
A. Grab Bar
1. Confirm contents of the box before installation. Contact us immediately at
sales@mcombo.com if any parts are missing or damaged.
Note:
Expansion bolts are for concrete wall and wood screws for wood structure.
If the supplied screws are notsuitable, you must select appropriate ones.
For dry wall, tile, acrylic, fiberglass or other ''hollow'' wall surfaces, wood
blocking/studs are always required for safety (not included).
2. Tools Required (not included): Electric drill, 10mmdrill, masonry drill bit (for
tiled walls), tape measure, pencil, stud finder,level measuring instrument.
Step 1
Step 3
Drill marked holes with 10mm drill.
(Always check for hidden cables and
pipework before drilling and take extreme
care if there is any water in the working
area.)
Step 2
Mark screws holes.
Consider mounting height referring to
user's requirement and the area on the
wall of grab bar in both up and down
positions to avoid hitting other objects.
Determine screw hole locations
Note: Make sure the top is level with
the floor.
Use a level measuring instrument
if necessary.
Place grab bar against the wall;
Lining up the pre-drilled holes;
Insert expansion bolts/wood screws into
screw holes.
HELLO,
Thank you for purchasing this Mcombo® Flip Up Grab Bar.
The grab bar is designed for the purpose of facilitating the movement of elderly or
disabled people.
It can be used beside a toilet, pathway or bedroom and can support a maximum weight
of 300lbs.
It offers people new options for independent living by providing outstanding comfort and
convenience.
INSTALLATION STEPS
B. Hex Socket Expansion Bolts
(M8×70mm) × 4
C. Wrench
E. Plastic Screw Cover×2
Ø11mm
Ø0.43"
70.75mm/2.79"
Ø11mm
0.433in
70mm/2.76"
208mm/8.20"
145mm/5.71"
M8×70 Expansion Bolts/
M8×100 Wood Screws
D. Wood Screw(M8×100mm)×4
99.80mm
3.93"
615mm/24.21"
145mm/5.71"