PanelClaw clawFR 5 Degree User manual

9910048 RevC February 2020
Table of Contents
clawFR 5 Degree
Installation Manual
ANSI/UL 2703
System Fire Class Rating: Class A for low slope roofs with Type I & Type II Modules
Mechanical Load Rating: See Appendix B: UL 2703 Grounding
Introduction & Safety Overview 2
System Components 3
Tools, Torque, Construction Aid &
Accessories
4
Construction Aid Setup 5
Build Assemblies 6
Build North Array Row 7
Build Remaining Rows 8
Place Ballast 9
Install Module Low Side 10
Install Module High Side 11
Continue Installing Modules 12
Install Deflectors 13
Cam & Lock Claw Inspection 14
Electrical Grounding 15
Appendix A-F 16-24

9910048 RevC February 2020
Introduction
The clawFR 5 Degree flat roof mounting system is
comprised of four major components that intuitively
assemble into a support structure for photovoltaic (PV)
modules.
This installation manual explains how to build a PV array
using clawFR 5 Degree.
PAGE 2
Mechanical Attachments
THIS INSTALLATION MANUAL DOES NOT COVER THE
SELECTION OR INSTALLATION OF MECHANICAL
ATTACHMENTS INCLUDING MATERIALS AND FASTENERS
USED TO SECURE AND/OR SEAL MECHANICAL
ATTACHMENTS TO THE ROOF. PLEASE SEE OEM
PROVIDER INSTALLATION MANUALS AND RELATED
LITERATURE. A LIST OF OEM PROVIDERS IS SHOWN
BELOW.
OEM MECHANICAL ATTACHMENT PROVIDERS:
•Anchor Products: www.anchorp.com
•OMG Roofing Products: www.omgroofing.com
•Facet: www.sustainabletechnologiesllc.com
Safety Overview
Safety is an essential part of every PV installation and every construction
site. It is imperative to plan ahead for any safety concerns and hazards to
promote safe work practices during installation. This section does not claim
to address or support all safety concerns that may arise during the
installation of PanelClaw mounting systems or any other aspect of the work
being performed. Before beginning work, installers should refer to all local
and federal safety, health, and regulatory requirements to assure
compliance. Refer to OSHA Part 1926 and its related Subparts for federal
construction related regulations and standards.
Appendix A: Safety outlines some of the major hazards to be aware of during
the installation of PanelClaw products.
PRIOR TO INSTALLATION, READ THE SAFETY PROVISIONS
ATTACHED IN Appendix A: Safety AND REVIEW THIS INSTALLATION
MANUAL IN ITS ENTIRETY.
A CORROSION INSPECTION ONE YEAR AFTER INSTALLATION AND
ONCE EVERY THREE YEARS THEREAFTER IS REQUIRED TO MAINTAIN
THE PRODUCT WARRANTY. VISIBLE SURFACE RED RUST ON ZAM®
COATED STEEL COMPONENTS MUST BE LOCALLY COATED WITH A
COMMERCIALLY AVAILABLE GALVANIZED PAINT OR COATING TO
MAINTAIN PRODUCT WARRANTY.
EXCEPT FOR DEFLECTORS, ALL RACKING COMPONENTS IN EACH SUBARRAY AND THEIR CONNECTIONS, BALLAST, AND MECHANICAL
ATTACHMENTS (IF ANY IN DESIGN) MUST BE INSTALLED BEFORE MOUNTING MODULES. WHEN FORECASTED WIND GUSTS EXCEED
25% OF THE WIND SPEED LISTED IN THE SITE CRITERIA TABLE OF THE RACKING CONSTRUCTION SET, DEFLECTORS MUST BE INSTALLED
ON ALL MOUNTED MODULES TO AVOID POSSIBLE SYSTEM DAMAGE.

