INDEX Page
0. Introduction .................................................................................................................... 2
1. Handling and Storage……………………………………………………………………………. 2
2. Installation ..................................................................................................................... 3
2.1. Slide Gate installation............................................................................................... 3
2.2. Concrete Wall Mounted............................................................................................ 5
2.3. Concrete Round Manhole Wall Mounted………………………..………………...………. 7
2.4. Wall Thimble Mounted.............................................................................................. 7
2.5. Installation of Stem Extension, Stem Guides and Floor Stand........................................ 8
2.6. Installation of Stem Extension, Stem Guides and Floor Stand........................................ 9
3. Operation......................................................................................................................... 10
4. Maintenance..................................................................................................................... 11
4.1. Cleaning and lubrication............................................................................................ 11
4.2. Seal replacement (for RS MU up to 1200mm/48”)………………...…….……...…..…..... 12
4.3. Seal replacement (for NRS MU up to 1200mm/48”)…………………………..…………..13
4.4. Seal replacement (for RS MU from 1200mm/48” to 2000mm/80”).............................. 14
4.5. Seal replacement (for NRS MU from 1200mm/48”to 2000mm/80”)........................... 15
4.6. Bottom Seal replacement (for MU up to 1200mm/48”)................................................. 16
4.7. Bottom Seal replacement (for MU from 1200mm/48” to 2000mm/80”)……….....…….16
5. Trouble shooting............................................................................................................... 17
6. Annex: civil work acceptable tolerance............................................................................... 18
7. Environmental considerations............................................................................................. 19
INTRODUCC
0. INTRODUCTION
•This manual describes the recommended procedures for installation, operation, maintenance and
safety precautions for ORBINOX MU model slide gates
•Please read thoroughly all the instructions in the manual prior to installation and contact an ORBINOX
representative in case of any questions
•The manual makes reference to the “General Arrangement Drawing” (GAD). The GAD is the drawing
that is sent to and approved by the customer prior to the production of the slide gate
•ORBINOX assumes no responsibility or liability if the slide gate is not installed, operated and
maintained in strict accordance to the procedures described in this manual
1. HANDLING AND STORAGE
Standard safety procedures should be followed to prevent personal injury or equipment damage.
Additionally, the following instructions shall be followed during handling and storage to prevent any
damage of the product:
•Stems have precision surfaces and should never be used as a mean to lift the slide gate
•Equipment shall be stored in a dry, clean and even area on a raised even wood surface to prevent
distortion of the frame
•Do not stack slide gates
•Stems and extensions that are shipped separately shall be supported over their entire length to prevent
any bending or distortion while in storage2.-

EDITION 09-2020
MU-3/19
MODEL
MU SLIDE GATE
Reserves the right to change specifications without notice
www.orbinox.com
2. INSTALLATION
This section describes the different installation methods:
•First, the slide gate is installed (wall mounted, concrete wall mounted, round manhole mounted, or wall
thimble mounted)
•Once the gate is installed, stem Extension, stem guides and floor stand must be installed
2.1. Slide Gate installation
▶Required Materials:
•ORBINOX MU slide gates are installed by means of Anchor Bolts. Depending on the size and working
conditions they shall be either of the mechanical or chemical type. In order to get the expected
performance of the anchor bolts, the minimum concrete strength shall be 25Mpa (3,625 PSI)
•In order to avoid leakage between the concrete wall and the frame construction sealant shall be used.
(Sikabond or Sikaflex 11FC Sealant or equivalent, 200ml per meter of opening perimeter). As an
alternative, self-adhesive commercial sponge EPDM strips, approximately 20mm/0,80” wide by
10mm/0,40” thick, can be used and glued to the slide gate around the hole
•For detailed information about the type, size and quantity of the required anchor bolts, or any other
specific installation notes or materials, please refer to the notes on the ‘General Arrangement Drawing’
▶Installation procedure:
Step 1: Concrete wall surface check
•The concrete construction shall be flat, level and plumb, and shall be in accordance to DIN 18202 or
ACI 117-06 standards (see section 6). If necessary, use non-shrink grout in order to meet the specified
standard
•Concrete wall surface shall be dry (so the construction sealant sets effectively). If it is necessary. the
wall can be dried with the help of a blowtorch or a hot air fan
Step 2: Reference lines
•Reference lines shall be marked on the wall
in order to assure a proper alignment
between the slide gate and the opening
during the installation:
• Measure the top width of the frame (“d”)
and mark a horizontal line on the wall (RL-
1), parallel to the opening and to the
measured distance
• Mark a vertical line on the vertical
symmetry axis of the opening (RL-2)
Figure 1
Back side of slide gate

