Micron 4Wx2H User manual

www.microndisplaysolutions.com
Video Wall
Installation Instructions
4Wx2H, 5Wx2H

Video Wall Installation Manual – 4WX2H, 5WX2H Page 2
Rev. 09/2019
Table of Contents
Important Safety Instructions.................................................................................................................................... 3
Landscape Configuration Types................................................................................................................................. 4
Package Contents, included and optional items ................................................................................................... 5, 6
Step 1. Attaching Mounting Brackets and Key Measurements........................................................................... 7, 8
Step 2. Inserting Square Nuts into Rails................................................................................................................... 9
Step 3. Building Frame Structure.................................................................................................................... 10 - 13
Step 4. Determining Reference Height and Fastening First Row of Wall Brackets ........................................ 14 - 16
Step 5. Mounting the Frame Structure.................................................................................................................. 17
Step 6. Ensuring Frame Structure is Straight and Plumb....................................................................................... 18
Step 7. Mounting Video Monitors to Frame Structure.......................................................................................... 19
Step 8. Video Monitor Alignment.................................................................................................................... 20, 21
Step 9. Installing Monitor Security Locks (Optional Item)..................................................................................... 22
Step 10. Accessing behind Monitors and Servicing Monitors ........................................................................... 23, 24
Warranty.................................................................................................................................................................. 25

Video Wall Installation Manual – 4WX2H, 5WX2H Page 3
Rev. 09/2019
Important Safety Instructions
Use the following safety guidelines to help protect you during the installation, especially with installing
the monitors to mount and when access to monitors is required to ensure your own personal safety.
•Read all the installation instructions before installing the mounting solution.
•Read and follow all important safety instructions.
•Depending on size of video mount solutions, two (2) or more persons may be required for
installation.
•Please ensure all safety precautions are followed when working with heights.
CAUTION: Before you begin any of the installation procedures read and follow the
warnings and important safety instructions within the manual.
WARNING! FAILURE TO FOLLOW INSTRUCTIONS ON ACCESSING BEHIND
MONITORS AND SERVICING MONITORS MAY RESULT IN POSSIBLE PERSONAL
INJURY AND DAMAGE TO MONITORS DUE FROM FALLING!
WARNING! BEFORE INSTALLING THE MOUNT, ENSURE THE WALL IS
STRUCTUALLY SOUND AND ABLE TO PROPERLY SUPPORT THE COMBINED
WEIGHT OF MOUNT AND MONITORS!

Video Wall Installation Manual – 4WX2H, 5WX2H Page 4
Rev. 09/2019
Configuration

Video Wall Installation Manual – 4WX2H, 5WX2H Page 5
Rev. 09/2019
Package Contents - Included
Description Configuration Qty Picture
Top Rail
4W x 2H
(all same size)
4
Part A
5W x 2H
(2 long, 2 short)
Bottom Rail
4W x 2H
(all same size)
4
Part B
5W x 2H
(2 long, 2 short)
Middle Rail 4W x 2H
5W x 2H 1
Part M
Side Rail - Black 4W x 2H
5W x 2H 2
Part S
Wall Brackets
(Depending on size of
video wall either large
or small brackets are
supplied
4W x 2H 16
Part E
5W x 2H 18
Panel VESA Bracket
(includes micro
adjustment screw)
4W x 2H 16
Part D
5W x 2H 20
Square Nut with
Screw
4W x 2H 16
Part N Part N2
5W x 2H 18
Mounting Hardware Kit
4W x 2H 8
Part H
5W x 2H 10
Shim Kit
(Assorted sizes)
4W x 2H
5W x 2H 2
Part SK

Video Wall Installation Manual – 4WX2H, 5WX2H Page 6
Rev. 09/2019
Kick Stand 4W x 2H
5W x 2H 4
Part KS
Monitor Security
Lock
4W x 2H 4
Part MD1026
5W x 2H 5
N/R = Not Required
Optional Items
Description
Part Number
Qty
Picture
Laser Installation Kit MD1025 1
Cable Tie Clamp MD1006 10
Nut Holder for M6
Nut MD1007 10
Cover Strips
(6’ lengths)
MD1001 - Grey
MD1002 - Red
MD1003 - Alum
MD1004 - Black
MD1005 - Yellow
1
Kick Stands MD1011 1
Shims
MD1022 - 1/8”
MD1023 - 1/4”
MD1024 - 1/16”
6
M6 Turn Nut & Screw
(For mounting
electrical boxes and
brackets)
MD1014 –M6
MD1015 – M8
10

