is affi xed on labels with CE conformity and
on seals and danger adhesives.
• The removal, cancellation or modifi cation of the label MAC s.r.l. is strictly forbidden.
• An improper installation or use of the product may cause damage to people. Everything not expected in these
instructions is not allowed.
• The user must abstain from any attempt to repair or direct intervention. Furthermore, the user must only call
qualifi ed and authorized staff .
• The transit on the bollard must only occur when the device is completely lowered and the traffi c light is green.
• Keep out of reach of children remote controls or any other device of control in order to avoid the accidental
activation of the automation.
SHIPPING
• All the products are accurately checked and tested by the manufacturer before the shipping.
• At the moment of delivery, check if the bollard has been damaged during the transport. Moreover, check that
nothing has been rigged or removed. In case of noticing damages or missing parts, warn the courier and the
manufacturer sending them related photo documentation.
WASTE DISPOSAL
• MAC s.r.l recommends to respect the environment by promoting recycling waste.
• All the components must be disposed following the regulations of the installation’s place.
• Battery, electric and electronic elements may contain noxious and polluting substances. That components must
be removed and consigned to companies specialized in recycling noxious waste as indicated in the directive
2012/19/UE.
TRANSPORT AND LIFTING
• The transport and lifting of the bollard must occur with specifi c equipment and in compliance with safety regulations
in force in the area of the product’s installation and by expert staff .
• Check the effi ciency and the payload of the transportation before to proceed with the bollard’s movement.
• To not cause damages to people or to materials it is necessary to implement any possible precaution. It is
opportune to avoid abrupt movements that may ruin the bollard and cause damages to things or people.
• To lift the bollard or its parts, are needed means of transport with a minimum load larger than the declared weight.
These means of transport must have the CE label with the related certifi cates in force, like cables and lifting
eyebolts.
• To have a better load stability, it is necessary to keep the load as low as possible during the movements.
• Make sure that there are no people not involved in the work nearby during the installation and its operation.

WARNINGS FOR THE MAINTENANCE TECHNICIAN
• The installation must be carried out by competent companies and experts in the fi eld.
• The maintenance technician must be formed and informed about bollard installation.
• The maintenance technician must work using the specifi c protection devices and following the safety regulations
in force in the place where the bollard is installed.
• To not cause damages, the maintenance technician must evaluate carefully the place where the bollard will be
installed and check that all the moving parts are free from obstacles, by also checking that the handlings operate
linearly.
• For what concerns the movement operations, make reference to the “Transport and lifting” chapter.
• MAC s.r.l. is not responsible about the non-compliance of its products and accessories installation methods.
• The maintenance technician must insert the protections against the indirect contacts upstream of the power line,
following the regulations in force according to the installation place.
• Check that upstream of the plant there is a diff erential magnetermic switch with a 0,03 A threshold.
• The control unit main power line must be directly connected upstream of the specifi c main switch, placed inside
the station itself.
• Use standard fl ameproof cables.
• To guarantee a correct power source (230V +/- 10% in movement); the main power line sizing must be at least
3x2,5 mm. Anyway, it must be meditated by the maintenance technician depending on the main switch sizing and
on the distance from the distribution point.
• Check the grounding system is perfectly done.
• The maintenance technician must give to the client/user all the information about the bollard manual handling in
case of emergency and give the user and maintenance manual.

www.mac-srl.it602_IN.Palmo_00 191203
40L
700
h1
GBR
PREPARATION OF THE EXCAVATION
To do a proper installation of our product, we recommend to follow all the points below.
Excavate the land with the measures and depth indicated below.
Plan view Sectional view
Make sure that the interested soil for the installation of the product is draining by pouring 40 liters of water into the
excavation.
If after 10 minutes the excavation has emptied, means that it isn’t necessary to install a sewage network.
Individual cases should however be evaluated, considering the soil compliance and the meteorological situations.
Eventually, create a sewer system.
Caution:
This type of system has been thought for land with poor draining qualities, where, digging, water is immediately
found and/or where there is not the possibility to carry everything in a sewer system. The bollard will be collocated
in a waterproof concrete tank so if the water level raises, the bollard remain isolated from the surrounding land.
This drawing shows how to install a well for the discharge of the excessive water from the formwork of the bollard.
All the concrete that covers the bollard and the well should contain special additives that isolate from water.
Even just one well can be installed to suck the water of all the bollards installed.
Little well or sewer network
connection with immersion
pump
Little well with manhole EN124
Sewer network connection
Immersion pump
N.B.:
-1130mm for installation stroke 500
-1330mm for installation PALMO stroke 700
-1430mm for installation PALMO stroke 800