EDITION 09-2020
MU-4/19
MODEL
MU SLIDE GATE
Reserves the right to change specifications without notice
www.orbinox.com
Step 3: Pre-installation of the slide gate
•Place the slide gate against the wall and line up
with the opening. Use previously marked
reference lines for proper alignment. The gate
shall be in the closed position
•Drill and install an anchor bolt on each side of
the gate. After installing the first anchor bolt, and
prior to drilling the hole on the other side, make
sure the frame is perfectly levelled
Figure 2
Step 4: Construction sealant application
In order to avoid leakage between the frame and
the wall, construction sealant shall be applied
on the frame:
•Remove the slide gate from the wall (first remove
the nuts of the anchor bolts)
•Apply construction sealant all around the
perimeter of the frame. Sikabond or Sikaflex
11FC (200 ml/m) or equivalent construction
sealant shall be used. Be sure not to get sealant
on the gate’s seals, guides, and/or stem, as this
may cause leakage or damage
Figure 3
Step 5: Final installation of the slide gate
•Re-install the slide gate on the wall and tighten
both anchor bolts
•Drill and install the rest of the anchor bolts (see
Figure 4)
•CAUTION!: If the slide gate is not completely in
contact with the wall, do not over-tighten the
anchor bolts. Over tightening may bend or
distort the frame. If the wall flatness and levelness
is according to the specified standards, the
construction sealant will fill in the remaining void
(see Figure 5)
•Apply construction sealant around the frame in
order to fill in any existing gap between the wall
and the frame (this step is only for esthetics).
Wipe away the excess sealant to leave a smooth
finish
Anchor bolt
Anchor bolt
Figure 4
Figure 5

EDITION 09-2020
MU-5/19
MODEL
MU SLIDE GATE
Reserves the right to change specifications without notice
www.orbinox.com
2.2. Installation: concrete wall mounted
▶ Required Materials:
•Some slide gates require installation type embedded in concrete, mainly when working with unseating
pressure and/or large opening sizes
•The civil work shall be prepared to fit the slide gate (see Figure 6). Appropriate recesses are required for
the frame (Refer to the GAD for dimensional information)
•The concrete wall thickness shall be designed to withstand the loads defined in the GAD. In addition, the
civils must have a predetermined height (see the GAD) in order to be able to fix the slide gate on top of
it. In order to effectively transmit the loads from the frame to the concrete, ORBINOX recommends welding
the existing rebar to the frame ribs prior to pouring the second phase of concrete. It is not ORBINOX’s
responsibility to specify the required wall thickness and to define the amount of rebar to be welded
•To fix the slide gate and prevent it from moving during Second Phase of concrete, mechanical anchors
are required. Please refer to the notes on the GAD for specific information about the installation method
and the required materials (type, size and quantity of anchor bolts, construction sealant, etc.)
Figure 6
▶ Installation procedure:
Step 1: Concrete wall surface check
•The concrete construction shall be flat, level and plumb, and shall be in accordance to DIN 18202 or ACI
117-06 (see section 6). If necessary, use non-shrink grout in order to meet the specified standard
•It is necessary the presence of work rebar in the wall recess (to be able to weld the frame to the rebar).
Alternatively, chemical anchors can be installed
First Phase
of Concrete
Opening Width
Existing
rebar
The concrete wall thickness
shall be designed to
withstand the loads

