MMM Medcenter CLIMACELL 111 User manual

CLIMACELL_PCH_en_np_mmm !0208 V1.07_Blue Line
Cooling incubator
with controlled humidity
CLIMACELL 111, 222, 404, 707
Operating instructions
MMM Medcenter GmbH Manufacturer:
MMM Medcenter
Einrichtungen GmbH
Schulstrasse 29
D – 82 166 Gräfelfing
Tel.: +49 89 89 92 26 20
Fax: +49 89 89 92 26 30

Operating instructions CLIMACELL Page 1
CLIMACELL_PCH_en_np_mmm !0208 V1.07_Blue Line
CONTENTS:
2.8..2002
1 GENERAL NOTES......................................................................................................................... 3
2 IMPORTANT INSTRUCTIONS ...................................................................................................... 3
2.1 UNPACKING AND CHECK ................................................................................................................ 3
2.2 BEFORE PUTTING INTO OPERATION ................................................................................................ 4
2.3 PERMITTED LOADS:....................................................................................................................... 5
2.4 WIRING AND OTHER CONDITIONS ................................................................................................... 5
3 SPECIFICATIONS OF THE COOLING INCUBATOR WITH CONTROLLED HUMIDITY............ 6
3.1 GENERAL VIEW ............................................................................................................................. 6
3.1.1 Useful space...................................................................................................................... 7
3.2 CONNECTOR RS-232C FOR PROTOCOL PRINTER .......................................................................... 7
3.3 OPERATING PANEL........................................................................................................................ 8
4 FUNCTION AND OPERATING...................................................................................................... 9
4.1 CONNECTING TO THE WATER SOURCE AND DRAIN ........................................................................... 9
4.2 CONNECTING TO THE ELECTRIC NETWORK:.................................................................................... 9
4.3 SWITCH THE UNIT ON: ................................................................................................................... 9
4.4 GENERAL SETUP OF CLIMACELL............................................................................................... 10
4.4.1 Activating the service mode............................................................................................. 10
4.4.2 Service 01 – Storing P1 – P4, or P5, or P6 to chip card ................................................. 10
4.4.3 Service 02 – Restore/upload the programs from the chip card to the unit...................... 10
4.4.4 Service 03 – Set the real time and date .......................................................................... 11
4.4.5 Service 04 – Set interval on printer/communication interface......................................... 11
4.4.6 Service 05 – Select language.......................................................................................... 12
4.4.7 Service 06 – Setting the switching time of the inner socket (optional)............................ 12
4.4.8 Service 07 - Setting the safety thermostat ...................................................................... 12
4.4.9 Service 08 – Selecting the water quality ......................................................................... 13
4.4.10 Service 09 – Canceling the service regime..................................................................... 13
4.4.11 Setting the lighting – type with door lighting.................................................................... 13
4.4.12 Setting the relative humidity in programs P1 – P4 .......................................................... 13
4.4.13 Setting the operating conditions of temperature and relative humidity and their limitations
14
4.5 PROGRAM P1............................................................................................................................. 15
4.5.1 Set P1.............................................................................................................................. 15
4.5.2 LCD read out shown........................................................................................................ 15
4.5.3 Start P1........................................................................................................................... 15
4.5.4 Information on the set parameters during the device’s running: ..................................... 16
4.5.5 Stop program P1.............................................................................................................. 16
4.6 PROGRAM P2............................................................................................................................. 16
4.6.1 Set P2............................................................................................................................. 16
4.6.2 LCD - read out shown:..................................................................................................... 16
4.6.3 Start P2............................................................................................................................ 17
4.6.4 Information on the set parameters during device’s running: ........................................... 17
4.6.5 Stop P2........................................................................................................................... 17
4.7 PROGRAM P3............................................................................................................................. 17
4.7.1 Setting the program P3.................................................................................................... 17
4.7.2 LCD - read out shown:..................................................................................................... 18
4.7.3 Start P3........................................................................................................................... 18
4.7.3.1 P3 and segment 1 in the graph are active.................................................................................18
4.7.3.2 P3 and segment 2 in the graph are active, the segment 1 is over............................................. 18
4.7.4 Information on the set parameters during the device’s running: ..................................... 19
4.7.5 Stop P3........................................................................................................................... 19
4.8 PROGRAM P4............................................................................................................................. 19

