Moebelix BS-MK1-EXT User manual

Metal Garden Shed
OWNER'S MANUAL
Instructions for Assembly
Requires two people and takes 1-1.5 hours for lnstallation.
Quick & Easy Assembly
Ridge Reinforced Walls
Available in Various Sizes
BS-MK1-EXT

BEFORE YOU START
Owner's Manual
Prior to installation, it is important that you contact your local government authority to
determine if building approval is required. Study and understand this owner's manual.
Important information and helpful tips will make your construction easier and more
enjoyable.
Assembly instructions
Instructions are supplied in this manual and contain all appropriate information for your
building model. Review all instructions before you begin. During assembly, follow the
step sequence carefully for correct results .Please be aware: this unit takes two people
about one full day to complete.
Parts
Check to be sure that you have all the necessary parts for the building.
Separate contents of the carton by the part number while reviewing parts list.
Familiarize yourself with the hardware and fasteners for easier use during
construction. These are packaged within the carton. Note that extra fasteners have been
supplied for your convenience.
TOOLS MAY REQUIRED
Use heavy duty gloves when handling steel sheets and flashing
PLAN AHEAD
Watch the weather:
Please be sure the day you select for installation is dry and calm.
DO NOT attempt to assemble your shed in windy weather
because of risk of damage to panels, or personal injury. Be careful
of wet or muddy ground.
Teamwork:
Whenever possible, two or more people should work together to
assemble the building. One person can position parts or panels
while the other is able to handle the fasteners and the tools.
It requires two people a full
day to complete installation

PLAN AHEAD
Site Selection
lAvoid overhanging trees as much as possible as leaves will make regular cleaning
necessary and broken branches are a potential hazard.
lSmall trees,bushes or fences nearby can be helpful,acting as a wind break.
Site Preparation
The site must be prepared so that the base of the shed is level all round and checking
with a spirit level is required.
The base can be constructed by treated timber or concrete,in order to stop the moisture
getting into the shed.The shed is not designed to be built onto lawn directly.Also the
ground will get muddy during rainy days.
If a concrete pad is made,it is important that this slopes towards the edges to prevent
water ingress.
Time must be allowed for any concrete or cement to dry before building the shed on top.
Bases can also be constructed from bricks,blocks,or mounted on a concrete pad.
The bricks or blocks should be cemented onto firm and level concrete footings and the
greenhouse frame drilled and screwed to the base.
IMPORTANT NOTES:
lFind someone to help you:it is much easier with someone to hold parts,pass tools
ect.Also some steps require two people to lift structures together.This is not very
heavy work so would suit most able-bodied people.
lAllow plenty of time:rushing often causes errors and the re-doing of incorrect
assemblies.If you have never built a shed before,it can take most of a day to carefully
complete the construction.
lHave the right tools to hand.
lSafety clothing as recommended in the 'Tools' section.
lIdeally lat out the parts and check that all are present before commencing
construction.Lay on cloths or plastic sheets if there is any risk of scratching the parts.
lTighten all nuts carefully,being sure not to miss any.Check the frame is square and
using a spirit level to check that it is upright.

PART
NO. Qty.
PART
NO. Qty.
2
17 796mm
1
16 798mm
F1
F2
S2
S3
F3
1
15 798mm
798mm 2
6
2
11 756mm
1
9960mm
1
10 960mm
1229mm 2
5
754mm 2
14
795mm 2
1
795mm 2
2
1
QC1
D1 1
798mm
D3 1
960mm
B1 4
2
GB
1
K3
1200mm 2
3
796mm 2
4
88
53
22
80
132

16
15
GB 17
17
D1
14 14
B1
B1
1
1
2
2
3
3
4
4
55
K3
QC1
GB
D3
B1
B1
10 11
9
6
6
11

tear down
tear down
-6-

PART
NO. Qty.
2
2
3
4
3
3
4
4
F1
S3
A
tear down
-7-
A
A
A
A
1
1
2
2

PART
NO. Qty.
2
2
2
1
2
A
B
F1
S3
PART
NO. Qty.
2
5
1
1
5
A
C
B
B
AC
F2 S3
-8-
A
A
A
A
B
B
B
B
1
1
2

PART
NO. Qty.
1
16
1
15
1
D1
2
17
1
GB
2
14
2
B1
15
D1
16
D1
16
15
F2
S3
PART
NO. Qty.
17
17
F1
S3
F2S3
F2
GB
B1
B1
F3
F1S3 14
14 F2
S3
16
-9-

-10-
F3
PART
NO. Qty.
1
9
1
10
1
D3
2
11
1
GB
9
D3
10
D3
10
F2
S3
11
11
F1
S3
F2S3
F2
GB
9

2
B1
PART
NO. Qty.
B1
F3
4
6
9
PART
NO. Qty.
F1S3 6
6F2
S3
-11-

-12-
PART
NO. Qty.
2
K3
2
QC1
K3
F3
F2

Metal Garden Shed
OWNER'S MANUAL
Instructions for Assembly
Requires two people and takes 1-1.5 hours for lnstallation.
Quick & Easy Assembly
Ridge Reinforced Walls
Available in Various Sizes
MK2

