
5
7
6
8
+ Position plywood onto frame and pre-drill
holes before using self-tapping screws.
+ Using a 5/16” socket head, screw the boards
to the metal frame, avoiding the metal joints
+DO NOT force self-tapping screws
into the frame
+ Fasten eight 2” x 4” cross members onto
legs on each side BEFORE attempting to
ip platform upright or move it around
+Secure it to the ground
+ Flip frame back over so leg tubes are down.
Recommendation: use Liquid Nails in
addition to the screws in Step 6 to attach
plywood to the frame to prevent squeaks
+ Flip frame over to attach Nex-Level Mounts
into receiver brackets; the open slots should
face the middle of frame
+ Bolt mounts to frame
+ Lag Screw 4” x 4” wood pieces into
receivers using 9/16” socket
x34
x16
x4
Page 2/2www.MaverickHunting.com
WATCH ASSEMBLY VIDEO
Scan the QR code to watch the assembly
and installation of the Nex-Level® Floor
Base, Platform and Ladder.
08/22
E
E
E
E