Operating instructions CLIMACELL Page 2
V1.07_Blue Line
C
LIMACELL_PCH_en_np_mmm !0208
4.8.1 Set P4.............................................................................................................................. 19
4.8.2 Set the segment for T1.................................................................................................... 20
4.8.2.1 Set temperature T1 ................................................................................................................... 20
4.8.2.2 Set the delay time of T1 : .......................................................................................................... 20
4.8.2.3 Read out of T1 and the delay time: ........................................................................................... 20
4.8.2.4 Set the ramp at T1 :................................................................................................................... 20
4.8.2.5 Read out of T1 and the ramp:.................................................................................................... 20
4.8.2.6 Set the fan speed at the temperature T1:.................................................................................. 20
4.8.3 Set the temperature T2 :.................................................................................................. 21
4.8.3.1 Set the temperature T2 : ........................................................................................................... 21
4.8.3.2 Set the delay time of T2 ............................................................................................................ 21
4.8.3.3 Read out of T2 and the delay time: ........................................................................................... 21
4.8.3.4 Set the ramp at T2:.................................................................................................................... 21
4.8.3.5 Read out of T2 and the ramp:.................................................................................................... 21
4.8.3.6 Set cycles for P4: ...................................................................................................................... 21
4.8.3.7 Read out of cycles for P4: ......................................................................................................... 21
4.8.3.8 Setting the ventilator rate and RH at the temperature T2: ......................................................... 22
4.8.4 Start P4:.......................................................................................................................... 22
4.8.4.1 S1 is active, temperature is heading towards T1:...................................................................... 22
4.8.4.2 S2 is active, T1 has been reached, delay time is running: ........................................................ 23
4.8.4.3 S3 is active, temperature is heading towards T2:...................................................................... 23
4.8.4.4 S4 is active, T2 is reached, delay time at T2 is running: ........................................................... 23
4.8.5 Information on the set parameters during the device’s running:..................................... 23
4.8.6 Stop P4............................................................................................................................ 24
4.9 PROGRAM P5, P6....................................................................................................................... 24
4.9.1 Description of P5 and its control...................................................................................... 24
4.9.2 Description of P6 and its control...................................................................................... 26
4.10 ERROR MESSAGES ................................................................................................................. 29
4.11 PRINTING THE PROTOCOL ....................................................................................................... 31
4.12 CHECKING THE FUNCTION OF THE SAFETY THERMOSTATS......................................................... 31
5 MAINTENANCE........................................................................................................................... 32
5.1 EXCHANGE OF THE DOOR SEAL.................................................................................................... 32
5.2 CONTAINER FOR COLLECTING THE CONDENSED WATER STEAM...................................................... 33
5.3 CLEANING THE COOLING INCUBATOR............................................................................................ 33
5.4 MELTING .................................................................................................................................... 33
6 TECHNICAL DATA...................................................................................................................... 34
7 WARRANTY AND SERVICE....................................................................................................... 35
8 TRANSPORT AND STORAGE.................................................................................................... 35
9 HOW TO ELIMINATE WRAPPINGS AND A UNIT OUT OFF SERVICE ................................... 35
10 OPTIONAL EQUIPMENT............................................................................................................. 36
10.1 INNER LIGHTING...................................................................................................................... 36
10.2 BUSHINGS OF DIAMETER 25, 50, 100 MM ................................................................................ 36
10.3 LOCKABLE DOOR .................................................................................................................... 36
10.4 LEFT DOOR ............................................................................................................................ 36
10.5 INDEPENDENT SENSOR PT100................................................................................................ 36
10.6 COMMUNICATION SW DS COM FOR PC UNDER WINDOWS ...................................................... 36
10.7 POTENTIAL-FREE CONTACT FOR ALARM REPORTS .................................................................... 37
10.8 THE INNER SWITCHED SOCKET ................................................................................................ 37
10.9 EXPOSITION LIGHTING IN THE DOOR......................................................................................... 37