BEFORE YOU START
Owner's Manual
Prior to installation, it is important that you contact your local government authority to
determine if building approval is required. Study and understand this owner's manual.
Important information and helpful tips will make your construction easier and more
enjoyable.
Assembly instructions
Instructions are supplied in this manual and contain all appropriate information for your
building model. Review all instructions before you begin. During assembly, follow the
step sequence carefully for correct results .Please be aware: this unit takes two people
about one full day to complete.
Parts
Check to be sure that you have all the necessary parts for the building.
Separate contents of the carton by the part number while reviewing parts list.
Familiarize yourself with the hardware and fasteners for easier use during
construction. These are packaged within the carton. Note that extra fasteners have been
supplied for your convenience.
TOOLS MAY REQUIRED
Use heavy duty gloves when handling steel sheets and flashing
PLAN AHEAD
Watch the weather:
Please be sure the day you select for installation is dry and calm.
DO NOT attempt to assemble your shed in windy weather
because of risk of damage to panels, or personal injury. Be careful
of wet or muddy ground.
Teamwork:
Whenever possible, two or more people should work together to
assemble the building. One person can position parts or panels
while the other is able to handle the fasteners and the tools.
It requires two people a full
day to complete installation

PLAN AHEAD
Site Selection
lAvoid overhanging trees as much as possible as leaves will make regular cleaning
necessary and broken branches are a potential hazard.
lSmall trees,bushes or fences nearby can be helpful,acting as a wind break.
Site Preparation
The site must be prepared so that the base of the shed is level all round and checking
with a spirit level is required.
The base can be constructed by treated timber or concrete,in order to stop the moisture
getting into the shed.The shed is not designed to be built onto lawn directly.Also the
ground will get muddy during rainy days.
If a concrete pad is made,it is important that this slopes towards the edges to prevent
water ingress.
Time must be allowed for any concrete or cement to dry before building the shed on top.
Bases can also be constructed from bricks,blocks,or mounted on a concrete pad.
The bricks or blocks should be cemented onto firm and level concrete footings and the
greenhouse frame drilled and screwed to the base.
IMPORTANT NOTES:
lFind someone to help you:it is much easier with someone to hold parts,pass tools
ect.Also some steps require two people to lift structures together.This is not very
heavy work so would suit most able-bodied people.
lAllow plenty of time:rushing often causes errors and the re-doing of incorrect
assemblies.If you have never built a shed before,it can take most of a day to carefully
complete the construction.
lHave the right tools to hand.
lSafety clothing as recommended in the 'Tools' section.
lIdeally lat out the parts and check that all are present before commencing
construction.Lay on cloths or plastic sheets if there is any risk of scratching the parts.
lTighten all nuts carefully,being sure not to miss any.Check the frame is square and
using a spirit level to check that it is upright.

PART
NO. Qty.
PART
NO. Qty.
8
17 796mm
2
16 798mm
F1
F2
S2
S3
F3
2
15 798mm
4
12 1200mm
798mm 4
6
160
74
44
40
228
4
11 756mm
2
9960mm
2
10 960mm
1229mm 4
5
754mm 4
14
795mm 4
1
795mm 4
2
1200mm 2
3
796mm 2
4
2
QC1
D1 2
798mm
D2 2
1200mm
D3 2
960mm
B1 8
4
GB
2
K3

16
15
GB
GB
GB
GB
17
17
D1
16
15 17
17
D1
D2
D2
14 14
B1
B1
14 14
B1
B1
12
12
17
17
12
12
17
17
1
1
1
1
2
2
2
2
3
3
4
4
5
5
55
6
6
D3
D3
B1
B1
B1
B1
9
10
11
11
10
11
K3
QC1 K3
QC1
9
6
6
11

PART
NO. Qty.
4
12
F2
S3
4
17
-6-
2
D2
12
D2
12
D2
12
12
17
17
F1
S3
F2S3
x2
x2
F1
S3

PART
NO. Qty.
2
2
3
4
3
3
4
4
F1
S3
PART
NO. Qty.
4
2
4
1
2
2
1
1
2
2
1
1
A
A
A
A
A
A
B
B
B
B
A
A
A
B
F1
S3
-7-

PART
NO. Qty.
4
51
1
1
15
5
A
CD
B
B
B
A
D
C
F2 S3
PART
NO. Qty.
2
16
2
15
2
D1
4
17
2
GB
x2 15
D1
16
D1
15
F2
S3
17
17
F1
S3
F2S3
F2
GB
-8-
16
Table of contents
Other Moebelix Outdoor Storage manuals
Popular Outdoor Storage manuals by other brands

Patiowell
Patiowell T-PS23-0383A-DGY Assembly instructions

Biohort
Biohort Alex Assembly manual

sweeek.
sweeek. FLANDRE MS884GY manual

Alice's Garden
Alice's Garden FERRAIN manual

Rowlinson Garden Products
Rowlinson Garden Products Potting Store Assembly instructions

Storite
Storite Rite 1 Assembly instructions

USP
USP DURAMAX METAL GARAGE owner's manual

Scotts
Scotts STTEG1014 Series Owner's manual & assembly guide

Arrow Storage Products
Arrow Storage Products CLG87CC Owner's manual & assembly guide

ABSCO SHEDS
ABSCO SHEDS 30082SK-PTX Assembly & instruction manual

Galvo Shed
Galvo Shed GVO 2315 Assembly instructions

Waltons
Waltons 01GRA0301-V2 quick start guide