
TABLE OF CONTENTS
IMPORTANT SAFETY INFORMATION...................... 3
REQUIREMENTS & CODES .....................................4
Combustion Air Quality............................................5
Heating Load...........................................................5
Installation in a Garage ...........................................5
Operation of Furnace During Construction..............6
Clearances to Combustible Materials......................6
COMBUSTION AIR & VENTING REQUIREMENTS 7
Direct Vent Systems................................................8
Conventional Vent Systems - Confined Spaces......8
Air From Inside......................................................9
Outdoor Air from a Crawl Space or Vented Attic.. 9
Outdoor Air Using Vertical Ducts ..........................9
Outdoor Air Using Horizontal Ducts......................9
Air Directly Through an Exterior Wall.................... 9
Alternate Method of Providing Air from Outside:.. 10
Conventional Vent Systems - Unconfined Spaces. 10
Category IV Venting..................................................10
Vent Pipe Material................................................ 11
Vent Pipe Length & Diameter............................... 11
Vent Pipe Installation ........................................... 12
Outdoor Terminations - Horizontal Venting .......... 12
Outdoor Terminations - Vertical Venting............... 13
Vent Freezing Protection...................................... 13
Existing Installations ............................................ 14
Condensate Disposal ..............................................14
CIRCULATING AIR REQUIREMENTS..................... 14
Plenums & Air Ducts ...............................................14
Return Air Connections ...........................................15
Upflow & Horizontal Furnaces ............................. 15
Downflow Furnaces.............................................. 15
Supply Air Connections...........................................15
Acoustical Treatments............................................... 15
FURNACE INSTALLATION.........................................16
General Requirements ............................................16
Upflow Furnaces......................................................16
Horizontal Furnaces.................................................16
Downflow Furnaces.................................................17
Installation on a concrete slab ............................. 17
Inducer & Venting Options.......................................17
Inducer Assembly Rotation.................................. 17
Pressure Switch Tubing............................................ 18
Accessories.............................................................18
Finish Flange ....................................................... 18
Rubber Grommets ............................................... 18
PVC Components................................................ 19
Typical Orientation......................................... 19
Alternate Orientation ..................................... 19
Condensate Drain Lines ...................................... 20
Bottom Panel Removal............................................20
Alternate Bottom Panel Removal...........................20
GAS SUPPLY & PIPING........................................... 21
Leak Check..............................................................21
High Altitude Application (Natural Gas Only) ..........23
Converting from Natural Gas to LP / Propane.........23
ELECTRICAL WIRING ..............................................24
Line Voltage Wiring.................................................24
Grounding ...............................................................25
Thermostat / Low Voltage Connections..................25
Single Stage AC & Single Stage Thermostat.......26
Single Stage AC & Two Stage Thermostat...........26
Two-Stage AC & Two-Stage Thermostat..............26
Autostaging for Single Stage Thermostats .............26
Autostaging for Two-Stage Thermostats.................27
Blower Speed Configuration...................................27
Fixed Speed Blower Applications.........................27
Variable Speed Blower Applications.....................27
Dehumidification Options........................................27
START-UP & ADJUSTMENTS ..................................28
Pre-Start Check List................................................28
Start-up Procedures................................................28
Verifying & Adjusting Input Rate .............................28
Verifying & Adjusting Temperature Rise .................28
Heat Anticipator.......................................................28
Verifying Burner Operation......................................29
Verifying Operation of the Supply Air Limit Switch. 29
OPERATING SEQUENCE.............................................30
Heating Cycle..........................................................30
Cooling Cycle..........................................................30
Fan Mode .............................................................30
MAINTENANCE ..............................................................30
FIGURES &TABLES...................................................32
Figure 28. *TC & *TL Cabinet Dimensions...........32
Airflow Data.............................................................33
Table 6.*TC / *TL Heating / Cooling Airflows
(CFM) & Temperature Rises (°F) ............33
Table 7.*TC / *TL Nominal Heating Airflows
(CFM) & Temperature Rises (° F) for
Variable Speed Furnaces........................34
Table 8.*TC / *TL Nominal Cooling / Heat
Pump Airflows (CFM) for Variable
Speed Furnaces......................................35
Gas Information.......................................................36
Table 9.Gas Flow Rates.......................................36
Table 10. Gas Pipe Capacities .............................36
Table 11. High Altitude Deration - Propane Gas.. 37
Table 12. Natural Gas Heating Values...................37
Table 13. High Altitude Deration - Natural Gas
with HIGH Heating Value........................38
Table 14. High Altitude Deration - Natural Gas
with LOW Heating Value.........................38
Electrical Information...............................................39
Figure 29.Two-Stage Fixed Speed Motor
Control Board.......................................39
Figure 31.Two-Stage Furnace Control Board......39
Figure 30.Two-Stage Variable Speed Motor
Control Board.......................................39
Figure 32.Wiring Diagram for Two-Stage, Fixed
Speed Upflow Furnaces......................40