Operating instructions CLIMACELL Page 3
CLIMACELL_PCH_en_np_mmm !0208 V1.07_Blue Line
1 General notes
The unit CLIMACELL should be used in applications, in which changing the temperature in a
sample in range from 0 °C to 99.9 °C and the relative humidity (RH) from 10 % to 95 % in
various time modes is needed.
CLIMACELL may be used in several ways, so please, read this manual carefully.
MMM’s cooling incubators CLIMACELL are equipped with a microprocessor control with the
following features:
1. Fuzzy-logic temperature controller and a thermo-sensor PT 100.
2. Humidity control by PID regulator with fuzzy logic and a humidity capacity sensor.
3. 4 preset programs P1 to P4, 2 programs P5 and P6 to set containing up to 16 steps.
4. Electronic timer with different time modes, see description of programs (page 10).
5. Adjustable fan speed from 0 to 100 % in 10 %-steps.
6. Printing the protocol with real temperature and time values via interface RS 232 C.
7. Chip card reader to store data P1 to P4, P5, P6 and to record to the memory .
8. Foil covered touch buttons for easy programming.
9. 32 digit LCD display, illuminated. All parameters seen at once. (To your information, the
display is already set up to be used in product ranges coming out in future.)
CLIMACELL is manufactured of high grade materials with the latest technology and is
subjected to strict final tests leaving the plant. The inner chamber housing as well as the
shelves are made of stainless steel. The coating is water based, gray on top of galvanized
zinc coated sheet metal, safe for the environment.
2 Important instructions
2.1 Unpacking and check
After unpacking the unit, please, check, whether the unit and its facilities are complete and
undamaged.
An eventual damage must be immediately reported to the transporting company.
During the manipulation – in case of lifting the cabinet etc. – the cabinet cannot be hold by
the rail or door. The cabinets of volumes 404 and 707 should be lifted by means of delivered
hooks, the rolls are designed for local moving, not for longer transport.
The standard delivery consists of the temperature cabinet,
two sieves,
one chip card SO for setting the safety thermostat,
three chip cards for storing the set programs
hose for connecting the input water
(order No.: 0671574),
hose for outlet of the waste water
(order No.: S461200),
dish for collecting the condensate

Operating instructions CLIMACELL Page 4
V 1.07_Blue Line CLIMACELL_PCH_en_np_mmm !0208
2.2 Before putting into operation
CLIMACELL is designed and produced in accordance with EN 50081-1, 55011, 50082-2,
61000-4-2, 61000-4-4, ENV 50140, 50141, meets requirements of EU directions
89/336/EEC, 73/23/EEC, and is individually tested according to EN 61010-1.
♦Before starting the work with this unit please study the instructions for use
carefully!
♦Lay the treated material only on the sieves in the unit, never on the bottom of the
chamber!
♦Carrying capacity of the floor, where the unit will be placed, must correspond to the
weight of the unit itself plus the weight of the maximum charge (see chapter Technical
parameters).
♦The unit must not be placed on a floor covering, which could cause a danger of fire
or smothering in case of falling of hot objects out of the unit.
♦No inflammable, explosive or toxic stuff or materials which could give such
stuff off may be inserted into the units!
♦Unit is not designed for warming of liquids.
♦Units are not designed for using in atmosphere with danger of inflammable or
explosive anaesthetics.
♦Every mounting and demounting of the unit’s parts may be carried out only
after disconnecting the unit from the mains by pulling the supply cord out of the
socket.
♦Installation of the unit is carried out by connecting to the mains and connecting to the
water source and the drain. Parameters of the electric connections are specified in
chapter Electric installation and other conditions.
♦If the unit is not used for a longer time, disconnect it from the mains by pulling the
connecting cord out of the socket.
♦The mains cord must not come into contact with hot parts of the unit
♦Protection of the temperature cabinet, its surroundings and the treated material from
surpassing the temperature is secured by a safety thermostat. The unit CLIMACELL has
a safety thermostat class 3 according to EN 61010-2-010.
♦Check the function of the safety thermostat regularly – every day (see paragraph
Check of the function of the safety thermostat).
♦The types of cabinets are: standing on the floor, space saving, equipped with rolls
and a brake. It is necessary, that the cooling incubator stands on an even floor.
Otherwise the unit’s run could be influenced negatively.
♦Minimum distance of the rear and side wall of the unit from other objects and walls
is 100 mm, from the upper wall it is 400 mm.

Operating instructions CLIMACELL Page 5
CLIMACELL_PCH_en_np_mmm !0208 V1.07_Blue Line
♦Shifting the upper sheet of the inner chamber out and in must be carried out
carefully, there is a danger of cutting the chamber seal through as a consequence of
careless manipulation.
♦If the unit operates with a temperature higher than 70°C, take a special care when
opening the door. As there is the set RH kept in the chamber, hot steam is generated,
which can cause a scald.
♦As Climacell is connected to water supply and drain, place the unit in a room with
its floor sloping towards the drain.
2.3 Permitted loads:
size weight [kg]/tray total weight [kg]
55 20 50
111 20 50
222 30 70
404 30 100
707 50 130
2.4 Wiring and other conditions
•overvoltage category: II
•protection : IP 20 according to EN 60 529
•power supply: 230 V, ±10 %
•degree of grounding : 2 according to IEC 664
•ambient temperature: 4 to 40 °C
•relative humidity: 80 % at 31 °C, 50 % at 40 °C
•use: interior rooms
•separation of external circuits double isolation, the circuits are separated
from the mains by a safety transformer
tested for the voltage 2300 V