9910048 RevC February 2020
Ballast Block: Solid cap concrete roof paver, conforms to ASTM C1491 standard and manufactured for freeze-thaw
resistance where applicable. See Appendix E for more details.
System Components
PAGE 3
M6x16mm Bolt
2000697
Wind Deflector
2000899[01/02/03/04]
2000699 [01/02/03]
Cam Claw
2000673
Hardware Kit for
Mechanical
Attachment Strut
5000223
For Fully Attached or
Partially Attached Designs
Rail
2000695 Mechanical
Attachment Strut
2000830
Cam
5000515
Module Connector
5000523 [01/02]
Base
500050202
See: 9910047 - Accessories Installation Manual

9910048 RevC February 2020
Torque Setting
*
Fastening Operation
6 ft
-lb (8.1 Nm)
All System connections
except
Special Cases
4 ft
-lb (5.4 Nm)
Special Cases, See Appendix F
Spacer Stick
Construction Aids
Drill with torque limiter or Torque Wrench
10 mm Magnetic Socket
ALERT: NO IMPACT DRIVERS
Tools
Cam Spacer / Lock Claw Insertion Depth Gauge
Optional Accessories
Shim Pad
5000228
Optimizer Attachment
5000509
Wire Router
500022501
Base Pad
2000678
*+/-4% allowable during installation
Wire Clip
5000226
PAGE 4
Spacer Stick and Cam Spacer Kit
5000510
Note: Use of non-UL listed accessories, including non-metallic components, does not affect the system ANSI/UL 2703 certification.
Bolts which are installed into a pre-installed nut
are tightened to 6 ft-lb.
Bolts which are installed into a pilot hole are
tightened to 4 ft-lb, See Appendix F.
See: 9910047 - Accessories Installation Manual

9910048 RevC February 2020
1. Construction Aid Setup
2X
3X
1X
5X
Tip: L, S, and Cam Spacer dimensions are found in the
Racking Construction Set.
1.1 Assemble the Spacer Stick and adjust to L & S dimensions.
All dimensions are measured from the Base centerlines.
1.2 Insert the bolt and adjust the Cam Spacer to the Cam
Spacing dimension.
Adjust Spacer Stick
Spacing SSpacing L
PAGE 5
Typical Cam
Spacer Usage
Cam Spacer / Lock Claw
Insertion Depth Gauge
Cam
Spacing

9910048 RevC February 2020
+ +
Base
(qty 1 or 2) Module Connector Cam
Hole 1
Hole 3
Hole 2
Tilt Arm
2. Build Assemblies
PAGE 6
2.1 Position components as required per assembly type and loosely
assemble the Cam, Module Connector and Base.
ALERT: Note location of orientation marker on Base “ ”
Tip: Base length may vary depending on the row spacing option.
Tip: Immediately tighten bolts to 6 ft-lb which are at the Tilt Arm
end of the assembly.
2.2 Use the Cam Spacer tool to correctly locate the module connector.
Tighten bolt to 6 ft-lb.
South
Assembly
Hole 2
Middle
Assembly
Hole 1
Hole 1
North
Assembly
Hole 3
North South
Assembly
Hole 2
Hole 3

9910048 RevC February 2020 PAGE 7
3. Build North Row
ALERT: Rail on “L” Spacing is ALWAYS on
top of Rail on “S” Spacing. This installation
sequence is critical to system
performance.
Tip: Rail has two holes. Consult the Racking
Construction Set for appropriate hole use.
Snap North Edge, Base Edge, and Array Edge lines.
Tip: Snap Array Edge lines on one or both array
edges (row ends) and snap Base Edge line on the
edge where module mounting will begin.
3.1
See Racking Construction Set for
AEBE dimension.
If not shown, then: AEBE
Tip: “S” spacings are module centered “L”
spacings are between modules.
S
L
Tip: L, S, R, and AEBE
dimensions are found in the
Racking Construction Set.
Spacer Stick
S
L
ALERT: To ensure system
alignment, use the Spacer Stick
to align Module Connectors
before securing Rails.
Place a Rail on all “S” spacings (module centered).
Rails at ends of rows must be flush with array edge.
Place a Rail on all “L” spacings (between modules) on
top of and overlapping the Rails on the S spacing.
Install bolt and tighten to 6ft-lb.
S
L
3.3
Place North Assemblies with the Base Pads along the
North Edge line. The first and last North Assemblies
should be placed with the edge of the Base Pads on
the Base Edge line.
Tip: Raise Tilt Arms after securement of assembly.
3.2 Tip: Base Edge
is in line with
Base Pad
Base edge
measured to
Pad edge