EDITION 09-2020
MU-6/19
MODEL
MU SLIDE GATE
Reserves the right to change specifications without notice
www.orbinox.com
Step 2: Level and secure the slide gate in place
•Present the slide gate in position in front of the
wall opening (using a crane). If the thickness of
the civils is correct, install the upper levelling
brackets. If it is not possible, continue handling
the gate with a crane
•Apply construction sealant at the back side of the
frame. Use elastic sealant Sikabond or Sikaflex
11FC (200 ml/m) or equivalent
•Align the gate vertically adjusting the levelling
bolts, placed in the invert of the frame (see Figure 7)
•Place the lintel completely on the wall and make
sure that the slide gate is aligned vertically
•Present the slide gate to its required position:
oAdjust beforehand and install the bottom
levelling brackets against the floor using
mechanical anchors
oFix the lintel by means of two mechanical
anchors
oInstall the chemical anchors of the lintel
oWeld the frame to the existing rebar
:
Levelling bolts
:
Fixing brackets and mechanical
anchors
Step 3: Second Phase of Concrete
Pour the second phase of concrete. Do not pour in
more than one meter concrete columns to avoid
damage to the frame. (see Figure 8)
Figure 7
Figure 8

EDITION 09-2020
MU-7/19
MODEL
MU SLIDE GATE
Reserves the right to change specifications without notice
www.orbinox.com
2.3. Installation: round manhole mounted
•Follow the instructions of “Concrete Wall Mounted” installation. Anchor bolts shall be installed
perpendicular to the surface
2.4. Installation: wall thimble mounted
▶Required Materials:
•ORBINOX Wall Thimble Mounted MU Slide Gates are installed by means of Hex Bolts.The flange,
which is embedded in concrete, consists of threaded holes that correspond to the slide gate's anchorage
holes
•A sponge EPDM seal must also be used between the flange and the slide gate frame to prevent leakage
between them
•For detailed information about the size and quantity of the required bolts, or any other specific
installation notes or materials, please refer to the notes on the ‘General Arrangement Drawing’
▶ Installation procedure:
•Screw the slide gate to the flange at all four corners, placing the sponge EPDM seal between both sides,
and check that slide gate is perfectly aligned with the flange opening
•Install the rest of the bolts

EDITION 09-2020
MU-8/19
MODEL
MU SLIDE GATE
Reserves the right to change specifications without notice
www.orbinox.com
2.5. Installation: stem extension, stem guides and floor stand
Procedure for open-frame and rising-stem configurations:
1. Connect the stem extension to the slide gate (Figure 9-A and Detail A). Connect the stem extension
(item 1) using the pin (item 4) In order to be able to do so, the washer (item 2) and the cotterpin
(item 3) shall be removed and re-installed
2. Insert all stem guides from the top of the stem extension. Align stem extension, and especially
make sure it is aligned with the vertical axis of the opening (see Figure 7). The maximum misalignment
shall be 3mm /0,12”
3. Next, install (drill and tighten anchor bolts) all stem guides except the first one (see Figure 9-B, “Stem
Guide-1”). Refer to General Arrangement Drawing for dimensions Dist-1 and Dist-2 (see Figure 9-B).
4. Thoroughly clean and grease the threaded part of the stem and the nut in the operator
5. Position the floor stand and the operator. Engage the stem in the stem nut and turn the pedestal and the
operator to bring it to the operating floor level. Make sure that the stem extension is perfectly aligned
and parallel to the wall surface, adjusting the offset if necessary, of the ‘Stem-Guides’ (U)HMWPE inserts.
Once the stem extension is perfectly aligned, install the floor stand (drill and tighten anchor bolts)
6. Operate the slide gate and bring it to the open position. Install “Stem Guide-1”, so the top of the slide
hits on the stem guide. Note that “Stem Guide-1” is installed in the orientation shown in figures 9-B and
9-C ((U)HMWPE insert down). Some other models incorporate extended frame, which also works as
mechanical stop for the OPEN position (see Figure 9-D). In any case, consult the GAD
(A)
(B)
(C) (D)
Figure 9
Handwheel
Ajust stem-
extension alignment
Ajust offset distance
from wall
Ajust stem-
extension alignment
Stem Guides
Stem Guides-1
Stem Nut
Floor Stand
Connect the extension to the
slide gate
Stem
1
2
3