Video Wall Installation Manual – 4WX2H, 5WX2H Page 7
Rev. 09/2019
Step 1 – Attaching mounting brackets and key measurements
Instructions
Diagrams
•
Remove monitors to be installed from
their cartons and attach the Panel VESA
Brackets (Part D) to back of monitors at
the VESA mounts as shown in figure 1A.
Mounting hardware is provided (Part
F).
Note: If monitor orientation is portrait
mode attach Mounting Brackets to
back of monitors with that orientation.
•The mounting hardware consists of
various lengths of M6 and M8 screws to
accommodate different manufacturer
specifications.
•If M6 screws are required, you will
need to use the white M8 sleeves by
inserting an M6 screw into the white
sleeve and then attaching Panel VESA
Bracket to back of monitor. See figure
1B.
Fig. 1A
Fig. 1B
•Measure the difference between top of
monitor and bottom of top mounting
bracket as shown in figure 1C.
Distance: _________
This is referred to as measurement A.
Fig. 1C
•
Measure the total height of monitor as
shown on figure 1D
Distance: _________
This is referred to as measurement B.
Fig. 1D

Video Wall Installation Manual – 4WX2H, 5WX2H Page 8
Rev. 09/2019
•Measure the distance between bottom
of upper monitor mount clip to centre
of micro adjustment screw as shown in
figure 1E.
Distance: _________
This is referred to as measurement C.
Fig. 1E
Mounting point for top rail
Mounting point for bottom rail
VESA points of panel

Video Wall Installation Manual – 4WX2H, 5WX2H Page 9
Rev. 09/2019
Step 2 –Inserting Square Nuts into rails
Instructions
Diagrams
•
Find a flat surface area, ideally on floor,
to build the entire frame structure.
•With each Top and Bottom Rail (for
5Wx2H use longest rails), slide the
Square Nut (Part N) into bottom T-slot
for each rail supplied. See figures 2A
and 2B.
•Insert the following number of Square
Nuts into each top and bottom rail as
indicated below:
Model
Top Rail
Bottom Rail
4W x 2H
3
1
5W x 2H
4
2
•The Square Nuts will be loose inside the
rail for time being.
Fig. 2A Fig. 2B

Video Wall Installation Manual – 4WX2H, 5WX2H Page 10
Rev. 09/2019
Step 3 – Building Frame Structure
•Position the Top Rails (Part A), Bottom
Rails (Part B), Side Rail (Part S) and
Middle Rail (Part M) as shown in figure
3A.
•Slide the Top Rail (Part A) into the T-slot
of both Side Rail (Part S) and Middle
Rail by sliding the QC connector into
the Side Rails. See figure 3B.
IMPORTANT: Ensure the Square Nuts
previously inserted in bottom of rails do
not fall out.
•The Top Rail must be positioned the
same distance as measurement A from
the very top of Side Rail. See figure 3D.
Example:
If measurement A is 5cm, then the Top
Rail must be positioned 5 cm from top
of Side Rail.
•Once in place, tighten the hex bolt that
is on the left side of Top Rail using a
6mm Allen wrench (not supplied). See
figure 3C.
IMPORTANT
Do not tighten the hex bolt on right side
yet.
Fig. 3A
Fig. 3B Fig. 3C
Fig 3D

Video Wall Installation Manual – 4WX2H, 5WX2H Page 11
Rev. 09/2019
•
Slide the Bottom Rail (Part B) into the T-
slot of both Side Rail (Part S) and
Middle Rail by sliding the QC connector
into the rails from the bottom. See
figure 3E.
IMPORTANT: Ensure the Square Nuts
previously inserted in bottom of rails do
not fall out.
•Position the Bottom Rail so the distance
between upper part of Top Rail and
centre of Bottom Rail is same as the
measurement C. See figure 3F.
Example:
If measurement C is 30cm, then the
centre of Bottom Rail must be
positioned 30 cm from top of Top Rail.
•Once in place, tighten the hex bolt that
is on the left side of Bottom Rail using a
6mm Allen wrench (not supplied). See
figure 3G.
IMPORTANT
Do not tighten the hex bolt on right side
yet.
Fig. 3E
Fig. 3F Fig. 3G
•Slide the 2nd Top Rail (Part B) into the
T-slot of both Side Rail (Part S) and
Middle Rail (Part M) by sliding the QC
connector into the rails from the
bottom. Same as in previous step.
IMPORTANT: Ensure the Square Nuts
previous inserted in bottom of rails do not
fall out.
•Position the 2nd Top Rail so the
distance between top of 1st Top Rail
and top of 2nd Top Rail is same as the
measurement B. See figure 3H.
•Once in place, tighten the hex bolt that
is on the left side of 2ndTop Rail using a
6mm Allen wrench (not supplied).
Same as in previous step.
IMPORTANT
Do not tighten the hex bolt on right side
yet.
Fig. 3H