Operating instructions CLIMACELL Page 6
V 1.07_Blue Line CLIMACELL_PCH_en_np_mmm !0208
3 Specifications of the cooling incubator with controlled humidity
3.1 General view
1 Mains switch 12 Quick coupler – ring for disconnecting
2 Control panel 13 Quick coupler – part I
3 Plastic body of the regulator 14 Unit of the magnetic treatment of input water
from the distribution system
4 Condenser 15 Boiling vessel for steam generator
5 Compressor (coolant R134a) 16 Pump
6 Cooling snakelike tubing – 6a, 6b 17 Drain of waste water
7 Heating bodies in the heating space 18 Input of pressure water of the distribution
from the vessel with distilled water
8 Mains connector. 230V, 50 Hz 19 Interconnection of the generator and the
chamber (with sealing)
9Fuses, F 10 A, 250 V, ∅5 x 20 mm 20 Sensor PT 100
10 Interface for printing the protocol (RS 232C) 21 Relative humidity sensor
11 Exposure lighting in the door – option 22 Set of the steam generator

Operating instructions CLIMACELL Page 7
CLIMACELL_PCH_en_np_mmm !0208 V1.07_Blue Line
3.1.1 Useful space
Useful space - see the illustration. in the following picture, where X(H) = X(D) = 10 % of the
chamber depth, X(Š) = X(W) = 10 % of the chamber width, X(V)1= X(H) = distance of the
bottom shelf to the bottom of the chamber. The required temperature accuracy from the par.
Technical parameters can be only achieved within the space defined above(according to DIN
12 880 – marked with heavy lines in the picture, the light lines mark the inner walls of the
chamber). (It means that over the highest shelf the values of the chapter Technical
parameters are not obligatory).
3.2 Connector RS-232C for protocol printer
Interface parameters
Baud: 4800
Stopbit: 1
Parity: none
Databit: 8
Devices connected with of connector RS 232 must fulfill valid regulations and be
approved by a competent testing laboratory.
The unit is designed for connecting to printer CITIZEN, model iDP 3110-24 RF-A, which
can be ordered optionally.
Pin Signal
2TxD
3RxD
5GND
6DSR

Operating instructions CLIMACELL Page 8
V 1.07_Blue Line CLIMACELL_PCH_en_np_mmm !0208
3.3 Operating panel
1 key of activation of setting-up mode
2/4 cursor steering turning to the left/right
3 setting-up value in parameter
5 key starting the program
6 switch (ON - on, OFF - stand by)
7 indicator light - shines after switching on the switch
8 indicator light heating - shines: state of temperature regulator - heating active
9 indicator light cooling - shines: state of temperature regulator - cooling active
10 indicator light – failure
11 indicator light of safety thermostat - shines: temperature surpassed the limit set on the safety
thermostat - heating is off / see paragraph 4.1.8 Set safety thermostat
12 Display
13 port for inserting the chip card
Segment: partial or full graphic representation of the program coarse
Segment : l’affichage graphique du parcour du programme parciel ou total
°C: temperature display
": process time
: fan speed display in % (steps of 10 %)
RH – relative humidity
☼- setting-up intensity of exposition light in the door
56 -
p
ositions are used for s
p
ecific
p
ur
p
oses - see descri
p
tions in text

Operating instructions CLIMACELL Page 9
CLIMACELL_PCH_en_np_mmm !0208 V1.07_Blue Line
4 Function and operating
Function of individual indicator lamps and control keys is described in chapter
Description of the unit in paragraph Control panel.
4.1 Connecting to the water source and drain
a) the water source is a plastic container (ca. 50 l) with a submersible pump, filled with
distilled water
Unpack the container and:
- connect the cable connector to the corresponding socket in the rear part of the upper
piece (side piece) of Climacell,
- connect the hose to the steam generator (which is placed outside the unit at the bottom)
by means of the inner thread hose coupling to the container .
- Fill the container with distilled water. Climacell is ready for operation.
b) the water source is a drinking water piping (Ca content is max. 50 mg/l), permissible
water pressure is in the range from 0.1 to 1 MPa
By means of the supplied plastic hose connect CLIMACELL to the common water piping in
following way: screw one screw joint to the inlet pipe, which leads from the steam generator,
and the other screw joint to the water piping outlet. There is a unit of magnetic water
treatment placed on the steam generator inlet pipe ; the treatment suppresses forming of
mineral deposits inside the generator. Fix one end of the supplied outlet hose to the outlet
pipe, before which the waste water pump is placed, and tighten it with a tape, lead the other
end to a basin or directly to the drain. Taking the connection of Climacell to the water and
drain into consideration, it is recommended to place Climacell in a room with a floor sloping
towards the drain.
Caution!
In both cases a) and b) the hose of the water supply or discharge from the steam generator
must not be bent, throttled or cranked so that water cannot flow.
4.2 Connecting to the electric network:
Compare the nominal voltage and power input values, which you can find on the product
plate, with the power supply. If the supply parameters comply with the unit’s parameters,
connect the plug to the supply socket.
4.3 Switch the unit on:
Set the mains switch, which is placed on the panel of exceeding port, to the I position. Press
the , (the control light above the switch comes on), display comes on and the device is
ready for running. Continue the procedure as follows.
LCD shows all parameters for your convenience at once. Cursor is placed below all 32 digits
of LCD in a so called cursor line and is always placed only below one of the digits
Cursor line
(32 digits)