EDITION 09-2020
MU-9/19
MODEL
MU SLIDE GATE
Reserves the right to change specifications without notice
www.orbinox.com
2.6. Installation: stem extension, stem guides and floor stand
Procedure for self-contained-frame and non-rising-stem configurations
1. Connect the stem extension (item 3) to the shaft (item 1) on top of the yoke (see Figure 10-A, Detail B)
2. Insert all stem guides from the top of the stem extension. Align stem extension, and especially make sure
that it is aligned with the vertical axis of the opening (see Figure 10-B)
3. Next, install all stem guides. (drill and tighten anchor bolts). Refer to General Arrangement Drawing
for dimensions (“Dist 1” in Figure 10)
4. Position the floor stand and the operator. Engage the shaft of the stem extension with the operator. Make
sure that the stem extension is perfectly aligned and parallel to the wall surface, adjusting the offset if
necessary of the Stem-Guides’ (U)HMWPE inserts (see Figure 10-C). Once, the stem extension is
perfectly aligned, install the floor stand (drill and tighten anchor bolts)
(A)
(B)
(C)
Figure 10
B

EDITION 09-2020
MU-10/19
MODEL
MU SLIDE GATE
Reserves the right to change specifications without notice
www.orbinox.com
3. OPERATION
Initial Operation:
Before cycling the slide gate, make sure there are no foreign deposits or materials on the seals, guides or
sealing area. Gate seals could be damaged if the area is not cleaned and coated with a light grease. Please
refer to section “
Materials needed for maintenance and seal replacement
”for detailed information about
the grease type (see section 4.1)
•Manual
Apply a light grease on the stem before initial operation after the installation. If the operation is difficult
due to high torque, stop operation of the gate and check stem alignment
•Electric actuator
oRefer to the electric actuator manufacturer instruction manual before commissioning the slide gate
oElectric actuators must be limited with limit and torque switches. Electric actuators without these limiters
shall not be used with ORBINOX slide gates. Electric actuators must be adjusted at the time of
installation on site (except in the case of a self-contained frame and yoke-mounted actuators; in this
case the motor is factory-set). To adjust the limit switches, follow the next instructions using values of
the GAD:
•Position the slide in the nearly closed position (leave 10mm/0,40” open). From this position,
manually (using the handwheel) operate the slide until it is completely closed (check tightness with
a 0,05mm/0,002” gauge). In this position, set the limit switch for the CLOSED position
•Position the slide in the nearly open position (leave 10mm/0,40” closed). From this position,
manually (using the handwheel) operate the slide until it is completely open. In this position, set
the limit switch for the OPEN position
oBe aware when the gate is almost fully OPEN or CLOSED. If the gate does not stop once the fully
open or fully closed position is reached, stop immediately and correct adjusting again the limit and
torque switches
Operation:
•CAUTION! Do not force the operator to close the gate, as it may cause damage to the stem and it does
not improve the sealing system. The maximum applicable force on the handwheel is 25 kg /55 lbs
•The MU slide gate is closed by a clockwise rotation, and opened by a counter-clockwise rotation of the
operator
•The mechanical limit switch for the OPEN position is operated by a mechanical stop on the side of
frame. For some gates with open frames, the limit switch is made by means of the first wall bracket (see
the GAD)
•The MU slide gate is designed to be self-locking, so that the slide maintains its position in any position