Video Wall Installation Manual – 4WX2H, 5WX2H Page 12
Rev. 09/2019
•
Slide the 2nd Bottom Rail (Part B) into
the T-slot of both Side Rail (Part S) and
Middle Rail (Part M) by sliding the QC
connector into the rails from the
bottom. Same as in previous step.
IMPORTANT: Ensure the Square Nuts
previous inserted in bottom of rails do not
fall out.
•Position the 2nd Bottom Rail so the
distance between top of 1st Bottom
Rail and top of 2nd Bottom Rail is same
as the measurement B. See figure 3I.
•Once in place, tighten the hex bolt that
is on the left side of 2nd Bottom Rail
using a 6mm Allen wrench (not
supplied). Same as in previous step.
IMPORTANT
Do not tighten the hex bolt on right side
yet.
Fig 3I
•Verify and adjust rails on Middle Rail on
right side so that all the distances are
exactly the same as those on left Side
Rail. See figure 3J1.
•Once spacing and measurements are
confirm, tighten all the hex bolts on
right hand side of rails to the right Side
Rail.
Fig 3J1

Video Wall Installation Manual – 4WX2H, 5WX2H Page 13
Rev. 09/2019
•The next section of Top Rails (Part A),
Bottom Rails (Part B), and Side Rail
(Part S) needs to be assembled similar
to previous section assembly. Only
difference is the same Middle Rail will
be used that was used previously. See
figure 3U.
NOTE:
Do not forget that with each Top and
Bottom Rail, slide the Square Nut (Part N)
into bottom T-slot for each rail supplied.
See figures 2A and 2B.
•Insert the following number of Square
Nuts into each top and bottom rail as
indicated below:
Model
Top Rail
Bottom Rail
4W x 2H
2
1
5W x 2H
2
1
•The Square Nuts will be loose inside the
rail for time being.
Fig. 3U
IMPORTANT: Ensure the Square Nuts
previous inserted in bottom of rails do not
fall out.
•Once each Top and Bottom Rail is in
place, tighten the hex bolt that is on
the left side of rails using a 6mm Allen
wrench (not supplied).
•Verify and adjust rails on the right Side
Rail so that all the distances are exactly
the same as those on Middle Rail on
left side. See figure 3V.
•Once spacing and measurements are
confirm, tighten all the hex bolts on
right hand side of rails to the right Side
Rail.
Fig. 3V

Video Wall Installation Manual – 4WX2H, 5WX2H Page 14
Rev. 09/2019
Step 4 –Determining Reference Height and Fastening First
Row of Wall Brackets
Instructions
Diagrams
•
Measure the total length of video wall
mounting frame in order to determine
center point for wall installation.
Take total length _____ / 2 to
determine center point.
Determining center point for video wall.
•Mark wall with centre point.
•Mark wall with outside measurements
of video wall as shown in figure 4A.
Fig. 4A
IMPORTANT
Mounting hardware not supplied
For wood or metal studded walls only
•Determine location of all wall studs that
are behind video wall and mark each
stud accordingly using stud finder.See
figure 4B.
For concrete or concrete block walls only
•Depending on number of Wall Brackets
(Part E) supplied, determine placement
by evenly spacing them out
Fig. 4B

Video Wall Installation Manual – 4WX2H, 5WX2H Page 15
Rev. 09/2019
•At either end of the video wall
placement, mark the outer most stud
to the finished height of video monitors
less 10 cm.
•Using a laser level mark this reference
point (height) at each stud behind the
video wall. See figure 4C, and 4D.
•These marks at each stud will be the
used to drill holes for mounting the
Wall Brackets (Part E).
IMPORTANT
All of these Wall Brackets MUST be exactly
the same height!
Fig. 4C Fig. 4D
NOTE
In the event one of the Wall Brackets still
has the tabs attached you will need to break
them off otherwise the tab may interfere
with flush mounting of Wall Bracket to wall
surface.
They can be easily removed using a pair of
pliers or slotted screwdriver.
Refer to diagrams 4E or 4F.
4E) Removal using Pliers
4F) Removal using slotted screw driver

Video Wall Installation Manual – 4WX2H, 5WX2H Page 16
Rev. 09/2019
IMPORTANT
Wall mounting hardware not
supplied
•Referring to chart below, determine the
number of Wall Brackets (Part E) to be
fastened to wall for ONLY THE VERY
TOP RAIL AT THIS TIME.
Model
Wall Brackets
4W x 2H
5
5W x 2H
6
•Based on the stud locations (behind
video wall) determine placement of the
very top rail Wall Brackets (Part E) as
close to ideal placement shown in
figure 4G.
•Fasten the very top rail Wall Brackets to
studs at the reference points marked.
Fig. 4G

