CI-HGS-E Installation, Operating & Service Manual
CAUTION
These baffles will generate higher efficiencies
and lower stack temperatures. Under certain
conditions, a lower gross stack temperature
entering the chimney has the potential to
be cooled below the dew point and create
condensate on interior surfaces. Flue gas
condensate is corrosive, which requires
special consideration and must be addressed
immediately.
DO NOT install baffles until you have read
Sections VI and VII, completely (venting
details).
Step a. Install stainless steel baffles
provided in miscellaneous parts carton
as follows, refer to Table 3 and Figure 9:
• Model CI-HGS-74E - To install
flueway baffle in 2nd pass on left side
of boiler, hold baffle with word “Left”
readable at the top. Slide baffle in
flueway until position tab touches
fins on left side of 2nd pass flueway.
To install flueway baffle in 2nd pass
flueway on right side of boiler, hold
baffle with word “Right” readable at
the top. Slide baffle in flueway until
position tab touches fins on right side
of 2nd pass flueway.
5. Connect Field Wiring.
Step a. Connect the field wiring from
the circulator to the aquastat control.
Make the wiring connections as shown
on Figures 27 or 28.
6. Installing stainless steel flueway baffles. Baffle
requirements differ from model to model, see
Table 3.
NOTE: Read caution statement before
proceeding.
Table 3: Baffle Usage
• Model CI-HGS-101E - To install
flueway baffle in 3rd pass on left side
of boiler, hold baffle with word “Left”
readable at the top. Slide baffle in
flueway until position tab touches
fins on left side of 3rd pass flueway.
To install flueway baffle in 3rd pass
flueway on right side of boiler, hold
baffle with word “Right” readable at
the top. Slide baffle in flueway until
position tab touches fins on right side
of 3rd pass flueway. To install flueway
baffle in 2nd pass on left side of boiler,
hold baffle with word “Left” readable
at the top. Slide baffle in flueway until
position tab touches fins on left side
of 3rd pass flueway. To install flueway
baffle in 2nd pass flueway on right side
of boiler, hold baffle with word “Right”
readable at the top. Slide baffle in
flueway until position tab touches fins
on right side of 3rd pass flueway.
To install combustion chamber ring,
set ring in the front section of the
combustion chamber.
• Models CI-HGS-123E thru CI-HGS-
160E To install flueway baffle in 2nd
pass flueway on left side of boiler,
hold baffle with word “Left” readable
at the top. Slide baffle in flueway until
position tab touches fins on right side
of 2nd pass flueway. To install flueway
baffle in 2nd pass flueway on right side
of boiler, hold baffle with word “Right”
readable at the top. Slide baffle in
flueway until position tab touches fins
on left side of 2nd pass flueway.
NOTE: 2nd and 3rd pass flueway baffle are not
interchangeable.
7. Close the burner swing door and securely seal
the door to the boiler front section by reinstalling
the hardware and securing the door using
procedure previously outlined in Paragraph D
of this section.
Boiler Model
No.
Baffle Usage
2nd Pass 3rd Pass Combustion
Chamber
CI-HGS-74E [2]
P/N 102066-01 None None
CI-HGS-101E [2]
P/N 109902-01
[2]
P/N 100081-01
[1]
P/N 109901-01
CI-HGS-123E [2]
P/N 100042-01 None None
CI-HGS-160E
3Packaged Boiler Assembly - Trim & Controls (continued)
!
NOTICE: When securing burner swing door
make sure door is drawn-in equally on both sides.