
INTRODUCTION
1
Polishedstainlesssteelcabinetbaseshallbeofmodular
designtomatchotherMarketForgecookingequipment,
andequippedwith6”152mmstainlesssteellegs,adjust-
ablebulletfeet,reinforcedstainlesssteelcounter-topand
stainlesssteellift-offfrontpanel.
Stainlesssteelsteamcoilgeneratorequippedforopera-
tionat15PSI(1kg/cm2).Unitshallincludeasstandardan
automaticdrain,coldwatercondenser,automaticwater
levelcontrol,lowwatercutoff,pressurecontrol,airvent,
andasafetyreliefvalve.
Steam generator shall be National Board Registered,
andshallbesuitableforinstallationtightagainstanon-
combustablewall.SteamgeneratorshallbeASMEcon-
structedof15PSIoperation.
Steam generator shall be automatically lled with cold
water and brought to pressure when heat and water
switches are turned on and automatically drain under
pressureshallautomaticallycondenseexhaustedsteam
intowaterbeforereleasingittodrain.
OPERATION:
Unitequippedforoperationwithminimumincomingpres-
sure of 20 PSI (1.4kg/cm2) and a maximum incoming
pressure of 50 PSI (3.5kg/cm2), producing a minimum
outputof2.6BHPand88poundsofsteamperhour.
INSTALLATION
WARNING: Read before opening the shipping contain-
ers. Do not at any time lay the equipment down on its
back,side,toporfront.Todosomaydamagetheequip-
mentandinvalidatethewarranty.
RECEIVING INSTRUCTIONS:
Inspect the equipment before signing the bill of lading.
The equipment supplied was tested and inspected be-
foreshipment.Thecarrieracceptedit ascompleteand
withoutdamage.
Thismerchandisebecameyourpropertywhenitwasac-
ceptedbythecarrieratthefactory.MarketForgecannot
assumeresponsibilityforlossordamageduringtransit.
Forthisreason,youshouldimmediatelyinspectforvis-
ibleandconcealeddamageorshortagesbeforesigning
forshipmentasfollows:
Countthenumberofcartonsandpackagesreceived
tobesuretheycoincidewiththebilloflading.
Visuallycheckallcartonsforexternaldamage.
Removeallcartonsfromtheirskidstoexamineequip-
mentforconcealeddamage.Thecartonisnailedand
strappedtotheskid. It willbenecessarytocut the
strapsandpryoffthecontainer.
Afterinspection,replacethecartonsovertheequip-
mentontheskids toprotectandsecurethe equip-
mentuntilitisreadyforinstallation.
Sign for shipment if all is in order. Note shortages,
externalandconcealeddamage,ifany,onthebillof
lading before accepting a partial or damaged ship-
ment.
Ifnecessary,contactthecarrierimmediatelytolea
claim.Allclaimsmustbeledbythereceiver.
1.
2.
3.
4.
5.
6.
Do not remove the cartons or the skids from the
cookingequipmentuntiltheunithasbeentransport-
edthroughthebuildingtotheactualset-uplocation.
Thecartonsshouldremain.ontheequipmentaspro-
tectionagainstdentsandscratches.
SETTING IN PLACE:
Installing legs:
Somemodelsareshippedwithoutlegs.Aseparatecar-
ton will contain the legs. If your model is received this
way be sure to follow the installation instruction sheet
packedwiththelegs.
Leveling:
Inorderfortheboilertodraincorrectlyitisimportantto
usealeveloncabinettop,bothleftandrightandfront-
to-back.Ifnotleveladjustfeet.Oncompartmentcookers
checkinteriorshelvestobelevel.
Panels and Doors:
Panelsanddoorsforthecabinetmaybeshippedsepa-
rate.Refertoinstallationinstructionsenclosedwithpan-
elsanddoorsformethodofattaching.Itisrecommended
thatpanelsanddoorsbeinstalledaftermechanicalcon-
nectionsaremadetoavoiddamage.
IMPORTANT INFORMATION ON STEAM COIL STEAM
GENERATORS TO STEAM FITTER:
The-useofsteamcoiloperatedequipmentisincreasing,
anditisimportantthatyouareawareofboththeadvan-
tagesandthelimitationsofthisequipment.
Asteamcoilgeneratorassuresasupplyofcleansteam,
andisgenerallyrecommendedwhensteamisavailable
7.