9910048 RevC February 2020
Spacer Stick
L
Tip: Raise Tilt Arms after
bolting assemblies in
preparation for Rail
installation.
S
4. Build Remaining Rows
4.2 Install Rails throughout the array using the same
steps described on the previous page. Alternating
between “S” and “ L” Spacings. Install bolt and
tighten to 6 ft-lb.
ALERT: To ensure system alignment, use the Spacer
Stick to align Module Connectors before securing
Rails.
ALERT: See Appendix F for instructions on installing
Rails on array edges with breaks.
PAGE 8
Place Middle or South assemblies onto
Assemblies from previous row and bolt to 6 ft-lb.
Tip: Racking Construction Set clearly indicates
hole selection. Using the wrong hole will result in
an array which does not match site plan.
4.1
Middle or South
Assembly
Choose correct
hole Note
Orientation
ALERT: Southern Edge Rails face the opposite
direction; bolts securing these rails are tightened
to 6ft-lb.

9910048 RevC February 2020 PAGE 9
5. Place Ballast
Tip: The Racking Construction Set identifies where Ballast is to
be installed. Mark the roof with chalk to speed up installation.
5.1 Install a Rail(s) onto array in locations where Ballast is required.
Bolt Rail to Module Connector and tighten to 6 ft-lb. Rail is
installed to preinstalled nut in Module connector closest to the
Tilt Arm.
ALERT: Every Rail must be fastened to two Module Connector
assemblies.
Tip: Ballast and Rails are only placed on “S” spacings. Center
them on the “S” spacing for equal ballast distribution.
5.2 Place Ballast onto Rails. If rapid cyclic movement of system is
expected e.g. due to seismic activity or building vibration from
activities within or nearby the structure, bend the Rail tabs to
secure Ballast.
ALERT: Install Mechanical Attachments before going to next
step. See: 9910047 - Accessories Installation Manual
2
3
15
4
Ballast Quantity
S
Bend tabs at ends of Rail.
(See 5.2 to determine if required)
Bend Tabs to
capture ballast
as required.
Tip: Installing the north row Ballast
Blocks helps keep the racking
structure from moving as the rest
of the array is built.
When 1-4 Ballast blocks are
required only a single Rail
centered under the module is
required.
Center of Module
When 5 Ballast Blocks are
required there are two Rails
needed. Each rail is offset in
opposite directions to
accommodate 5 Ballast Blocks.
Rails are placed one on top of the
other and bolted to the module
connector. Rail 1 is shifted
to the left
Rail 2 is shifted
to the right
80”
ALERT: Do not step
on ballast blocks

9910048 RevC February 2020
6. Install Module Low Side
PAGE 10
Cam Claw aligned
6.1 Cam Seat
Place module on Cam Seat and
align with Array Edge.
Tip: Ensure the module is vertical
and flush with Seat.
ALERT: Cam Claw is mis-aligned.
R
Tip: R dimension is
found in the Racking
Construction Set.
Tip: Installing modules starting at the south array
edge provides more working room and speeds
installation.
ALERT: Do not leave modules in vertical position, go
immediately to next installation step (high side install).
Cam Claw
Place Cam Claw over module flange.
Apply a small downward force to
make sure it is properly seated.
6.2
ALERT: Install Mechanical Attachments before installing modules.
See: 9910047 - Accessories Installation Manual

9910048 RevC February 2020
7. Install Module High Side
PAGE 11
DO NOT REST MODULE
BACKSHEET ON TILT ARM
Tip: Use two hands when engaging Lock
Claw to ensure correct installation.
LOCK CLAW UNEVENLY
ENGAGED
Tilt Arm
Tongue
Lock Claw
Rotate module down and rest the module
frame on the top of the Tilt Arms.
Tip: Make sure the Tilt Arms are fully
raised.
7.1
Pull the Tilt Arm forward until the Lock
Claw is fully engaged onto the module
frame flange.
7.3
LOCK CLAW NOT FULLY ENGAGED
Support module while carefully
rotating the Tilt Arm just enough
to rest the module frame on the
Lock Claw tongue.
7.2

9910048 RevC February 2020 PAGE 12
7. Continue Installing Modules
Use Cam Claw as spacer to set spacing between adjacent modules.

