
1
1
2
2
3
3
4
4
A A
B B
DRAWN
5/1/2013
SIZE SCALE
DWG NO REV
SHEET 3 OF 3
DG
CSHF8212S.iam
B
DATE
PROJECT
DEALER
72 & 82 SF SHELVING
ORDER NO:
6
5
1
2
2
5
6
3
4
Step One: Place base on floor with finished edge facing out and
groove for optional back facing up.
Step Two: Attach left hand end
panel to base. Align grooves for
back panel with grooved rail on
base. Secure with hand tightened
1-3/4” hex bolt and washer
through each hole in the base
into the threaded insert in the end panel.
Step Three: Minifix the center rail to the left
end panel at the groove for the back panel.
Insert the bottom back panel before
setting the rail.
Step Four: Attach right end panel to the base using
1¾” hex bolts.
Step Five: Slide in the top half of the back.
Step Six: Place shelving soffit
between the left and right hand
end panels aligning the side
holes in the soffit with those in
the end panels. Secure with hand
tightened 1-3/4” hex bolt and washer through each hole in
the soffit into the threaded insert in the end panel.
Note 72 and 82h units have inverted soffit.
Step Seven: Tighten all hex bolts with socket or wrench.
Adjust base, top and end panels to straighten the units.
Step Eight: OXFORD SHELVING ONLY: Place base shelf
with counter sunk holes facing up on the base frame. Use
the two 1-1/2” screws in each hole to secure the base shelf
to the frame.
Step Nine: Set each adjustable shelf with four shelf pins in
notches on the shelves.