Operating instructions CLIMACELL Page 10
V 1.07_Blue Line CLIMACELL_PCH_en_np_mmm !0208
Parameter change:
Move the cursor horizontally by pressing ◄► . Change the parameter above the cursor by
pressing ▲.
4.4 General setup of CLIMACELL
CLIMACELL – MMM’ s product – offers a wide range of customer’s benefits. In order to
make them active, there are fundamental inputs required. To achieve this the following
service mode containing 7 different services is here.
4.4.1 Activating the service mode
Press simultaneously buttons ▲► for 2 seconds. LCD shows Service 01. By pressing the
button ▲you can change between the single service modes Service 01 – Service 08.
4.4.2 Service 01 – Storing P1 – P4, or P5, or P6 to chip card
With help of this service you can store programs P1 – P4, or P5, or P6 on the MMM s chip
card. Before storing the parameters to the chip card it necessary to insert the right card to the
unit panel. These cards can be ordered optionally.
Make sure that the chip card is in the card reader!
Press START/STOP to do storing. The transmission is confirmed by the read out „Done“ on
LCD. Press START/STOP again to enter another service. If the read out on the LCD is „Bad
MMM CCard“, check the chip card and repeat the procedure.
Pressing START/STOP enter the program storing service at first.
The choices P1 – P4,or P5 or P6 are available. Select by pressing ▲.
To store the program press button .
(In detail: Before the start: the display indicates: „Service 01“
„Save to CCard“
After the start: on the second line of the display by pressing ▲select what will be saved on
the chip card. Choices
- all eligible parameters of P1 to P4 at once - the display indicates:
„P1÷4 →MMM CCard“,
- all eligible parameters of P5 - the display indicates: „P5→MMM CCard“,
- all eligible parameters of P6 - the display indicates: „P6→MMM CCard“.
The storing of your choice on the chip card is done by pressing If an incorrect card is
placed into the unit, the display indicates: “Bad MMM CCard“. If everything is all right, the
indication is: “Done“.)
Quit the service by pressing START/STOP again.
4.4.3 Service 02 – Restore/upload the programs from the chip card to the unit
With help of this service you can record the programs P1 – P4, or P5, or P6 stored on the
chip card again to the unit’s memory (see 3.1.2). The programs in the memory will be
recorded over (erased). Make sure the chip card is in the card reader. Press START/STOP
to record. The transmission is confirmed by the read out „Done“ on LCD. Press
START/STOP again to enter another service. If the read out on the LCD is „Bad MMM
CCard“, check the chip card and repeat the procedure.

Operating instructions CLIMACELL Page 11
CLIMACELL_PCH_en_np_mmm !0208 V1.07_Blue Line
The procedure is as follows: By pressing START/STOP you enter the program restoring
service at first. The choices P1 – P6 are available. Select by pressing ▲. To record the
program press button .
(In detail: Before the start: the display indicates: „Service 02“
„Load from CCard“
After the start: on the second line of the display by pressing ▲select what will loaded from
the chip card. Choices:
- all eligible parameters of P1 to P4 at once - the display indicates:
„MMM CCard→P1÷4“,
- all eligible parameters of P5 - the display indicates: „MMM CCard →P5“,
- all eligible parameters of P6 - the display indicates: „MMM CCard →P6“.
The loading of your choice from the chip card is done by pressing If an incorrect card is
placed into the unit, the display indicates: “Bad MMM CCard“. If everything is all right, the
indication is: “Done“.)
Quit the service by pressing START/STOP again.
Caution!
Use only an original chip card delivered by the producer. Using of another card could
cause damaging of your unit’s regulator and the guarantee would be cancelled.
4.4.4 Service 03 – Set the real time and date
Pressing START/STOP you enter the service. Set the real time and date by pressing buttons
◄► and ▲. To quit the service press START/STOP again. Data on the display are in the
following form: ho:mi_day:month:year
4.4.5 Service 04 – Set interval on printer/communication interface
To print protocols device can be set up (optional) with a printer CITIZEN iDP 3110-24 RF-A,
which is connected by a cable to the printer interface – see par. Printing the protocol. Enter
the service by START/STOP and set the interval:
Pressing ▲select one of the following choices:
printer off
switched over to PC (application of SW DS Com – data are sent to PC)
interval 10 s
interval 01 min
interval 01 h
By pressing ◄move the cursor to the position 10/01 seconds, minutes or hours. By pressing
▲you can change the printer interval within the following range:
10 to 50 s (step 10 s)
01 to 59 min (step 1 min)
01 to 12 h (step 1 h)
To quit the service press START/STOP again.
.
Caution!
Only one unit is active, either seconds, minutes, or hours!