9910048 RevC February 2020
8. Install Deflectors*
PAGE 13
Place the bottom edge of the Deflector in the
Deflector Seat near the bottom of the Tilt
Arm.
Fasten to Tilt Arm with bolt and tighten to
6ft-lb.
Deflector
Seat
8.1
Center Deflector on module
for all non edge modules
Tip: On array edge Deflectors can be
installed flush to module/array edge.
Tip: Adjacent Deflectors will overlap
(adjacent deflector not shown).
* Consult the Racking Construction Set for deflector requirement. Each Array will specify required Deflectors per array.
ALERT: When forecasted wind gusts exceed 25%
of the wind speed listed in the site criteria table
of the Racking Construction Set, Deflectors must
be installed on all mounted modules to avoid
possible system damage.

9910048 RevC February 2020 PAGE 14
Lock Claw Insertion Gauge configuration and use
Place gauge against Lock Claw and underside
of module.
Select a Lock Claw which has been
confirmed to be installed correctly
through visual inspection.
The Tilt Arm and Lock Claw should
be aligned with the module frame
and the Lock Claw fully engaged
on the frame.
Note: The images shown here are
generic and are applicable across
the entire cFR platform.
Mark line on gauge to finish setup.
Use gauge to confirm full Lock Claw
engagement-line must be visible.
9. Cam & Lock Claw Inspection
Inspect Cam side module connection
Cam installation can be quickly
visually inspected (no gauge is
available or required) by
comparing a known good
installation with all other
installations.
Some gap between Module and
Cam is permissible.
ALERT: A known good installation
can be verified by lifting up on the
module near the Cam. When you
attempt to lift, no movement will
occur.
Module and Cam are near flush.
Module and Cam have a large
non-uniform gap.

9910048 RevC February 2020
Electrical Grounding
Please consult with national and local building code(s) for
complete grounding requirements for your installation. The
clawFR grounding method conforms to ANSI/UL 2703 and is
certified by SolarPTL for use with approved photovoltaic
modules listed under ANSI/UL 1703 and/or ANSI/UL 61730.
Installers can quickly and easily establish ANSI/UL 2703
certified electric bonds between all connected array
components, including modules and mounting system
components, without the use of additional grounding
devices, e.g. ground lugs and copper wire. At least one
ground lug must be used to ground all strings within a
physical sub-array provided the fuse rating for each string
does not exceed 30 amps. Installers may opt to use multiple
lugs per sub-array for redundancy. When grounding devices
are installed according with the approved methodology and
capacity below, the connections described above meet all
the requirements outlined in NEC 690.43.
Grounding Instructions
For modules that have been evaluated for use with clawFR 5 Degree,
please follow the instructions below in Appendix B: UL 2703 Grounding.
Additional information regarding ANSI/UL 2703 and the specific list of
evaluated modules included in PanelClaw’s UL listing can be found in
the “clawFR UL Overview and Module Listing” document (available at
www.panelclaw.com).
For modules that have not been evaluated for use with clawFR, please
follow the instructions below in Appendix D: Electrical Grounding (Non
2703 PV Module).
ALERT: During grounding and bonding ensure there is separation
between bare copper and aluminum or ZAM coated steel components.
PAGE 15

