
3
PageOperation and maintenance manual for the AGRO Multi series boilers with feeders. The producer reserves the right to introduce technical modifications.
1. INTRODUCTION
1.1. Obligations of the user and guidelines concerning safety
To assure operational safety and maintain optimum operation
of the equipment:
• read the manual of the boiler, controller, feeder and observe
their guidelines,
• the manual should be kept and stored in a safe place in the
boiler room allowing using it during any moment of boiler
operation,
• ensure that the drive is never operated by children or persons
who have not read the contents of the manual and adults
with disabilities preventing them from the safe operation,
• the system should be made in compliance with the applica-
ble regulations and in accordance with the rules and recom-
mendations contained in the manual,
• before setting and connecting the boiler check whether all
components are in good working order and whether the
boiler has a complete equipment for servicing and cleaning,
• the boiler should be cleaned on regular basis, at least once
per week, removing a layer of deposited soot and ash, which
reduces the eciency of the boiler,
• ensure continuous access to the equipment,
• avoid exceeding water temperature in boiler over 95°C,
• maintain operating pressure not exceeding 1.5 bar.
NOTE! Boiler installation in accordance with the applicable
standards and regulations and rst start-up should be car-
ried out by a qualied installer.
1.2. Selection of correct power of the boiler
Nominal power of purchased boiler (that is maximum ther-
mal eciency, which can be reached during continuous use
maintaining the eciency declared by the producer) should be
selected in a way corresponding the real demand for thermal
energy even in case of occurrence of very low temperatures.
Do not purchase boiler with power higher than this planned
in the design. Selecting boiler with too high power will result in
higher fuel consumption and lack of full control over the com-
bustion process and therefore higher operation costs, while too
small boiler will not ensure sucient power necessary to heat
up the building.
Approximate boiler power can be calculated using a pow-
er calculator on our website www.pereko.pl Furthermore, you
should also consider: thickness of walls and insulation, the
thermal permeability of rst x joinery (including: tightness of
windows and doors, type of window panels used) and climatic
zone, where the heated building is located.
2. TECHNICAL DESCRIPTION
2.1. Intended use
AGRO Multi feeder boilers belong to a group of low-tempera-
ture boilers and are not subject to registration in the regional
Oce of Technical Inspection. They are intended for operation
in water distribution piping of the gravity hot-water systems or
in open systems with forced circulation in single-family houses,
garages, commercial buildings, maintenance rooms etc. having