Cab ing & Insta ation Instructions
1.1 How to remove the cover at the bottom of the
Beacon unit
1.1.1 Press the s eeve down, unti you can see the
edge of the cover (I ustration 1.2)
1.1.2 Pu the cover from the edge of the beacon unit
(I ustration 1.3)
1.1.3 Insert the cab e through opening A at the cover
and connect it to termina b ock- ook at Detai X.
Ensure a good earth connection.
1.2 The insta ation of the cover
1.2.1 Pu down the s eeve at one point. Locate the cover ‘U’
channe over the beacon mou ding, ensuring positive seating
a round.
1.2.2 Do not use any sharp objects for the
assemb y. Any punctures wi impede the IP protection.
2. The insta ation of the p astic co our cap (dome)
2.1 You can oosen the co our cap from the beacon
unit, if you turn and pu simu taneous y
(I ustration 2.1)
2.2 If you put together the g ass co our cap and the
beacon unit, an air buffer wi prevent the fina
assemb y.
Put a paperc ip between the g ass co our cap
and the beacon unit. So the air can escape (I ustration 2.2)
MOFLASH SIGNALLING LTD
UNITS 17,18 & 19, KLAXON INDUSTRIAL ESTATE,
WARWICK ROAD, TYSELEY, BIRMINGHAM,
B112HA ENGLAND
www.mof ash.co.uk
TEL: ++44 (0) 121 707 6681
FAX: ++44 (0) 121 707 8305
plastic