EDITION 09-2020
MU-11/19
MODEL
MU SLIDE GATE
Reserves the right to change specifications without notice
www.orbinox.com
4. MAINTENANCE
4.1. Cleaning and lubrication
ORBINOX model MU slide gates need practically no maintenance. In order to assure maximum
performance of the slide gate, the following maintenance inspections shall be carried out periodically
every 6 months:
•Stem and stem nut shall be cleaned and greased. For non-rising stem configurations, the stem may be
in contact with water and dirt. Under these conditions, the threads of the stem and/or stem nut may to
wear, and they shall be checked every 3 months
•Clean the gate with clear water and remove any deposits, especially on the seals and in the guides
•Check the seals and make sure they are not damaged. Seals shall be replaced if damaged (See sections
4.2, 4.3, 4.4, 4.5, 4.6 y 4.7)
•Seals shall be wet while operating. If the slide gate has not been used for a long period of time under
dry conditions, the seals shall be wetted with clear water before operating the slide gate. If the slide
gate is operated with dry seals, a higher operating torque will be required, and the seals may be
damaged
Spare parts:
ORBINOX does not recommend stocking any spare parts by the owner of the equipment as the slide
gates are designed for a very long life cycle. If a repair part is required, please contact an ORBINOX
representative and provide the following information:
•ORBINOX S/O number
•“ORBINOX General Arrangement Drawing” number
•Project name (if applicable)
•Vendor’s company name
Materials needed for maintenance and seal replacement:
Material
Type
Recommended or equivalent
Silicone
Silicone Rubber
Dow Corning RTV 732
Grease
Silica-Gel Silicone Grease
Verkosil G-2 (non-toxic)
Glue
Instant adhesive
Loctite 406 and Cleaner 770

EDITION 09-2020
MU-12/19
MODEL
MU SLIDE GATE
Reserves the right to change specifications without notice
www.orbinox.com
4.2. Seal replacement procedure (for RS configuration slide gate and up to 1200mm /48”)
•Step 1: From the closed position, raise the slide around 10mm/0,40”
•Step 2: Unscrew the nuts of the lateral anchor bolts (item 10)
•Step 3: Remove stem extension coupling pin (item 1)
•Step 4: Unscrew bolts (item 2) with caution, as major components of the gate are no longer secured
•Step 5: Remove frame guides (item 3), (U)HMWPE guides (item 4) and slide (item 5)
•Step 6: Unscrew bolts (items 6) and remove retainers (items 7 and 8)
•Step 7: Remove seal (item 9) and replace it by the new seal. Before installing the new seal, apply
silicone on the frame invert, where the seal will be in contact with it (see detail A). After installing the new
seal, apply grease on it to ease operation
Reassembly:
•Follow Steps 7 to 1. To reassemble in Step 5, first place one of the (U)HMWPE guides (item 6) on the
anchor bolt rods. Next, take the slide (item 5) and attach the other (U)HMWPE guide onto it. Finally,
mate the whole unit to the previously positioned (U)HMWPE guide
NOTE: the shaft must be completely empty to carry out this maintenance operation as the seals are bolted
to the frame
Figure 11

EDITION 09-2020
MU-13/19
MODEL
MU SLIDE GATE
Reserves the right to change specifications without notice
www.orbinox.com
4.3. Seal replacement procedure (for NRS configuration slide gate and up to 1200mm/48”)
•Step 1: From the closed position, raise the slide around10mm/0,40”
•Step 2: Detach the stem extension (if applicable). The stem extension needs to be held in place, otherwise
it will fall. Clamp the extension and lean it on the stem guide (if applicable) or on the operating floor
•Step 3: Unscrew nuts and washers of lateral anchor bolts (items 1 and 2)
•Step 4: Unscrew bolts (item 3) with caution, as major components of the gate are no longer secured
•Step 5: Remove the ‘yoke (item 7), stem (item 9), slide (item 8), and frame guides (item 5) as one unit
•Step 6: Unscrew bolts (item 10) and remove the seal retainer (items 11 and 12)
•Step 7: Remove seal (item 9) and replace it by the new seal. Before installing the new seal, apply silicone
on the frame invert, where the seal is in contact with it (see detail A). After installing the new seal, apply
grease on it to ease operation
Reassembly:
•Follow Steps 7 to 1. To reassemble Step 5, first place one of the (U)HMWPE guides (item 6) on the anchor
bolt rods. Next, take the yoke, stem, slide, and frame-guides as one unit, and attach the other (U)HMWPE
guide onto it. Finally, mate the whole unit to the previously positioned (U)HMWPE guide
NOTE: the shaft must be completely empty to carry out this maintenance operation as the seals are bolted to
the frame
Figure 12