9910048 RevC February 2020
Appendix A: Safety
The subsections below outline some of the obvious / major hazards that could exist during the installation of PanelClaw products and are
divided to bring a level of clarity to such hazards. Some sections do not apply to all PanelClaw product lines and such exclusions are noted
within each section.
Electrical Hazards: PanelClaw products are purely mechanical and do not contain any electrically live parts. When a photovoltaic module is
exposed to sunlight it is electrically live and cannot be turned off. As soon as modules are installed using a PanelClaw system, an electrical
shock hazard is present. All personnel on site should coordinate to ensure that such electrical hazards are clearly communicated. It is advised,
at a minimum, that all personnel utilize caution and proper Personal Protective Equipment as outlined in that section. Only electrically
qualified personnel should perform PV module installation. Refer to OSHA Part 1926 Subpart K –Electrical and NFPA 70E for additional
information.
Fall Hazards: This section only applies to clawFR® products installed on locations six feet or higher above grade. Proper fall protection should
be in place at all work sites. There are many fall protection solutions readily available to help reduce exposure to fall hazards. These may
include personal fall arrest systems, safety nets, guardrails, and flagged setbacks from all roof edges as outlined in OSHA Part 1926 Subpart M
–Fall Protection.
Trip Hazards: All PanelClaw arrays have elevated components that are installed above grade or above a roof surface. Such hazards should be
identified and caution should be taken to avoid tripping over such components. Refer to the Fall Hazards section specifically if working with
the clawFR product line. Make sure to pick up and not drag your feet when working on site, and always pay attention to your path of
movement to note any obstructions that could create a trip hazard.
Lifting Hazards: The PanelClaw installation process involves lifting of heavy items that could lead to personal injury and damage to property.
All personnel should be trained in the proper procedures for manually lifting. Evaluate an object’s size and weight prior to lifting, and follow
these general guidelines for lifting:
1. Assess the lift and know the object weight.
2. Bend at the knees and get a good grip.
3. Keep back straight and lift straight up with legs without twisting. It is important to lift with the legs and not the back.
4. If an object is too large or heavy, ask for help and do not attempt to lift by yourself. In the case that mechanical assistance (e.g. crane,
forklift, etc.) is required to complete the lifting operations, all machine operators of such devices should be licensed and trained.
PAGE 16

9910048 RevC February 2020
Appendix A: Safety (Contd.)
Material Handling: All PanelClaw parts and components are made of aluminum and steel alloys and utilize stainless steel and steel alloy
assembly hardware. These materials are considered non-toxic and require no special handling procedures. Metal components may have
sharp edges, so be sure to handle with care and utilize proper personal protection equipment, especially gloves, during handling. Refer to
OSHA Part 1926 Subpart H –Materials Handling, Storage, Use, and Disposal for additional information.
Personal Protective Equipment (PPE): All personnel should utilize and implement proper PPE per OSHA requirements. Refer to OSHA
requirements for proper use and implementation of PPE. The following items are suggested as a minimum to avoid injury based on the
installation procedure outlined in this manual:
1. Appropriate work clothing
2. Electrically insulated hard hat
3. Protective eyewear
4. EH rated safety boots
5. Gloves
6. High-visibility safety vest
7. Hearing protection
If any PPE appears to be defective, stop the use of such equipment immediately, and ensure it is replaced before work continues. Refer to
OSHA Part 1926 Subpart E –Personal Protective and Life Saving Equipment for additional information.
Hand and Power Tools: Access to all hand and power tools should be regulated and controlled at all times on site to prevent improper use
and related injuries. When not in use, all equipment should be stored in a secured location. Only personnel who have been properly
trained in the safe operation of any potentially dangerous tool should be allowed access. All required tools to perform the installation of
PanelClaw racking are outlined in the installation procedure. All tools should be inspected daily and before use by the operator. If any tool
appears to be defective, stop the use of such equipment immediately, and ensure it is replaced before work continues. Electrical power
tools should follow proper lock-out tag-out procedures per OSHA requirements. Refer to OSHA Part 1926 Subpart I –Tools –Hand and
Power for additional information.
PAGE 17

