Marchetti SMART TOWER Specification sheet

www.marchetti.eu
Instructions Manual EN 1298 – IM – it x en
Mobile access towers must only be used for nishing, maintenance and similar works. This instructions
manual contains important instructions on use, maintenance and safety of the mobile access tower;
the operator must be completely aware of them before use. Strictly complying with this manual
means working in compliance with the provisions of the current standard on health and safety in the
workplace Leg. Decree. 09.04.2008 no. 81.
Code 11211
DOC. CUSTOMER ASSISTANCE
N. 136 REV. 0 DEL 23/04/2018
MARCHETTI S.r.l.
Via Piemonte, 22
06062 Città della Pieve - Perugia - Italy
Tel. + 39 0578 20348 - Fax + 39 0578 226488
info@marchetti.eu
www.marchetti.eu
Instructions for use
and maintenance
European standard EN 1004
The products identied in this handbook have
been manufactured by MARCHETTI s.r.l. With
QUALITY SYSTEM MANAGEMENT, certied by Tuv
Italia, in accordance with ISO 9001
MOBILE ACCESS TOWER
SMART TOWER

2
www.marchetti.eu
ATTENTION:
• Read and understand this manual in its
entirety.
• Follow the instructions as indicated.
• Before any installation, verify the integrity
of each individual component.
Donotusedamagedornotwholecomponents
!
The mobile access tower on wheels is made
according to the standards.
Any changes made by others invalidate the
manifacturer’s responsibility.

3
ENG
TABLE OF CONTENTS:
1. REFERENCE STANDARDS pag. 4
2. DESIGNATION, CLASS, CAPACITY pag. 4
3. DECLARATION OF CONFORMITY pag. 5
4 GENERAL INFORMATION pag. 6
4.1 Access to working surfaces pag. 6
4.2 Maximum heights of the conguration EN 1004 pag. 6
5 IDENTIFICATION pag. 7
Table of elements composing the congurations A1 - A2 - A3 pag. 7
To create congurations with nal tower H=0.85 m (A1T-A2T-A3T) pag. 7
simply add the following elements
“SMART TOWER”TOWER DESIGN pag. 8
CONFIGURATIONS UNI EN 1004 pag. 9
6. ASSEMBLY AND DISMANTLING pag. 10
6.1 General information pag. 10
6.2 Preliminary tests pag. 10
6.3 Assembly instructions pag. 10
6.4 Dismantling instructions pag. 13
7. STABILITY pag. 13
8. USE pag. 13
8.1 Preliminary controls pag. 13
8.2 Use pag. 14
8.3 Movement procedure pag. 14
9. CHECKS, CARE AND MAINTENANCE pag. 14
• INSTRUCTIONS FOR USE AND MAINTENANCE pag. 15
Legislative Decree 09.04.2008 no. 81
10. GENERAL INFORMATION pag. 16
10.1 Congurations table according to Leg. Decree 81/08 pag. 16
10.2 Access to working surfaces pag. 17
10.3 Information completion pag. 17
• CHECK LIST pag. 18

4
www.marchetti.eu
1. REFERENCE STANDARDS
- Leg. Decree 09.04.2008 no. 81 (O.G. no. 101 dated 30.04.08) “Consolidating act on health and
safety in the workplace”.
- EN 1004 (July 2005) “Mobile access and working towers) composed of prefabricated elements.
Materials, dimensions, design loads, safety and performance requirements”;
- EN 1298 (February 1996) “Mobile access towers. Regulations and guidelines for preparation of an
instructions manual”;
- Leg. Decree 06.09.2005 no. 206 (O.G. no. 235 on 08.10.05 – Ordinary Supplement no. 162)
“Consumers’ Code”.
2. DESIGNATION, CLASS, CAPACITY
SMART TOWER mobile access tower EN 1004 – 3 – 5 / 5 XXCD
manufactured in compliance with Leg. Decree 81/08 and Technical Standard EN 1004;
Class of loads distributed uniformly equal to “3” (2.0 KN/m2);
- Maximum height permitted of the work platform equal to 5,50 metres both outside and inside
buildings. Inside is intended as without wind.
- The overall load permitted for each tower is therefore 200 kg.
- The maximum number of surfaces loaded at the same time is 2.
- The sum of the loads relating to each surface must not exceed the overall value of the load
permitted for the scaolding.