Operating instructions CLIMACELL Page 12
V 1.07_Blue Line CLIMACELL_PCH_en_np_mmm !0208
4.4.6 Service 05 – Select language
Pressing START/STOP you enter the service. To select the language use button ▲. To quit
the service press START/STOP again.
4.4.7 Service 06 – Setting the switching time of the inner socket (optional)
With help of this service you can set the time of the inner socket periodic switching on and
off. Press START/STOP to enter the service.
On the bottom line of LCD there is a read out:
„on: XXPP off: YYQQ“, where
XX is the number of time units during which the socket is on for a part of a period (00 – 99)
YY is the number of time units during which the socket is off for a part of a period (00-99)
PP time units for switching on (min or hr)
QQ time units for switching off (min or hr)
Move the cursor by pressing ◄► change the number of the time units or unit by pressing ▲
If XX = 00, the socket will never be on, if XX ≠00 and YY = 00, the socket is on all the time
after the start.
4.4.8 Service 07 - Setting the safety thermostat
The safety thermostat serves for safety of the temperature cabinet, its surroundings and the
treated material from suppressing the set temperature or from the temperature drop below
the set limit (i.e. prevents damaging or destroying the material samples in case of
damaging the temperature regulator or in case of an unintentional setting the chamber
temperature higher- or lower-, than the appropriate sample is able to endure).
By pressing START/STOP enter the service.
On the lower line of the display –
at the position 9, 10 (symbols ZZ on display) – set the by you selected lower temperature
limit (adjustable in the range from –5 °C to +39 °C),
at the position 12, 13, 14 (symbols XXX on the display) – set the upper temperature limit
(adjustable in the range from 0 °C to +199 °C),
(minimal deviation from the set regulated temperature is ±5 °C),
at the position 16 (symbol Y on the display) set the safety thermostat type 3 – complies with
class 3 according to EN 61010 (i.e. in case of suppressing the set temperature in the
chamber the thermostat will switch the heating bodies off, the control light safety thermostat
switches on, the acoustic alarm starts up, the report on the display “Safety Thermost.” is
altered with the previous date, the unit does not heat, even if the control light heating lights.
After the drop of the temperature in the chamber under the set safety thermostat limit goes
the unit on with the operation – for example the heating is switched on. The control light
safety thermostat switches off, the acoustic alarm is still active and the report on the display
“Safety Thermost.” is altered with the data about actual state – these two data can be
cancelled by pressing START/STOP. Similar events – in a mirror symmetrical form- occur in
case of a temperature drop below the lower temperature limit, cooling is switched off instead
of heating.)
Insert the chip card SO into the reading unit on the control panel and confirm the
setting of temperature and thermostat type by pressing . Take the chip card SO
off.
Quit the service by another pressing START/STOP.
Note: If a program is started, whose set temperature is outside the limits given by setting the
safety thermostat, the display reports error 05 – error of setting the safety thermostat.
Check of the safety thermostat function is described in chapter Function of safety
thermostats.