EDITION 09-2020
MU-14/19
MODEL
MU SLIDE GATE
Reserves the right to change specifications without notice
www.orbinox.com
4.4. Seal replacement procedure (for RS configuration slide gate from 1200mm/48”
to 2000mm/80”)
•Step 1: Start from closed position
•Step 2: Remove the stem extension pin (item 2) and uncouple the stem extension (item 3) from
the slide (item 1). See “Detail A”
•Step 3: Unscrew the nuts and washers (items 8 and 9) of stem guide (item 7)
•Step 4: Unscrew the nuts and washers (item 5 and 6) of floor stand (item 4)
•Step 5: Move the set Floor Stand and Stem Extension (items 3 and 4) in order to be able to remove
the slide (item 1)
•Step 6: Remove the slide (item 1) from the frame
•Step 7: Unscrew bolts and nuts (items 12 and 13) from the retainers (items 10 and 11)
•Paso 8: Remove seal (item 14) and replace it by the new seal. Apply glue where the bottom seal and
side seals join. After installing the new seal, apply grease on it to ease operation
Reassembly:
Follow Steps 8 to 1
Figure 13 Figure 14

EDITION 09-2020
MU-15/19
MODEL
MU SLIDE GATE
Reserves the right to change specifications without notice
www.orbinox.com
4.5. Seal replacement procedure (for NRS configuration slide gate from 1200mm/48”
to 2000mm/80”)
•Step 1: Start from closed position
•Step 2: Uncouple the stem extension (if necessary). The extension must be attached to one of the wall
brackets or to the floor stand
•Step 3: Remove the yoke from the slide gate (item 5), the stem (item 8) and the gate (item1) as a single
unit. To do this, first loosen the bolts and nuts (items 6 and 7) from the yoke
•Step 4: Unscrew the bolts and nuts (items12 and 13) from the seal retainers (items 10 and 11)
•Step 5: Remove the seal (item14) and replace it with the new one. Apply adhesive in the seal area
between the bottom seal and the side seals. Once the new seals are installed, grease them to facilitate
the operation of the product
Reassembly:
Follow Steps 5 to 1
Figure 15
Figure 16

EDITION 09-2020
MU-16/19
MODEL
MU SLIDE GATE
Reserves the right to change specifications without notice
www.orbinox.com
4.6. Bottom seal replacement (para MU menor o igual que 1200mm/48”)
Bottom seal replacement procedure*:
•Step 1: From the closed position, raise the slide (item 4), around 50mm/2”
•Step 2: Unscrew bolts (item 1) and remove the bottom retainer (item 2)
•Step 3: Replace the bottom seal (item 3). Once the screws on the bottom seal retainer have been tightened,
check that the seal is uniformly set
Reassembly:
Follow Steps 3 to 1
NOTE: The figure shows the slide gate removed from the wall in order to ease the identification of the
different parts. However, there is no need to remove the frame or the slide from the wall to replace the
bottom seal
Figura 17
4.7. Bottom seal replacement (MU from1200mm/48” to 2000mm/80”)
Bottom seal replacement procedure*:
•Step 1: From the closed position, raise the slide (item 5), around 50mm /2”
•Step 2: Unscrew bolts and nuts (item 1 and 2) and remove the bottom retainer (item 3)
•Step 3: Replace the bottom seal (item 4). Apply glue where the bottom seal and side seals join
Reassembly:
Follow Steps 3 to 1