9910048 RevC February 2020
Appendix B: UL 2703 Grounding
The clawFR 5 Degree flat roof system may be
used to ground and/or mount a PV module
complying with ANSI/UL 1703 or ANSI/UL
61730 only when the specific module has
been evaluated for grounding and/or
mounting in compliance with the included
instructions. For a list of modules which have
been evaluated see PanelClaw’s “clawFR UL
Overview and Module Listing” (see
www.panelclaw.com).
A periodic re-inspection of the system shall
be performed for loose components, loose
fasteners, and any corrosion. If found, they
should be immediately replaced or remedied
in accordance with the system installation
instructions.
System Ground Path
The system ground path “grid” is established throughout the array by the interconnection of system components. Specifically, in the column
direction via the Base and Module Connector connections and in the row direction via the Rail connections. A Tyco lug connected to the Rail
establishes a point of connection for the EGC at one location with a contiguous array. All modules are grounded to the system through their
Cam to Module connection.
Note: The presence of aPV module does not affect the bonding ability of the clawFR system components. More precisely, the grid provides
a means to ground PV Modules which have been evaluated for ANSI/UL 2703 grounding with clawFR.
PAGE 18
To DC
Grounding Path
Ground Lug
Tyco #2106831-1
Row
Column

9910048 RevC February 2020
Appendix B: UL 2703 Grounding (Contd.)
Tyco Grounding lug attachment:
To attach the Tyco grounding device/lug to the Rail, the mounting hex washer and threaded post end should be installed to the specified hole
in the Rail and torqued to 2.08 ft-lb (25 in-lb).Once the grounding device/lug has been attached to the Rail, a copper bonding jumper from an
acceptable DC grounded location outside of the array must be installed to the wire slot end and torqued to 3.75 ft-lb (45 in-lb). For additional
instruction regarding the installation of the Tyco solid wire grounding assembly, please refer to the Tyco Electronics instructions sheet
(document number 408-10262) via their website www.te.com.
Grounding Instructions:
PanelClaw components within the array are required to be
electrically bonded to other DC grounding paths via the use of
appropriately sized Cu wire and a UL 467 listed Tyco Solarlok
grounding assembly, part number 2106831-1, manufactured by
Tyco Electronics Corporation. The conductor size should be
selected in accordance with NEC 690.45 and NEC 250.122.1.
To ground the array, first determine the groupings of strings
whose power output wiring is grounded together at an
equipotential grounding conductor location. This could be all
the strings within a physical sub-array, or all the strings grouped
by a single combiner box. Once the groupings of strings at
equipotential have been determined, a Tyco solid wire
grounding assembly must be attached to one Rail within each
group of strings. PanelClaw’s clawFR Rails have a hole to which
this grounding device/lug can be attached. In an array that
requires multiple bonding jumpers to satisfy the equipotential
requirements, each bonding jumper should be located and
installed on a Rail within the group of strings which will be
grounded by that jumper.
ALERT: Every sub-array must include at least one grounding
device/lug.
PAGE 19

9910048 RevC February 2020
Appendix C: UL 2703 Fire Classification
The system has a Fire Class A rating for low slope roofs with Type I modules when the following requirements are met:
•System is installed over a fire resistant roof covering rated for the application (UL2703, 26.3B)
•Roof slope is less than 2” per ft
•Wind Deflector is required on the Northern perimeter of the array.
The system has a Fire Class A rating for low slope roofs with Type II modules when the following requirements are met:
•System is installed over a fire resistant roof covering rated for the application (UL2703, 26.3B)
•Roof slope is less than 2” per ft
•Wind Deflector is required on the Northern perimeter of the array.
PAGE 20
Table of contents
Popular Rack & Stand manuals by other brands

Vivo
Vivo MOUNT-SONOS1 instruction manual

AJA
AJA DRM2 Installation and operation guide

Victaulic
Victaulic VAPS112 Operating and maintenance instruction manual

RCA
RCA MST46BKR instruction manual

Magnavox
Magnavox M-T00521 owner's manual

All Traffic Solutions
All Traffic Solutions SPBRAC100-ASB installation guide