Operating instructions CLIMACELL Page 13
CLIMACELL_PCH_en_np_mmm !0208 V1.07_Blue Line
4.4.9 Service 08 – Selecting the water quality
Enter the service by pressing START/STOP. On the upper line of the display: „Water
Quality“
On the lower line switch over by pressing ▲: either „Tap Water“ or „Destilled Contai“.
Conform the setting by pressing START/STOP and quit the service 08.
4.4.10 Service 09 – Canceling the service regime
Cancel the service regime by pressing START /STOP. Now you can select and start the
programs.
4.4.11 Setting the lighting – type with door lighting
Programs P1 to P4, P5, P6 – type with dimmer
Concerning extension of following chapters:
Setting the program P1
Setting the program P2
Setting the program P3
Setting the program P4 – segment T1
Setting the program P4 – segment T2
Description of the program P5 and its control
Description of the program P6 and its control
By pressing ◄► place the cursor to the position ☼and by pressing ▲select the lighting.
P1 to P4: after reaching the set temperature in the just adjusted horizontal segment – or at
P3 also at the time delayed period – there is possible to set the illumunation at steps of 10%
of maximum illumination. 0% (totally off) is at display shown as „OFF“, 100% is shown as
„ON“. The illumination is constant during the whole time as the segment continues.
P5, P6: there is possible to set the illumination at steps of 10 % of maximum illumination at
every (horizontal or cross) segment. 0% (totally off) is at display shown as „OFF“, 100 % is
shown as „ON“. The illumination is constant during the whole time as the segment continues.
The reference value of illumination (when 100 % and 22 °C is set) on the level of the entry
into the chamber (in the middle of the entry area) – measured with the luxmeter sensor
perpendicularly towards the impinging rays, white day light: CLC 111: 6000 lx ±5 %, CLC
222: 10 000 lx ±5 %, CLC 404 and 707: 13 000 lx ±5 %
4.4.12 Setting the relative humidity in programs P1 – P4
During the setting of temperature and time in the given horizontal segment set the required
value of relative humidity in 1 %-steps in the range of RH between 10 % and 95 % at the
position of RH on the lower line of the display – with limitations given in diagram in
paragraph Setting the operating conditions of temperature and relative humidity and
their limitations.
Rise to the set RH starts after reaching the set temperature.
Notice:
Switch off the RH regulation during the run of the program with the already set RH value
according to the following example: If the cabinet operates e.g. at 20 °C and 86 % RH,

Operating instructions CLIMACELL Page 14
V 1.07_Blue Line CLIMACELL_PCH_en_np_mmm !0208
depress X/W and put the cursor to the position of RH units, set 9, go to the position of RH
tens and set the further value over 9 – this position is OFF.
4.4.13 Setting the operating conditions of temperature and relative humidity and their
limitations
Relation between the operating temperature (T °C) and the operating relative humidity
(RH %) in setting the operating parameters of the cabinet is shown by the enclosed diagram.
The hatched surface is limiting the area of achievable operating parameters.
If the cabinet is supplied with the door lighting, a different diagram is valid, see hereafter:

Operating instructions CLIMACELL Page 15
CLIMACELL_PCH_en_np_mmm !0208 V1.07_Blue Line
4.5 Program P1
A constant temperature and a constant value of RH is required.
P 1 =
The cabinet is working fluently at the set temperature and RH until the unit is switched off.
4.5.1 Set P1
Put cursor to the position Program with help of ◄► and switch to P1 with help of ▲
Set the temperature at the position °C between 0 and 99.9 °C in steps 0.1 °C Place the
cursor on the lower line of the display and set the ventilator rate at the position to a value
from 00 % to 100 %in 10 %-steps (% of maximum rate) and RH between 10 % and 90 %
with limitations given in diagram in paragraph Setting the operating conditions of
temperature and relative humidity and their limitations.
CAUTION!
Do not reduce the ventilator rate if not necessary. The reduced ventilator rate could
influence the regulation of temperature and RH negatively!
4.5.2 LCD read out shown
4.5.3 Start P1
Press START/STOP, a sound will appear and the “windmill“ in the first digit of LCD starts
running clockwise.
See the following LCD read out:
Digit 1 (windmill running) = program running
Digit 7 to 10 = actual temperature in °C.
Digit 12 to 16 = time from the start in hr:min.
As soon as the set values are reached, then run down time is shown.

Operating instructions CLIMACELL Page 16
V 1.07_Blue Line CLIMACELL_PCH_en_np_mmm !0208
4.5.4 Information on the set parameters during the device’s running:
Press and all information on the set parameters are shown at once. All possible
parameters in all possible programs can be set including the one which is presently active,
as long as the change is effective.
4.5.5 Stop program P1
Press START/STOP again.
4.6 Program P2
At first the set temperature is reached, the set time starts to be counted and the rise of RH to
the set value starts at the same time. After the end of the operation the heating and other
active functions are switched off.
P 2 =
The unit operates at the set temperature and RH till the expiration of set time (max. 99h 59
min).
4.6.1 Set P2
With help of buttons ◄►put the cursor to the position Program and switch to the program
P2. Set the temperature at the position °C. Move the cursor to the position "and set the run
down time between 00hr:00min to 99hr 59min. Set the ventilator rate at the position to a
value from 00 % to 100 %in 10 %-steps (% of maximum rate) and RH between 10 % and 90
% with limitations given in diagram in paragraph Setting the operating conditions of
temperature and relative humidity and their limitations.
CAUTION!
Do not reduce the ventilator rate if not necessary. The reduced ventilator rate could
influence the regulation of temperature and RH negatively!
4.6.2 LCD - read out shown:

Operating instructions CLIMACELL Page 17
CLIMACELL_PCH_en_np_mmm !0208 V1.07_Blue Line
4.6.3 Start P2
Press START/STOP, a sound will appear and the “windmill“ in the first digit of LCD starts
running clockwise.
See the following LCD read out:
°C °C °C = actual temperature
hh:mm = time to reach the set temperature, if the set-up is reached, the rest of the run down
time is indicated.
4.6.4 Information on the set parameters during device’s running:
See paragraph 4.5.4
4.6.5 Stop P2
Press START/STOP
4.7 Program P3
The delayed start begins after the defined run down time has been reached.
[The function starts CLIMACELL for example at the weekend. Thus your goods are ready on
the first day of return to work.]
P 3 =
The device starts running after the delayed time has run down (max. 99 hr 59 min) and the
unit operates at the set temperature. The duration of the set temperature can be limited or
unlimited in time.
4.7.1 Setting the program P3
By means of ◄►set the cursor to the position Program and come over to the program P3.
By means of ◄► place the cursor in the graph to the segment 1, by which the segment is
activated (eventually change the position of the cursor by means of ▲).
Set the time of delayed start 00 min to 99 h 59 min in the fields ".
By means of ◄► place the cursor in the graph and by means of ▲switch over to the
second segment of the graph _/¯.
Set the temperature in the fields °C. Place the cursor to the position "and set the time of
operation between 00h:00min to 99 h 59 min or unlimited ∞:∞.(set the infinity in the following
way: set 99 h, put the cursor to the nine in units and depress▲)Place the cursor to the
position and set the ventilator rate between 00 to 100 %, then set the required relative
humidity between 10 % and 90 % at the position RH – with limitations given in diagram in

Operating instructions CLIMACELL Page 18
V 1.07_Blue Line CLIMACELL_PCH_en_np_mmm !0208
paragraph Setting the operating conditions of temperature and relative humidity and
their limitations.
Caution!
Do not reduce the ventilator rate if not necessary. The reduced ventilator rate could
influence the regulation of temperature and RH negatively!
.
4.7.2 LCD - read out shown:
4.7.3 Start P3
Press START/STOP, a sound will appear and the “windmill“ in the first digit of LCD starts
running clockwise. See the following LCD read out:
4.7.3.1 P3 and segment 1 in the graph are active.
_ / = segment 1
hh:mm = the programmed time, counting down towards zero.
°C °C °C = actual temperature
4.7.3.2 P3 and segment 2 in the graph are active, the segment 1 is over
hh:mm = time running from the start till the set temperature has been reached.
°C °C °C = actual temperature
= segment 2

Operating instructions CLIMACELL Page 19
CLIMACELL_PCH_en_np_mmm !0208 V1.07_Blue Line
After the set temperature has been reached, the run down time is shown if the time of the
procedure is unlimited. If the time is limited, the rest of the run down time is shown.
4.7.4 Information on the set parameters during the device’s running:
See paragraph 4.2.4
4.7.5 Stop P3
Press START/STOP.
4.8 Program P4
With two temperature levels T1 and T2, with controlled rate of temperature variation (ramps),
with setting the RH for each temperature level and with cycling option.
Operates at 2 temperature levels T1 and T2, the dwell time on the level T1 is limited, on the
level T2 can be limited or unlimited.
4.8.1 Set P4
Index: T0 = initial chamber temperature
T1 = temperature level 1
T2 = temperature level 2
Digit 11 on LCD, placed between temperature and dwell time values, shows the
following information:
r = ramp value, can be set on digits 12 – 16
and corresponds with temperature change speed in °C/min
max. value is +3.20 °C/min, when T0 < T1
max. value is –1.0 °C/min, when T0 > T1
If r = 00.0, no ramp active!
(Variations of maximum ramp rates by different temperatures may appear due to physical
limits of heating power.)
t = time available in position "(00h:00min – 99 h 59 min), at T2 the dwell time can
be unlimited
c = cycles shown in position ", digits 12 – 13 on LCD (available only at T2, if the
dwell time is unlimited)
Possible number of cycles is 02 to 99 (eventually ∞- which is the next position after 99 - the
cycling is possible on condition, that the temperature drops below the value T0 after the end
of interval on T2)
This manual suits for next models
3
Table of contents
Popular Accessories manuals by other brands

M-Audio
M-Audio M-TRACK 2x2 C series user guide

HYDRO-RAIN
HYDRO-RAIN HRC-100-RS-RF instruction manual

Beckett
Beckett Crystal Pond with Bio-Barley BP8 specification

UWT
UWT Capanivo CN 7000 Series Technical Information/Instruction manual

Lippert Components
Lippert Components Solera Smart Arm installation guide

Dini Argeo
Dini Argeo 3590EKR Series Technical manual