EDITION 09-2020
MU-17/19
MODEL
MU SLIDE GATE
Reserves the right to change specifications without notice
www.orbinox.com
•NOTE: The figure shows the slide gate removed from the wall in order to ease the identification of
the different parts. However, there is no need to remove the frame or the slide from the wall to
replace the bottom seal
Figura 18
5. TROUBLE SHOOTING
SYMPTOM
CAUSE
SOLUTION
Leakage between
slide
gate and concrete
wall
Concrete wall does not
meet the required std
Un-install the slide gate and fix
the wall
Not enough construction
sealant
Un-install the slide gate, clean
the wall and apply a new layer of
construction sealant
Loose anchor bolts
Tighten anchor bolts
Incorrect anchor bolts
Check the ‘General Arrangement
Drawing’ and make sure the right
anchor bolts have been installed
Leakage through
the seal
Damaged seal
Replace seal
Leakage through
the bottom
seal
Foreign material trapped
between frame invert and
slide
Remove the foreign material.
Check if there is any damage to
the seal
Damaged bottom seal
Replace bottom seal
Excessive force
required
to operate the
slide gate
Misaligned stem extension,
stem guide, or floor
stand
Check and adjust alignment of
stem extension, stem guide or
floor stand
Dirty stem and/or stem
nut
Clean and lubricate stem and/or
stem nut

EDITION 09-2020
MU-18/19
MODEL
MU SLIDE GATE
Reserves the right to change specifications without notice
www.orbinox.com
6. ANNEX: CIVIL WORK ACCEPTABLE TOLERANCE
•X: opening width
•Y: opening height
•YY: invert to coping distance
•DLx: linear deviation (with respect X)
•DLy: linear deviation (with respect Y)
•DLyy: linear deviation (with respect YY)
•DAy: angular deviation (with respect Y)
•DAx: angular deviation (with respect X)
•DAyy: angular deviation (with respect YY)
•DFy: flatness deviation (with respect Y)
•DFx: flatness deviation (with respect X)
•DFyy: flatness deviation (with respect YY)
Deviations shall be within the tolerances defined in DIN 18202. Specifically:
Deviation
Maximum deviation (according to standard)
Linear deviation (DLx, DLy, DLyy):
DIN 18202, table 1, group 2 (for DLx and DLy)
DIN 18202, table 1, group 5 (for DLyy)
Angular deviation (DAx, DAy, DAyy)
DIN 18202, table 2
Flatness deviation (DFx, DFy, DFyy)
DIN 18202, table 3, group 7
The following tables show the tolerances defined in DIN18202:
DIN 18202
TABLE 1
Group
Applicable to
Max. admissible deviation (mm) for target size (m)
≤1
> 1 ≤3
> 3 ≤6
> 6 ≤15
>15 ≤30
>30
Linear deviation
Group 2
DLx, DLy
+-10
+-12
+-16
-
-
-
Group 5
DLyy
+-10
+-16
+-16
+-20
+-30
+-30
DIN 18202
TABLE 2
Group
Applicable to
Max. admissible deviation (mm) for target size (m)
≤0,5
>0,5 ≤1
≥ 1 < 3
≥ 3 < 6
≥ 6 < 15
≥15 ≤ 30
≥ 30
Angular deviation
DAx, DAy, DAyy
3
6
8
12
16
20
30
DIN 18202
TABLE 3
Group
Applicable to
Max. admissible deviation (mm) for target size (m)
< 0,1
≥0,1 < 1
≥1 < 4
≥4 < 10
≥4 < 10
Flatness deviation
Group 7
DFx, DFy, DFyy
2
3
8
15
20

EDITION 09-2020
MU-19/19
MODEL
MU SLIDE GATE
Reserves the right to change specifications without notice
www.orbinox.com
7. ENVIRONMENTAL CONSIDERATIONS
• The packaging is made from environmentally friendly materials. Dispose of the packaging through the
available recycling channels
• The valve is designed and manufactured with materials that can be recycled by specialised recycling
firms. Once the life of the product is expired, you have to consider a proper disposal of the product in
order to prevent any negative impact on the environment and allows for the recycling of valuable
commodities
• Please follow the local environmental rules in your country for proper disposal
Other manuals for MU
4
Table of contents
Other Orbinox Fencing & Gate manuals
Popular Fencing & Gate manuals by other brands

Fortress Building Products
Fortress Building Products Evolver Series installation instructions

XCEL
XCEL EGBR5842-T2P installation guide

U-Line
U-Line H-5615 manual

Heras
Heras uGate21 installation manual

Fortress Building Products
Fortress Building Products OASIS installation instructions

NORTH STATES
NORTH STATES 4957 instructions