Video Wall Installation Manual – 4WX2H, 5WX2H Page 17
Rev. 09/2019
Step 5 –Mounting the Frame Structure
Instructions
Diagrams
IMPORTANT
Depending on size of Video Wall, 2
or more persons may be required to
lift frame structure and attach to
Wall Brackets.
a) With 2 or more persons carefully lift
frame structure and rest it on top of all
the first row wall brackets fastened to
wall. See figure 5A.
b) Slide the Square Nuts (Part N)
previously inserted into bottom T-slot
of rail so each they line up with centre
hole of Wall Brackets. See figure 5B
and 5C.
Hint: Use a small slotted screw driver or
similar object to slide Square Nuts within
the channel.
c) Place Screw (Part N2) into Wall Bracket
and hand tighten into Square Nut.
d) The frame structure will now support
itself.
Fig. 5A
Fig. 5B Fig. 5C
Fig 5D
e) Repeat above steps and attached
remaining Wall Brackets as indicated in
figure5D.
IMPORTANT:
Only hand tighten Bolts into Square Nuts
for each Wall Bracket at this time.

Video Wall Installation Manual – 4WX2H, 5WX2H Page 18
Rev. 09/2019
Step 6 –Ensuring Frame Structure is Straight and Plumb
Instructions
Diagrams
IMPORTANT:
It is extremely important the frame
structure is straight along the entire
length of structure and plumb the
entire length down the wall.
Do not push the frame structure
against the wall. The frame
structure is designed to act as the
support structure for the monitors
and not the wall itself.
a) Almost all walls are not build straight
you will need to use a laser level to
ensure the frame structure is straight
along the entire length of structure.
See figure 6A.
b) In the event a portion of horizontal
section needs to be adjusted slightly
inwards or outwards the Wall Brackets
do have a slot to allow for these
adjustments. See figure 6B.
c) If required, use shims from Shim kit
(Part SK) if further adjustments
required.
d) Once the frame structure is straight,
plum and level tighten each Screw to
secure and lock frame the frame in
position.
Fig. 6A
Fig. 6B
Tighten the loose
Screws at Wall
Bracket once
frame is straight
horizontally and
vertically

Video Wall Installation Manual – 4WX2H, 5WX2H Page 19
Rev. 09/2019
Step 7 –Mounting Monitors to Frame Structure
Instructions
Diagrams
IMPORTANT:
Before mounting any monitors
recheck to ensure all hardware has
been tightened to prevent any
physical damage to monitors falling
or personal injury.
•In previous Step 1, the Panel VESA
Brackets (Part D) should have been
attached to back of monitors at the
VESA mount locations.
Fig. 7A
Monitors are to be installed onto frame
structure in alphabetical order as shown in
figure 7B.
•Install bottom row of monitors first and
make any necessary adjustments as
shown in Step. 8
•Then install next row and make any
necessary adjustments as shown in
Step 8.
•Repeat for each row.
TIP: Use the thickness of two (2) business
card as the ideal separation gap (1mm)
between video monitors one above the
other.
Fig. 7B
•
To mount monitors, lift them one at a
time and slightly tilt monitor then insert
the downward pointing tab at top of
each Panel VESA Bracket into the T-slot
of top of rail. See figures 7C and 7D.
•Make sure both Panel VESA Brackets
are inserted properly otherwise
monitor may fall. See figure 7E.
•Once monitors are mounted to rail,
they can be moved sideways by simply
sliding them on the rail.
•Repeat for all remaining monitors to be
mounted.
Fig. 7C Fig. 7D
Fig. 7E

Video Wall Installation Manual – 4WX2H, 5WX2H Page 20
Rev. 09/2019
Step 8 – Monitor Alignment
Instructions
Diagrams
IMPORTANT:
First proceed to Step 9 on next page to gain access to monitor requiring vertical alignment.
Aligning Monitors Inwards/Outwards
The monitors share the same top rail, in
almost all cases the front face of monitors
will always line up to each other.
To align bottom of two (2) adjacent
monitors an inward/outward micro
adjustment screw is located on lower
section of each Panel VESA Bracket. See
figure 8A.
•To move bottom of monitor outwards
hand turn alignment screw counter
clockwise.
•To move bottom of monitor inwards
hand turn alignment screw clockwise.
Fig. 8A
Aligning Monitors Horizontally
•Once you have access to desired
monitor and while monitor is still
attached to mounting rails;
•Simply slide the monitor on horizontal
rail to desired position.
Fig. 8B
Aligning Monitors Vertically
Top or bottoms of two (2) adjacent
monitors do not align evenly. See figure 8D.
IMPORTANT:
If the monitors require more than
+-3mm adjustment stop and
recheck you followed installation
instructions correctly.
•Once you have access to desired
monitor and while monitor is still
attached to mounting rails;
•Turn the top screw clockwise to slowly
raise the end of monitor.See figure 8C.
•Turn the top screw counter clockwise
to lower the end of monitor.See figure
8C.
Fig. 8C
Fig. 8D
This manual suits for next models
1
Table of contents
Other Micron Monitor manuals