1
2
3
4
200
220
h
mod. B h
Palmo
500 710
700 910
800 1010
GBR
BOLLARD LAYING PROCEDURE
Proceed with the realization of the drain of the
rainwater through the lay of a PVC pipe with
100mm diameter. This pipe must be connected
to the sewer system or in alternative to a well
equipped by an emptying system with a greater
depth.
Insert gravel with grain 22/32 mm diameter and
220m height. In order to avoid “retreats of settling”,
it is advisable to compact the gravel.
Insert a geotextile layer (gr. 300) on the compacted
gravel.
Put the PVC pipe (diameter of 100 mm and length
200mm) in the middle of the dig on the geotextile (the
PVC pipe is necessary for the passage of the rain-water).
The size “h” are very important to ensure
that the formwork protrudes 20mm from the
trampling line.

www.mac-srl.it802_IN.Palmo_00 191203
P.01 0.00
+ 0.02
P.01
u.m.=m
5
6
7
8
3
12
GBR
Collocate the formwork supplied taking care to
place it fl at (centre the bubble) compared to the
road level.
Predispose a corrugated tube ø80 for the passage
of the electrical power cables in the pre-holes of
the formwork.
CAUTION: place the foundation formwork
based on the direction of traffi c as in the view
from the above.
N.B:
Position the bollard so as to protrude 20mm from
the fl oor level (in order to limit the enter of rainwater
in the little well).
Gradually insert the concrete verifying that the hole is
fi lled uniformly. Deal the concrete so as to not to leave
empty pockets of air, especially below the bollard.
1. Screw off the 4 (four) bolts (using the Allen key).
2. Extract the trampling platform.
3. Insert the eyebolts.
4. Extract the extractable structure.
To lift the extractable structure, it is necessary a lifting arm.
Lead the cables from the cockpit to the buried formwork.

9
u.m.=m
0.00 0.00 + 0.02
P.02
+ 0.02
P.02
u.m.=m
+ 0.00
+ 0.00
+ 0.02
GBR
N.B. Make the connection
N.B.:
Remove the protections of
polystyrene from the runner
Make sure that the concrete is solidifi ed before to insert the extractable structure.

www.mac-srl.it10 02_IN.Palmo_00 191203GBR
OPERATION OF ASCENT AND DESCENT
Ascent of the bollard:
• open the cover on the head of the bollard
• insert the key supplied
• push the head of the bollard and at, the same time, turn the key counterclockwise until the
stop (be careful, in the opening mechanism there is a gas spring)
• the bollard goes up.
Descent of the bollard:
• open the cover on the head of the bollard
• insert the key supplied
• push the head of the bollard and at, the same time, turn the key counterclockwise until the
stop (be careful, in the opening mechanism there is a gas spring)
• lower the bollard by pushing it down until its closing.


www.mac-srl.it12 02_IN.Palmo_00 191203GBR
This manual suits for next models
2
Table of contents
Other MAC Measuring Instrument manuals
Popular Measuring Instrument manuals by other brands

LightScout
LightScout 3415F product manual

TSI Instruments
TSI Instruments Sizer 3310A instruction manual

Omega Engineering
Omega Engineering HHP-2000 Series operating instructions

sauermann
sauermann Si-RM3V Simplified user manual

PCB Piezotronics
PCB Piezotronics 080C10 Installation and operating manual

Kanomax
Kanomax DALT 6900 Operation manual