5
ENG
3. DECLARATION OF CONFORMITY
www.marchetti.eu
DECLARATION OF CONFORMITY
MARCHETTI s.r.l.
with headquarters in Città della Pieve (Pg) - Via Piemonte, 22:
- that the mobile tower SMART TOWER was manufactured in
compliance with Leg. Decree 09.04.2008 no. 81 and in particular
the Technical Standard EN 1004 (July 2005)
- that it is manufactured in compliance with the prototype which
has surpassed rigidity testing, pursuant to Appendix “A” of the
Technical Standard EN 1004 (2005) and that it was subject, with a
positive outcome, with the ASSESSMENT as outlined in point 13 of
the Technical Standard EN 1004 (2005) at the:
UNIVERSITY OF PERUGIA Certicate no. Marc 141
- the identication marking is outlined on all specimens of the
products and on the Instructions Manual drafted according to
specications in Technical Specication EN1298 (point 9 of the
Technical Standard EN 1004).
DECLARES

6
www.marchetti.eu
4. GENERAL INFORMATION
4.1 Access to work platform
Access to the work platform can only take place inside the tower using one of the following methods:
- vertical rung ladder, composed of beams on the side frames of the structure
- inclined rung ladder, internal
- inclined step ladder, internal.
4.2 Maximum heights of the conguration EN 1004
The maximum height of the work platform without using the stabiliser braces is 1.90 metres (maximum
tower height 3,25 metres).
The maximum height of the work platform using the stabiliser braces is 5,50 metres both inside and
outside buildings.
The minimum open height between the work platform is 1.90 metres.
The maximum vertical distance between the work platform is 4.20 metres.
The maximum vertical distance between the oor and the rst level is 4.60 metres.

7
ENG
5. IDENTIFICATION
EN 1004 - Class “3” (2.00 KN/m2)
Overall permitted load 200 kg
Maximum number of surfaces loaded simultaneously
Table of elements composing the congurations A1 - A2 - A3 - A4
Code Component Elements Weight CONFIGURATIONS
Kg A1 A2 A3 A4
21386 Smart più 28,00
1 33815 Foldable base 17,00 1 1 1 1
2 21936 Horizontal brace 4,50 0 1 1 1
3 33831 Work platform 10,5 0 0 0 0
21387 Tower 9,00
4 33835 Frame 4,50 0 2 4 6
5 21936 Horizontal brace 4,00 0 2 4 4
21388 Work platform with toeboards 17,5
6 33831 Work platform 10,5 1 1 1 2
7 11182 Long toeboards -166 3,00 2 2 2 4
8 11051 Short toeboards-75 0,50 2 2 2 4
20998 Stabilizers kit 16,00
9 20807 Stabilizers 4,00 0 4 4 4
To create congurations with nal tower H=0.85 m (A2T-A3T-A4T)
simply add the following elements
Code Component Elements Weight CONFIGURATIONS
Kg A2T A3T A4T
21393 Terminal tower 3,00 1 1 1
10 Final frame 1,50 2 2 2
11 Horizontal brace 4,00 2 2 2

8
www.marchetti.eu
“SMART TOWER”TOWER DESIGN
33815 FOLDABLE BASE
21393 FINAL TOWER
21936 HORIZONTAL BRACE
33831 WORK PLATFORM
20998 STABILIZERS
21387 TOWER 21388 WORK PLATFORM
WITH TOEBOARDS

9
ENG
CONFIGURATIONS EN 1004
A2
H Tower = 3,25 m
H Work = 1,90 m
A3T
H Tower = 5,16 m
H Work = 4,00 m
A2T
H Tower = 3,66 m
H Work = 2,50 m
A4
H Tower= 6,25 m
H Work = 4,90 m
A3
H Tower = 4,75 m
H Work = 3,40 m
A4T
H Tower = 6,66 m
H Work = 5,50 m
Smart Più
H Tower = 1,75 m
H Work = 1,00 m
A1
H Tower = 1,75 m
H Work = 1,00 m

10
www.marchetti.eu
6. ASSEMBLY AND DISMANTLING
6.1 General information
a) For assembly and dismantling of the mobile access towers, at least 2 people are necessary and it
is indispensable they are familiar with the assembly and use instructions;
b) Based on the height which must be reached, choose to set up one of the congurations outlined
on page 9. The list, the weight and quantity of the elements necessary for assembly are outlined
on page 7.
c) No damaged components must be used;
d) Only original parts must be used as indicated by the manufacturer.
6.2 Preliminary tests
a) The surfaces on which the tower is assembled and subsequently moved (if necessary) must be
capable of supporting the weight, it must be perfectly level and guarantee distribution of the
load, perhaps using planks or other equivalent devices;
b) Absence must be ensured of obstacles;
c) The assembly operations can only start in the absence of wind;
d) All the elements must be checked, accessory tools and safety equipment to assemble the tower
are available on site;
e) The verticality of the mobile towers must be checked with the level supplied.
6.3 Assembly instructions
Having conducted the checks on par. 6.2, proceed to assemble the base section:
A) Open completely the foldable base.
B) Place the work platform at the desired height.
Table of contents
Other Marchetti Rack & Stand manuals
Popular Rack & Stand manuals by other brands

Salamander
Salamander Acadia AC/W/L400/WH Assembly instructions

Fohhn
Fohhn VAT-09 Mounting instruction

ricoo
ricoo FS0522 quick start guide

AMSOIL
AMSOIL BMK-22 Installation and service instructions

Kargo Master
Kargo Master 48220 installation guide

Milestone AV Technologies
Milestone AV Technologies SIMPLICITY SLF2 installation instructions












